Estimate-at-completion (EAC) prediction using Archimedes optimization with adaptive fuzzy and neural networks

Construction companies estimate project costs at the beginning of the project; however, many factors impact the final project cost. Estimate at Completion (EAC) is a critical approach for estimating the final cost based on actual project performance. This paper aims to improve EAC predictions by int...

Full description

Saved in:
Bibliographic Details
Published in:Automation in construction Vol. 166; p. 105653
Main Authors: Abo Mhady, Ahmed, Budayan, Cenk, Gurgun, Asli Pelin
Format: Journal Article
Language:English
Published: Elsevier B.V 01.10.2024
Subjects:
ISSN:0926-5805
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Abstract Construction companies estimate project costs at the beginning of the project; however, many factors impact the final project cost. Estimate at Completion (EAC) is a critical approach for estimating the final cost based on actual project performance. This paper aims to improve EAC predictions by integrating Adaptive Neuro-Fuzzy Inference Systems (ANFIS) and Artificial Neural Network (ANN) with Archimedes Optimization Algorithm (AOA). The integration of the input optimization algorithm aims to optimize the input features and explore the factors that significantly affect EAC. Using 306 data points from 13 construction projects in Taiwan between 2000 and 2007, this paper developed hybrid models and found a significant improvement in EAC estimation compared to ANN and ANFIS. •Four models (two single and two hybrid) were developed for EAC predictions.•Single models were developed using Adaptive Neuro-Fuzzy Inference Systems (ANFIS) and Artificial Neural Networks (ANN).•Hybrid models were developed by integrating the Archimedes Optimization Algorithm (AOA) into ANN and ANFIS.•AOA selects key parameters, improving accuracy with fewer input parameters.•The AOA-ANN model outperforms the other models with the minimum number of input parameters.
AbstractList Construction companies estimate project costs at the beginning of the project; however, many factors impact the final project cost. Estimate at Completion (EAC) is a critical approach for estimating the final cost based on actual project performance. This paper aims to improve EAC predictions by integrating Adaptive Neuro-Fuzzy Inference Systems (ANFIS) and Artificial Neural Network (ANN) with Archimedes Optimization Algorithm (AOA). The integration of the input optimization algorithm aims to optimize the input features and explore the factors that significantly affect EAC. Using 306 data points from 13 construction projects in Taiwan between 2000 and 2007, this paper developed hybrid models and found a significant improvement in EAC estimation compared to ANN and ANFIS. •Four models (two single and two hybrid) were developed for EAC predictions.•Single models were developed using Adaptive Neuro-Fuzzy Inference Systems (ANFIS) and Artificial Neural Networks (ANN).•Hybrid models were developed by integrating the Archimedes Optimization Algorithm (AOA) into ANN and ANFIS.•AOA selects key parameters, improving accuracy with fewer input parameters.•The AOA-ANN model outperforms the other models with the minimum number of input parameters.
ArticleNumber 105653
Author Abo Mhady, Ahmed
Budayan, Cenk
Gurgun, Asli Pelin
Author_xml – sequence: 1
  givenname: Ahmed
  surname: Abo Mhady
  fullname: Abo Mhady, Ahmed
  email: ahh_m_1991@hotmail.com
  organization: Yildiz Technical University, Faculty of Civil Engineering, Department of Civil Engineering, Esenler, Türkiye
– sequence: 2
  givenname: Cenk
  surname: Budayan
  fullname: Budayan, Cenk
  email: cbudayan@metu.edu.tr
  organization: Middle East Technical University Northern Cyprus Campus, Faculty of Civil Engineering, Department of Civil Engineering, Mersin10, Türkiye
– sequence: 3
  givenname: Asli Pelin
  surname: Gurgun
  fullname: Gurgun, Asli Pelin
  email: apelin@yildiz.edu.tr
  organization: Yildiz Technical University, Faculty of Civil Engineering, Department of Civil Engineering, Esenler, Istanbul, Türkiye
BookMark eNqFkLtOAzEQRV0EiSTwBxQuodhg73spkKIoPKRINFBbfswSh931ynYSJV-Pk6WigGqkOzpXM2eCRp3pAKEbSmaU0Px-M-NbL003i0mchijLs2SExqSK8ygrSXaJJs5tCCEFyasxapfO65Z7iLiPpGn7Brw2Hb5dzhd3uLegtDwHW6e7Tzy3cq1bUOCw6QOoj_y83Wu_xlzxkO0A19vj8YB5p3AHW8ubMPze2C93hS5q3ji4_plT9PG0fF-8RKu359fFfBXJhOQ-UjmUNJxOCy5UKahMRRzXROR1QcuqqIDUheAx5yKpQFWS1pKIUqq0zIjIapFM0cPQK61xzkLNpPbnS73lumGUsJMstmGDLHaSxQZZAU5_wb0NiuzhP-xxwCA8ttNgmZMaOhkMWpCeKaP_LvgGYSWNew
CitedBy_id crossref_primary_10_36680_j_itcon_2025_016
crossref_primary_10_1016_j_autcon_2025_106426
crossref_primary_10_1061_JCEMD4_COENG_16487
crossref_primary_10_32604_cmes_2025_059414
crossref_primary_10_3390_buildings14123772
