Citáce podľa APA (7th ed.)

Zou, X., Wu, G., & Zhang, Q. (2021). Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, construction, and architectural management, 28(6), 1713-1738. https://doi.org/10.1108/ECAM-11-2019-0595

Citácia podle Chicago (17th ed.)

Zou, Xin, Guangchuan Wu, a Qian Zhang. "Work Continuity Constraints in Repetitive Project Scheduling Considering Soft Logic." Engineering, Construction, and Architectural Management 28, no. 6 (2021): 1713-1738. https://doi.org/10.1108/ECAM-11-2019-0595.

Citácia podľa MLA (8th ed.)

Zou, Xin, et al. "Work Continuity Constraints in Repetitive Project Scheduling Considering Soft Logic." Engineering, Construction, and Architectural Management, vol. 28, no. 6, 2021, pp. 1713-1738, https://doi.org/10.1108/ECAM-11-2019-0595.

Upozornenie: Tieto citáce sú generované automaticky. Nemusia byť úplne správne podľa citačných pravidiel..