Citáce podľa APA (7th ed.)

Zhao, Z., Jiang, Q., Liu, S., Zhou, M., Yang, X., & Guo, X. (2024). Energy, cost and job-tardiness-minimized scheduling of energy-intensive and high-cost industrial production systems. Engineering applications of artificial intelligence, 133, 108477. https://doi.org/10.1016/j.engappai.2024.108477

Citácia podle Chicago (17th ed.)

Zhao, Ziyan, Qi Jiang, Shixin Liu, MengChu Zhou, Xiaochun Yang, a Xiwang Guo. "Energy, Cost and Job-tardiness-minimized Scheduling of Energy-intensive and High-cost Industrial Production Systems." Engineering Applications of Artificial Intelligence 133 (2024): 108477. https://doi.org/10.1016/j.engappai.2024.108477.

Citácia podľa MLA (8th ed.)

Zhao, Ziyan, et al. "Energy, Cost and Job-tardiness-minimized Scheduling of Energy-intensive and High-cost Industrial Production Systems." Engineering Applications of Artificial Intelligence, vol. 133, 2024, p. 108477, https://doi.org/10.1016/j.engappai.2024.108477.

Upozornenie: Tieto citáce sú generované automaticky. Nemusia byť úplne správne podľa citačných pravidiel..