crossref_primary_10_3390_buildings14113541
crossref_primary_10_3390_buildings14113695
Cites_doi 10.1080/23311916.2023.2220497
10.1016/j.ijproman.2013.12.005
10.1016/j.jksuci.2018.10.007
10.46253/j.mr.v4i3.a4
10.1007/s10489-020-01893-z
10.3846/13923730.2013.801891
10.51526/kbes.2021.2.2.1-12
10.1109/TSMC.1985.6313399
10.3390/electronics10212689
10.1108/13664380680001081
10.1016/j.autcon.2008.12.002
10.1016/j.autcon.2008.07.001
10.58496/MJBD/2021/006
10.3390/buildings13051206
10.1016/S0957-4174(99)00017-2
10.1007/s00521-023-08769-6
10.3390/buildings14030643
10.1016/j.autcon.2014.07.014
10.1061/(ASCE)0733-9364(2009)135:3(178)
10.1155/2019/7081073
10.1002/pmj.20272
10.1016/j.asoc.2013.10.014
10.1016/j.energy.2010.06.001
10.1016/j.jhydrol.2020.125060
10.1002/pmj.21303
10.1016/j.procs.2021.12.079
10.1016/j.engappai.2011.09.022
10.1061/(ASCE)CO.1943-7862.0001008
10.1016/S0895-4356(96)00002-9
10.1016/j.asej.2020.08.019
10.1016/j.jclepro.2021.128039
10.1016/S0933-3657(98)00070-0
10.3390/sym11020190
10.1080/08823871.1994.10462282
10.1016/j.enbuild.2017.11.045
10.1155/2013/832509
10.1080/19942060.2021.1990134
10.1016/j.asej.2021.06.032
10.1108/JOPP-02-2018-0006
10.1061/(ASCE)CO.1943-7862.0001245
10.1016/j.ijproman.2007.02.006
10.1016/j.eswa.2009.11.080
10.1016/j.autcon.2010.02.008
10.1016/j.asoc.2015.09.040
10.1016/j.egyr.2021.10.117
10.1007/s00170-009-2191-8
ContentType Journal Article
Copyright 2024
Copyright_xml – notice: 2024
DBID AAYXX
CITATION
DOI 10.1016/j.autcon.2024.105653
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Economics
Engineering
ExternalDocumentID 10_1016_j_autcon_2024_105653
S0926580524003893
GroupedDBID --K
--M
.~1
0R~
1B1
1~.
1~5
23N
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
AACTN
AAEDT
AAEDW
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AAQXK
AARIN
AAXKI
AAXUO
ABFNM
ABMAC
ABXDB
ACDAQ
ACGFS
ACIWK
ACNNM
ACRLP
ADBBV
ADEZE
ADMUD
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHJVU
AIEXJ
AIKHN
AITUG
AJOXV
AKRWK
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
APLSM
ASPBG
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BLXMC
CS3
EBS
EFJIC
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
GBLVA
HVGLF
HZ~
IHE
J1W
JJJVA
KOM
LY7
M41
MO0
N9A
NEJ
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
RNS
ROL
RPZ
SDF
SDG
SDP
SES
SET
SEW
SPC
SPCBC
SSB
SSD
SST
SSZ
T5K
WUQ
ZMT
~G-
9DU
AATTM
AAYWO
AAYXX
ABJNI
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKYEP
ANKPU
APXCP
CITATION
EFKBS
EFLBG
~HD
ID FETCH-LOGICAL-c306t-d6e8110517abd8b1c4b22f0b6f718979e0f7ba2aab39ed9c1fc0b8cd4850b5fb3
ISICitedReferencesCount 10
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=001290901400001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0926-5805
IngestDate Sat Nov 29 05:17:08 EST 2025
Tue Nov 18 21:50:46 EST 2025
Sat Sep 07 15:51:20 EDT 2024
IsPeerReviewed true
IsScholarly true
Keywords Cost estimation
Neural network
Archimedes optimization algorithm (AOA)
Civil engineering
Adaptive neuro-fuzzy inference systems
Machine learning
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c306t-d6e8110517abd8b1c4b22f0b6f718979e0f7ba2aab39ed9c1fc0b8cd4850b5fb3
ParticipantIDs crossref_citationtrail_10_1016_j_autcon_2024_105653
crossref_primary_10_1016_j_autcon_2024_105653
elsevier_sciencedirect_doi_10_1016_j_autcon_2024_105653
PublicationCentury 2000
PublicationDate October 2024
2024-10-00
PublicationDateYYYYMMDD 2024-10-01
PublicationDate_xml – month: 10
  year: 2024
  text: October 2024
PublicationDecade 2020
PublicationTitle Automation in construction
PublicationYear 2024
Publisher Elsevier B.V
Publisher_xml – name: Elsevier B.V
References Giannuzzi (bb0130) 2023
Matarese (bb0060) 2022
Fathy, Alharbi, Alshammari, Hasanien (bb0225) 2022; 13
Fleming, Koppelman (bb0115) 1998; 16
Nwankpa (bb0250) 2020; 5
Anand (bb0215) 2021; 4
Kaur, Kaur (bb0285) 2012; 2
Hashim, Hussain, Houssein, Mabrouk, Al-Atabany (bb0235) 2021; 51
Durón González, Rivas Tovar, Cárdenas Tapia (bb0110) 2022; 37
Zhang, Band, Jun, Bateni, Chuang, Turabieh, Mafarja, Mosavi, Moslehpour (bb0230) 2021; 7
Awadallah, Bayoumi, Soliman (bb0280) 2009; 60
Takagi, Sugeno (bb0290) 1985; SMC-15 (1)
Cheng, Peng, Wu, Chen (bb0020) 2010; 19
Barrientos-Orellana, Ballesteros-Pérez, Mora-Melià, Cerezo-Narváez, Gutiérrez-Bahamondes (bb0050) 2023; 13
Ehteram, Teo, Ahmed, Latif, Huang, Abozweita, Al-Ansari, El-Shafie (bb0205) 2021; 12
Caron, Ruggeri, Merli (bb0085) 2013; 44
B.-c. Kim, K.F. Reinschmidt, Probabilistic forecasting of project duration using Bayesian inference and the Beta distribution, J. Constr. Eng. Manag. 135 (3) (2009) 178–186
Wang (bb0240) 2017
Mijwel (bb0315) 2021; 2021
Christensen (bb0070) 1993; 25
Kar, Das, Ghosh (bb0275) 2014; 15
Liang, Panahi, Ahmed, Ehteram, Band, Elshafie (bb0220) 2021; 315
.
