Solving an Integrated Project Portfolio Selection and Contractor Selection Problem: Fuzzy Goal Programming Based on Fuzzy Preference Relations

Several factors affect the flexibility and the complexity of the project selection and the contractor selection problems. Project portfolio managers are expected to select the best combination of projects and contractors considering multiple conflicting objectives in a multi-period planning horizon....

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Fuzzy information and engineering Ročník 17; číslo 1; s. 75 - 107
Hlavní autori: Zahedirad, Mostafa, Khalili-Damghani, Kaveh, Ghezavati, Vahidreza, Komijan, Alireza Rashidi
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Tsinghua University Press 01.03.2025
Predmet:
ISSN:1616-8658, 1616-8666
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Popis
Shrnutí:Several factors affect the flexibility and the complexity of the project selection and the contractor selection problems. Project portfolio managers are expected to select the best combination of projects and contractors considering multiple conflicting objectives in a multi-period planning horizon. In this paper, we propose an integrated project portfolio optimization and contractor selection problem. The problem is modeled through a multi-objective Mixed Integer Linear Programming (MILP) model. Three solution approaches including Goal Programming (GP), Fuzzy Goal Programming (FGP), and fuzzy goal programming considering a fuzzy preference relationship are proposed. All solution approaches have been applied to a real case. The computational results show the out performance of FGP considering fuzzy relations. The time complexity of the proposed models in the sense of the relation of CPU time and the number constraints and variables of the models were discussed.
ISSN:1616-8658
1616-8666
DOI:10.26599/FIE.2025.9270054