Mixed-integer linear programming and composed heuristics for three-stage remanufacturing system scheduling problem
The three-stage remanufacturing system scheduling problem (3T-RSSP) has been a hot research topic recently. The remanufacturing system in this paper is equipped with a novel configuration of unrelated parallel disassembly/reassembly workstations and parallel dedicated flow-shop-type reprocessing lin...
Uloženo v:
| Vydáno v: | Engineering applications of artificial intelligence Ročník 137; s. 109257 |
|---|---|
| Hlavní autoři: | , , , , , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Elsevier Ltd
01.11.2024
|
| Témata: | |
| ISSN: | 0952-1976 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
Buďte první, kdo okomentuje tento záznam!