Tkáč, Verner (bb0180) 2016; 38
Riedel, Chance (bb0075) 1989
Batselier, Vanhoucke (bb0105) 2015; 141
Cheng, Hoang (bb0195) 2014; 20
Maroufpoor, Bozorg-Haddad, Maroufpoor (bb0335) 2020; 588
Talpur, Salleh, Hussain (bb0300) 2017; 226
Salahshoor, Kordestani, Khoshro (bb0330) 2010; 35
Cheng, Tsai, Hsieh (bb0190) 2009; 18
Cheng, Wu (bb0185) 2009; 18
Zeng, An, Smith (bb0010) 2007; 25
Kamoona, Budayan (bb0200) 2019; 2019
Cheng, Hoang, Roy, Wu (bb0030) 2012; 25
Ayalew, Meharie, Ayalew (bb0135) 2023; 10
Kim, White, Ritschel, Millette (bb0120) 2019; 19
Iranmanesh, Zarezadeh (bb0155) 2008
Kumar, Lai, Mohd, Kamal, Ahmed, Sherif, Sefelnasr, El-shafie (bb0265) 2021; 15
Wauters, Vanhoucke (bb0100) 2014; 47
Christensen (bb0035) 1994; 11
Ottaviani, De Marco, Narbaev, Rebuglio (bb0095) 2024; 14
Tayefeh Hashemi, Ebadati, Kaur (bb0150) 2020; 2
Nauck, Kruse (bb0325) 1999; 16
Kwak, Anbari (bb0045) 2012; 43
Abdolrasol, Hussain, Ustun, Sarker, Hannan, Mohamed, Ali, Mekhilef, Milad (bb0320) 2021; 10
Arora, Kaur (bb0015) 2022; 34
De Marco, Narbaev, Ottaviani, Vanhoucke (bb0145) 2024; 24
Golizadeh, Banihashemi, Sadeghifam, Preece (bb0160) 2017; 17
Al-Zewairi, Almajali, Awajan (bb0260) 2017
Ayer, Chen, Burnside (bb0305) 2013; 2013
Abellan-Nebot, Romero Subirón (bb0055) 2010; 47
Glorot, Bordes, Bengio (bb0245) 2011; vol. 15
Mitra, Paul (bb0270) 2017; 12
Babar, Thaheem, Ayub (bb0080) 2017; 143
Zor, Timur, Teke (bb0310) 2017
Narbaev, De Marco (bb0090) 2014; 32
Kern, Formoso (bb0005) 2006; 11
Ottaviani, Marco (bb0140) 2022; 196
Aslan (bb0210) 2023; 35
AlHares, Budayan (bb0040) 2019; 11
Cheng, Tsai, Sudjono (bb0025) 2010; 37
Tu (bb0170) 1996; 49
Araba, Memon, Alhawat, Ali, Milad (bb0065) 2021; 2
Feylizadeh, Hendalianpour, Bagherpour (bb0165) 2012; 3
Bjornson, Barney (bb0175) 1999; 17
J.S.R. Jang, C.T. Sun, E. Mizutani, Neuro-Fuzzy and Soft Computing: A Computational Approach to Learning and Machine Intelligence, Prentice Hall, Upper Saddle River, New Jersey, 1997. ISBN-13: 9780132610667.
Bre, Gimenez, Fachinotti (bb0255) 2018; 158
Feylizadeh (10.1016/j.autcon.2024.105653_bb0165) 2012; 3
Kern (10.1016/j.autcon.2024.105653_bb0005) 2006; 11
Riedel (10.1016/j.autcon.2024.105653_bb0075) 1989
Ayer (10.1016/j.autcon.2024.105653_bb0305) 2013; 2013
Maroufpoor (10.1016/j.autcon.2024.105653_bb0335) 2020; 588
Golizadeh (10.1016/j.autcon.2024.105653_bb0160) 2017; 17
Aslan (10.1016/j.autcon.2024.105653_bb0210) 2023; 35
Kumar (10.1016/j.autcon.2024.105653_bb0265) 2021; 15
Liang (10.1016/j.autcon.2024.105653_bb0220) 2021; 315
Zor (10.1016/j.autcon.2024.105653_bb0310) 2017
Al-Zewairi (10.1016/j.autcon.2024.105653_bb0260) 2017
Ayalew (10.1016/j.autcon.2024.105653_bb0135) 2023; 10
Tayefeh Hashemi (10.1016/j.autcon.2024.105653_bb0150) 2020; 2
Ottaviani (10.1016/j.autcon.2024.105653_bb0140) 2022; 196
Cheng (10.1016/j.autcon.2024.105653_bb0030) 2012; 25
Barrientos-Orellana (10.1016/j.autcon.2024.105653_bb0050) 2023; 13
Mitra (10.1016/j.autcon.2024.105653_bb0270) 2017; 12
Iranmanesh (10.1016/j.autcon.2024.105653_bb0155) 2008
Salahshoor (10.1016/j.autcon.2024.105653_bb0330) 2010; 35
Matarese (10.1016/j.autcon.2024.105653_bb0060) 2022
Abdolrasol (10.1016/j.autcon.2024.105653_bb0320) 2021; 10
Kar (10.1016/j.autcon.2024.105653_bb0275) 2014; 15
Cheng (10.1016/j.autcon.2024.105653_bb0190) 2009; 18
Narbaev (10.1016/j.autcon.2024.105653_bb0090) 2014; 32
Fathy (10.1016/j.autcon.2024.105653_bb0225) 2022; 13
Tu (10.1016/j.autcon.2024.105653_bb0170) 1996; 49
Fleming (10.1016/j.autcon.2024.105653_bb0115) 1998; 16
Ottaviani (10.1016/j.autcon.2024.105653_bb0095) 2024; 14
Bjornson (10.1016/j.autcon.2024.105653_bb0175) 1999; 17
Mijwel (10.1016/j.autcon.2024.105653_bb0315) 2021; 2021
Kwak (10.1016/j.autcon.2024.105653_bb0045) 2012; 43
Hashim (10.1016/j.autcon.2024.105653_bb0235) 2021; 51
Batselier (10.1016/j.autcon.2024.105653_bb0105) 2015; 141
Anand (10.1016/j.autcon.2024.105653_bb0215) 2021; 4
Nwankpa (10.1016/j.autcon.2024.105653_bb0250) 2020; 5
Kaur (10.1016/j.autcon.2024.105653_bb0285) 2012; 2
Nauck (10.1016/j.autcon.2024.105653_bb0325) 1999; 16
Bre (10.1016/j.autcon.2024.105653_bb0255) 2018; 158
Giannuzzi (10.1016/j.autcon.2024.105653_bb0130)
Cheng (10.1016/j.autcon.2024.105653_bb0185) 2009; 18
Babar (10.1016/j.autcon.2024.105653_bb0080) 2017; 143
Awadallah (10.1016/j.autcon.2024.105653_bb0280) 2009; 60
Takagi (10.1016/j.autcon.2024.105653_bb0290) 1985; SMC-15 (1)
Talpur (10.1016/j.autcon.2024.105653_bb0300) 2017; 226
Kim (10.1016/j.autcon.2024.105653_bb0120) 2019; 19
Tkáč (10.1016/j.autcon.2024.105653_bb0180) 2016; 38
Kamoona (10.1016/j.autcon.2024.105653_bb0200) 2019; 2019
Wauters (10.1016/j.autcon.2024.105653_bb0100) 2014; 47
Arora (10.1016/j.autcon.2024.105653_bb0015) 2022; 34
Wang (10.1016/j.autcon.2024.105653_bb0240) 2017
Christensen (10.1016/j.autcon.2024.105653_bb0070) 1993; 25
Cheng (10.1016/j.autcon.2024.105653_bb0195) 2014; 20
Ehteram (10.1016/j.autcon.2024.105653_bb0205) 2021; 12
Zhang (10.1016/j.autcon.2024.105653_bb0230) 2021; 7
Cheng (10.1016/j.autcon.2024.105653_bb0020) 2010; 19
De Marco (10.1016/j.autcon.2024.105653_bb0145) 2024; 24
10.1016/j.autcon.2024.105653_bb0295
Abellan-Nebot (10.1016/j.autcon.2024.105653_bb0055) 2010; 47
10.1016/j.autcon.2024.105653_bb0125
Araba (10.1016/j.autcon.2024.105653_bb0065) 2021; 2
Zeng (10.1016/j.autcon.2024.105653_bb0010) 2007; 25
Cheng (10.1016/j.autcon.2024.105653_bb0025) 2010; 37
AlHares (10.1016/j.autcon.2024.105653_bb0040) 2019; 11
Caron (10.1016/j.autcon.2024.105653_bb0085) 2013; 44
Durón González (10.1016/j.autcon.2024.105653_bb0110) 2022; 37
Christensen (10.1016/j.autcon.2024.105653_bb0035) 1994; 11
Glorot (10.1016/j.autcon.2024.105653_bb0245) 2011; vol. 15
References_xml – volume: 11
  start-page: 17
  year: 1994
  end-page: 23
  ident: bb0035
  article-title: Using performance indices to evaluate the estimate at completion
  publication-title: Journal of Cost Analysis and Management
– volume: 17
  start-page: 197
  year: 2017
  end-page: 209
  ident: bb0160
  article-title: Automated estimation of completion time for dam projects
  publication-title: Int. J. Constr. Manag.
– volume: 38
  start-page: 788
  year: 2016
  end-page: 804
  ident: bb0180
  article-title: Artificial neural networks in business: two decades of research
  publication-title: Appl. Soft Comput.
– volume: 2
  start-page: 323
  year: 2012
  end-page: 325
  ident: bb0285
  article-title: Comparison of mamdani-type and sugeno-type fuzzy inference systems for air conditioning system
  publication-title: International Journal of Soft Computing and Engineering (IJSCE)
– volume: 196
  start-page: 808
  year: 2022
  end-page: 815
  ident: bb0140
  article-title: Multiple linear regression model for improved project cost forecasting
  publication-title: Procedia Computer Science
– volume: 37
  start-page: 4224
  year: 2010
  end-page: 4231
  ident: bb0025
  article-title: Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry
  publication-title: Expert Syst. Appl.
– volume: 47
  start-page: 92
  year: 2014
  end-page: 106
  ident: bb0100
  article-title: Support vector machine regression for project control forecasting
  publication-title: Autom. Constr.
– volume: 141
  start-page: 05015010
  year: 2015
  ident: bb0105
  article-title: Empirical evaluation of earned value management forecasting accuracy for time and cost
  publication-title: J. Constr. Eng. Manag.
– volume: 226
  year: 2017
  ident: bb0300
  article-title: An investigation of membership functions on performance of ANFIS for solving classification problems
  publication-title: IOP Conference Series: Materials Science and Engineering
– reference: B.-c. Kim, K.F. Reinschmidt, Probabilistic forecasting of project duration using Bayesian inference and the Beta distribution, J. Constr. Eng. Manag. 135 (3) (2009) 178–186,
– volume: 588
  year: 2020
  ident: bb0335
  article-title: Reference evapotranspiration estimating based on optimal input combination and hybrid artificial intelligent model: hybridization of artificial neural network with grey wolf optimizer algorithm
  publication-title: J. Hydrol.
– volume: 15
  start-page: 1843
  year: 2021
  end-page: 1867
  ident: bb0265
  article-title: Enhancement of nitrogen prediction accuracy through a new hybrid model using ant colony optimization and an Elman neural network
  publication-title: Engineering Applications of Computational Fluid Mechanics
– volume: 3
  start-page: 477
  year: 2012
  end-page: 484
  ident: bb0165
  article-title: A fuzzy neural network to estimate at completion costs of construction projects
  publication-title: Int. J. Ind. Eng. Comput.
– volume: 158
  start-page: 1429
  year: 2018
  end-page: 1441
  ident: bb0255
  article-title: Prediction of wind pressure coefficients on building surfaces using artificial neural networks
  publication-title: Energ. Buildings
– volume: 15
  start-page: 243
  year: 2014
  end-page: 259
  ident: bb0275
  article-title: Applications of neuro fuzzy systems: a brief review and future outline
  publication-title: Appl. Soft Comput.
– year: 2023
  ident: bb0130
  article-title: Programme Management Monitoring and Controlling: Statistical Predictive Models to Improve Estimate at Completion, Master Dissertation
– volume: 143
  start-page: 04016104
  year: 2017
  ident: bb0080
  article-title: Estimated cost at completion: integrating risk into earned value management
  publication-title: J. Constr. Eng. Manag.
– volume: 43
  start-page: 77
  year: 2012
  end-page: 90
  ident: bb0045
  article-title: History, practices, and future of earned value management in government: Perspectives from NASA
  publication-title: Proj. Manag. J.
– volume: 25
  start-page: 17
  year: 1993
  end-page: 25
  ident: bb0070
  article-title: Determining an accurate estimate at completion
  publication-title: National Contract Management Journal
– volume: 17
  start-page: 13
  year: 1999
  end-page: 19
  ident: bb0175
  article-title: Identifying significant model inputs with neural networks: tax court determination of reasonable compensation
  publication-title: Expert Syst. Appl.
– volume: 10
  start-page: 2689
  year: 2021
  ident: bb0320
  article-title: Artificial neural networks based optimization techniques: a review
  publication-title: Electronics
– start-page: 351
  year: 2017
  end-page: 356
  ident: bb0240
  article-title: Overview of the Research Status on Artificial Neural Networks, 2nd International Forum on Management, Education and Information Technology Application (IFMEITA 2017)
– volume: 10
  start-page: 2220497
  year: 2023
  ident: bb0135
  article-title: Regression modeling for prediction of earned value indexes in public building construction projects: the case of Ethiopia
  publication-title: Cogent Engineering
– volume: 47
  start-page: 237
  year: 2010
  end-page: 257
  ident: bb0055
  article-title: A review of machining monitoring systems based on artificial intelligence process models
  publication-title: Int. J. Adv. Manuf. Technol.
– volume: 32
  start-page: 1007
  year: 2014
  end-page: 1018
  ident: bb0090
  article-title: An earned schedule-based regression model to improve cost estimate at completion
  publication-title: Int. J. Proj. Manag.
– volume: 5
  start-page: 563
  year: 2020
  end-page: 577
  ident: bb0250
  article-title: Advances in optimisation algorithms and techniques for deep learning, advances in science
  publication-title: Technology and Engineering Systems Journal
– start-page: 167
  year: 2017
  end-page: 172
  ident: bb0260
  article-title: Experimental evaluation of a multi-layer feed-forward artificial neural network classifier for network intrusion detection system
  publication-title: 2017 International Conference on New Trends in Computing Sciences (ICTCS)
– volume: 2013
  year: 2013
  ident: bb0305
  article-title: Artificial neural networks in mammography interpretation and diagnostic decision making
  publication-title: Comput. Math. Methods Med.
– volume: 12
  start-page: 1665
  year: 2021
  end-page: 1676
  ident: bb0205
  article-title: Performance improvement for infiltration rate prediction using hybridized adaptive neuro-fuzzy inferences system (ANFIS) with optimization algorithms
  publication-title: Ain Shams Eng. J.
– volume: 24
  start-page: 935
  year: 2024
  end-page: 945
  ident: bb0145
  article-title: Influence of cost contingency management on project estimates at completion
  publication-title: Int. J. Constr. Manag.
– volume: 35
  start-page: 19627
  year: 2023
  end-page: 19649
  ident: bb0210
  article-title: Archimedes optimization algorithm based approaches for solving energy demand estimation problem: a case study of Turkey
  publication-title: Neural Comput. & Applic.
– reference: J.S.R. Jang, C.T. Sun, E. Mizutani, Neuro-Fuzzy and Soft Computing: A Computational Approach to Learning and Machine Intelligence, Prentice Hall, Upper Saddle River, New Jersey, 1997. ISBN-13: 9780132610667.
– volume: 19
  start-page: 619
  year: 2010
  end-page: 629
  ident: bb0020
  article-title: Estimate at completion for construction projects using evolutionary support vector machine inference model
  publication-title: Autom. Constr.
– volume: 16
  start-page: 19
  year: 1998
  end-page: 23
  ident: bb0115
  article-title: Earned value Project Management
  publication-title: Engineering
– volume: 4
  start-page: 25
  year: 2021
  end-page: 33
  ident: bb0215
  article-title: Archimedes optimization algorithm: heart disease prediction
  publication-title: Multimedia Research
– volume: 49
  start-page: 1225
  year: 1996
  end-page: 1231
  ident: bb0170
  article-title: Advantages and disadvantages of using artificial neural networks versus logistic regression for predicting medical outcomes
  publication-title: J. Clin. Epidemiol.
– volume: 12
  start-page: 255
  year: 2017
  end-page: 264
  ident: bb0270
  article-title: Hybrid time-series models for forecasting agricultural commodity prices
  publication-title: Model. Assist. Stat. Appl.
– volume: 25
  start-page: 744
  year: 2012
  end-page: 752
  ident: bb0030
  article-title: A novel time-depended evolutionary fuzzy SVM inference model for estimating construction project at completion
  publication-title: Eng. Appl. Artif. Intell.
– volume: 2019
  start-page: 7081073
  year: 2019
  ident: bb0200
  article-title: Implementation of genetic algorithm integrated with the deep neural network for estimating at completion simulation
  publication-title: Advances in Civil Engineering
– volume: 13
  start-page: 1206
  year: 2023
  ident: bb0050
  article-title: Comparison of the stability and accuracy of deterministic project cost prediction methods in earned value management
  publication-title: Buildings
– volume: 20
  start-page: 223
  year: 2014
  end-page: 236
  ident: bb0195
  article-title: Interval estimation of construction cost at completion using least squares support vector machine
  publication-title: J. Civ. Eng. Manag.
– volume: 16
  start-page: 149
  year: 1999
  end-page: 169
  ident: bb0325
  article-title: Obtaining interpretable fuzzy classification rules from medical data
  publication-title: Artif. Intell. Med.
– start-page: 240
  year: 2008
  end-page: 243
  ident: bb0155
  article-title: Application of artificial neural network to forecast actual cost of a project to improve earned value management system
  publication-title: World congress on science, engineering and technology
– volume: 315
  year: 2021
  ident: bb0220
  article-title: Predicting municipal solid waste using a coupled artificial neural network with archimedes optimisation algorithm and socioeconomic components
  publication-title: J. Clean. Prod.
– volume: 13
  year: 2022
  ident: bb0225
  article-title: Archimedes optimization algorithm based maximum power point tracker for wind energy generation system
  publication-title: Ain Shams Eng. J.
– volume: 60
  start-page: 3
  year: 2009
  end-page: 11
  ident: bb0280
  article-title: Adaptive deadbeat controllers for brushless DC drives using PSO and ANFIS techniques
  publication-title: J. Electr. Eng.
– volume: 19
  start-page: 186
  year: 2019
  end-page: 200
  ident: bb0120
  article-title: Revisiting reliability of estimates at completion for department of defense contracts
  publication-title: Journal of Public Procurement
– start-page: 1
  year: 2017
  end-page: 7
  ident: bb0310
  article-title: A state-of-the-art review of artificial intelligence techniques for short-term electric load forecasting, 6th international youth conference on energy (IYCE), IEEE, Budapest
  publication-title: Hungary
– volume: 11
  start-page: 75
  year: 2006
  end-page: 90
  ident: bb0005
  article-title: A model for integrating cost management and production planning and control in construction
  publication-title: J. Financ. Manag. Prop. Constr.
– start-page: 30
  year: 2022
  end-page: 82
  ident: bb0060
  article-title: Literature review of project cost estimate at completion forecasting methods, master dissertation, engineering and management
  publication-title: Politecnico Di Torino
– volume: 44
  start-page: 3
  year: 2013
  end-page: 16
  ident: bb0085
  article-title: A bayesian approach to improve estimate at completion in earned value management
  publication-title: Proj. Manag. J.
– volume: 25
  start-page: 589
  year: 2007
  end-page: 600
  ident: bb0010
  article-title: Application of a fuzzy based decision making methodology to construction project risk assessment
  publication-title: Int. J. Proj. Manag.
– volume: 2
  start-page: 1703
  year: 2020
  ident: bb0150
  article-title: Cost estimation and prediction in construction projects: a systematic review on machine learning techniques, SN
  publication-title: Appl. Sci.
– volume: 18
  start-page: 164
  year: 2009
  end-page: 172
  ident: bb0190
  article-title: Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model
  publication-title: Autom. Constr.
– volume: 2021
  start-page: 29
  year: 2021
  end-page: 31
  ident: bb0315
  article-title: Artificial neural networks advantages and disadvantages
  publication-title: Mesopotamian Journal of Big Data
– volume: 51
  start-page: 1531
  year: 2021
  end-page: 1551
  ident: bb0235
  article-title: Archimedes optimization algorithm: a new metaheuristic algorithm for solving optimization problems
  publication-title: Appl. Intell.
– year: 1989
  ident: bb0075
  article-title: Estimates at Completion (EAC): A Guide to their Calculation and Application for Aircraft, Avionics, and Engine Programs
– volume: 2
  start-page: 1
  year: 2021
  end-page: 12
  ident: bb0065
  article-title: Estimation at completion in civil engineering projects: review of regression and soft computing models
  publication-title: Knowledge-Based Engineering and Sciences
– volume: 34
  start-page: 308
  year: 2022
  end-page: 315
  ident: bb0015
  article-title: An escalated convergent firefly algorithm
  publication-title: Journal of King Saud University-Computer and Information Sciences
– volume: SMC-15 (1)
  start-page: 116
  year: 1985
  end-page: 132
  ident: bb0290
  article-title: Fuzzy identification of systems and its applications to modeling and control
  publication-title: IEEE Trans. Syst. Man Cybern.
– reference: .
– volume: 11
  start-page: 190
  year: 2019
  ident: bb0040
  article-title: Estimation at completion simulation using the potential of soft computing models: case study of construction engineering projects
  publication-title: Symmetry
– volume: 37
  start-page: 405
  year: 2022
  end-page: 416
  ident: bb0110
  article-title: Evaluation of EVM/ES forecasting methods in hospital construction projects
  publication-title: Revista ingeniería de construcción
– volume: vol. 15
  start-page: 315
  year: 2011
  end-page: 323
  ident: bb0245
  article-title: Deep Sparse Rectifier Neural Networks, Proceedings of the Fourteenth International Conference on Artificial Intelligence and Statistics
– volume: 14
  year: 2024
  ident: bb0095
  article-title: Improving project estimates at completion through Progress-based performance factors
  publication-title: Buildings
– volume: 18
  start-page: 597
  year: 2009
  end-page: 604
  ident: bb0185
  article-title: Evolutionary support vector machine inference system for construction management
  publication-title: Autom. Constr.
– volume: 35
  start-page: 5472
  year: 2010
  end-page: 5482
  ident: bb0330
  article-title: Fault detection and diagnosis of an industrial steam turbine using fusion of SVM (support vector machine) and ANFIS (adaptive neuro-fuzzy inference system) classifiers
  publication-title: Energy
– volume: 7
  start-page: 8973
  year: 2021
  end-page: 8996
  ident: bb0230
  article-title: Solar radiation estimation in different climates with meteorological variables using Bayesian model averaging and new soft computing models
  publication-title: Energy Rep.
– volume: 10
  start-page: 2220497
  issue: 1
  year: 2023
  ident: 10.1016/j.autcon.2024.105653_bb0135
  article-title: Regression modeling for prediction of earned value indexes in public building construction projects: the case of Ethiopia
  publication-title: Cogent Engineering
  doi: 10.1080/23311916.2023.2220497
– volume: vol. 15
  start-page: 315
  year: 2011
  ident: 10.1016/j.autcon.2024.105653_bb0245
– volume: 32
  start-page: 1007
  issue: 6
  year: 2014
  ident: 10.1016/j.autcon.2024.105653_bb0090
  article-title: An earned schedule-based regression model to improve cost estimate at completion
  publication-title: Int. J. Proj. Manag.
  doi: 10.1016/j.ijproman.2013.12.005
– start-page: 167
  year: 2017
  ident: 10.1016/j.autcon.2024.105653_bb0260
  article-title: Experimental evaluation of a multi-layer feed-forward artificial neural network classifier for network intrusion detection system
– volume: 34
  start-page: 308
  issue: 2
  year: 2022
  ident: 10.1016/j.autcon.2024.105653_bb0015
  article-title: An escalated convergent firefly algorithm
  publication-title: Journal of King Saud University-Computer and Information Sciences
  doi: 10.1016/j.jksuci.2018.10.007
– volume: 25
  start-page: 17
  issue: 1
  year: 1993
  ident: 10.1016/j.autcon.2024.105653_bb0070
  article-title: Determining an accurate estimate at completion
  publication-title: National Contract Management Journal
– volume: 4
  start-page: 25
  issue: 3
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0215
  article-title: Archimedes optimization algorithm: heart disease prediction
  publication-title: Multimedia Research
  doi: 10.46253/j.mr.v4i3.a4
– volume: 51
  start-page: 1531
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0235
  article-title: Archimedes optimization algorithm: a new metaheuristic algorithm for solving optimization problems
  publication-title: Appl. Intell.
  doi: 10.1007/s10489-020-01893-z
– volume: 20
  start-page: 223
  issue: 2
  year: 2014
  ident: 10.1016/j.autcon.2024.105653_bb0195
  article-title: Interval estimation of construction cost at completion using least squares support vector machine
  publication-title: J. Civ. Eng. Manag.
  doi: 10.3846/13923730.2013.801891
– volume: 2
  start-page: 1
  issue: 2
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0065
  article-title: Estimation at completion in civil engineering projects: review of regression and soft computing models
  publication-title: Knowledge-Based Engineering and Sciences
  doi: 10.51526/kbes.2021.2.2.1-12
– volume: SMC-15 (1)
  start-page: 116
  year: 1985
  ident: 10.1016/j.autcon.2024.105653_bb0290
  article-title: Fuzzy identification of systems and its applications to modeling and control
  publication-title: IEEE Trans. Syst. Man Cybern.
  doi: 10.1109/TSMC.1985.6313399
– volume: 24
  start-page: 935
  issue: 9
  year: 2024
  ident: 10.1016/j.autcon.2024.105653_bb0145
  article-title: Influence of cost contingency management on project estimates at completion
  publication-title: Int. J. Constr. Manag.
– volume: 10
  start-page: 2689
  issue: 21
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0320
  article-title: Artificial neural networks based optimization techniques: a review
  publication-title: Electronics
  doi: 10.3390/electronics10212689
– volume: 11
  start-page: 75
  issue: 2
  year: 2006
  ident: 10.1016/j.autcon.2024.105653_bb0005
  article-title: A model for integrating cost management and production planning and control in construction
  publication-title: J. Financ. Manag. Prop. Constr.
  doi: 10.1108/13664380680001081
– volume: 18
  start-page: 597
  issue: 5
  year: 2009
  ident: 10.1016/j.autcon.2024.105653_bb0185
  article-title: Evolutionary support vector machine inference system for construction management
  publication-title: Autom. Constr.
  doi: 10.1016/j.autcon.2008.12.002
– ident: 10.1016/j.autcon.2024.105653_bb0130
– volume: 3
  start-page: 477
  issue: 3
  year: 2012
  ident: 10.1016/j.autcon.2024.105653_bb0165
  article-title: A fuzzy neural network to estimate at completion costs of construction projects
  publication-title: Int. J. Ind. Eng. Comput.
– volume: 12
  start-page: 255
  issue: 3
  year: 2017
  ident: 10.1016/j.autcon.2024.105653_bb0270
  article-title: Hybrid time-series models for forecasting agricultural commodity prices
  publication-title: Model. Assist. Stat. Appl.
– volume: 2
  start-page: 1703
  issue: 10
  year: 2020
  ident: 10.1016/j.autcon.2024.105653_bb0150
  article-title: Cost estimation and prediction in construction projects: a systematic review on machine learning techniques, SN
  publication-title: Appl. Sci.
– start-page: 30
  year: 2022
  ident: 10.1016/j.autcon.2024.105653_bb0060
  article-title: Literature review of project cost estimate at completion forecasting methods, master dissertation, engineering and management
  publication-title: Politecnico Di Torino
– volume: 18
  start-page: 164
  issue: 2
  year: 2009
  ident: 10.1016/j.autcon.2024.105653_bb0190
  article-title: Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model
  publication-title: Autom. Constr.
  doi: 10.1016/j.autcon.2008.07.001
– volume: 2
  start-page: 323
  issue: 2
  year: 2012
  ident: 10.1016/j.autcon.2024.105653_bb0285
  article-title: Comparison of mamdani-type and sugeno-type fuzzy inference systems for air conditioning system
  publication-title: International Journal of Soft Computing and Engineering (IJSCE)
– volume: 2021
  start-page: 29
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0315
  article-title: Artificial neural networks advantages and disadvantages
  publication-title: Mesopotamian Journal of Big Data
  doi: 10.58496/MJBD/2021/006
– volume: 13
  start-page: 1206
  issue: 5
  year: 2023
  ident: 10.1016/j.autcon.2024.105653_bb0050
  article-title: Comparison of the stability and accuracy of deterministic project cost prediction methods in earned value management
  publication-title: Buildings
  doi: 10.3390/buildings13051206
– volume: 17
  start-page: 13
  issue: 1
  year: 1999
  ident: 10.1016/j.autcon.2024.105653_bb0175
  article-title: Identifying significant model inputs with neural networks: tax court determination of reasonable compensation
  publication-title: Expert Syst. Appl.
  doi: 10.1016/S0957-4174(99)00017-2
– start-page: 351
  year: 2017
  ident: 10.1016/j.autcon.2024.105653_bb0240
– volume: 35
  start-page: 19627
  issue: 26
  year: 2023
  ident: 10.1016/j.autcon.2024.105653_bb0210
  article-title: Archimedes optimization algorithm based approaches for solving energy demand estimation problem: a case study of Turkey
  publication-title: Neural Comput. & Applic.
  doi: 10.1007/s00521-023-08769-6
– volume: 14
  issue: 3
  year: 2024
  ident: 10.1016/j.autcon.2024.105653_bb0095
  article-title: Improving project estimates at completion through Progress-based performance factors
  publication-title: Buildings
  doi: 10.3390/buildings14030643
– volume: 47
  start-page: 92
  year: 2014
  ident: 10.1016/j.autcon.2024.105653_bb0100
  article-title: Support vector machine regression for project control forecasting
  publication-title: Autom. Constr.
  doi: 10.1016/j.autcon.2014.07.014
– volume: 60
  start-page: 3
  issue: 1
  year: 2009
  ident: 10.1016/j.autcon.2024.105653_bb0280
  article-title: Adaptive deadbeat controllers for brushless DC drives using PSO and ANFIS techniques
  publication-title: J. Electr. Eng.
– ident: 10.1016/j.autcon.2024.105653_bb0125
  doi: 10.1061/(ASCE)0733-9364(2009)135:3(178)
– volume: 2019
  start-page: 7081073
  year: 2019
  ident: 10.1016/j.autcon.2024.105653_bb0200
  article-title: Implementation of genetic algorithm integrated with the deep neural network for estimating at completion simulation
  publication-title: Advances in Civil Engineering
  doi: 10.1155/2019/7081073
– volume: 43
  start-page: 77
  issue: 1
  year: 2012
  ident: 10.1016/j.autcon.2024.105653_bb0045
  article-title: History, practices, and future of earned value management in government: Perspectives from NASA
  publication-title: Proj. Manag. J.
  doi: 10.1002/pmj.20272
– year: 1989
  ident: 10.1016/j.autcon.2024.105653_bb0075
– volume: 15
  start-page: 243
  year: 2014
  ident: 10.1016/j.autcon.2024.105653_bb0275
  article-title: Applications of neuro fuzzy systems: a brief review and future outline
  publication-title: Appl. Soft Comput.
  doi: 10.1016/j.asoc.2013.10.014
– volume: 35
  start-page: 5472
  issue: 12
  year: 2010
  ident: 10.1016/j.autcon.2024.105653_bb0330
  article-title: Fault detection and diagnosis of an industrial steam turbine using fusion of SVM (support vector machine) and ANFIS (adaptive neuro-fuzzy inference system) classifiers
  publication-title: Energy
  doi: 10.1016/j.energy.2010.06.001
– volume: 588
  year: 2020
  ident: 10.1016/j.autcon.2024.105653_bb0335
  article-title: Reference evapotranspiration estimating based on optimal input combination and hybrid artificial intelligent model: hybridization of artificial neural network with grey wolf optimizer algorithm
  publication-title: J. Hydrol.
  doi: 10.1016/j.jhydrol.2020.125060
– volume: 44
  start-page: 3
  issue: 1
  year: 2013
  ident: 10.1016/j.autcon.2024.105653_bb0085
  article-title: A bayesian approach to improve estimate at completion in earned value management
  publication-title: Proj. Manag. J.
  doi: 10.1002/pmj.21303
– volume: 196
  start-page: 808
  year: 2022
  ident: 10.1016/j.autcon.2024.105653_bb0140
  article-title: Multiple linear regression model for improved project cost forecasting
  publication-title: Procedia Computer Science
  doi: 10.1016/j.procs.2021.12.079
– volume: 17
  start-page: 197
  issue: 3
  year: 2017
  ident: 10.1016/j.autcon.2024.105653_bb0160
  article-title: Automated estimation of completion time for dam projects
  publication-title: Int. J. Constr. Manag.
– volume: 5
  start-page: 563
  issue: 5
  year: 2020
  ident: 10.1016/j.autcon.2024.105653_bb0250
  article-title: Advances in optimisation algorithms and techniques for deep learning, advances in science
  publication-title: Technology and Engineering Systems Journal
– volume: 25
  start-page: 744
  issue: 4
  year: 2012
  ident: 10.1016/j.autcon.2024.105653_bb0030
  article-title: A novel time-depended evolutionary fuzzy SVM inference model for estimating construction project at completion
  publication-title: Eng. Appl. Artif. Intell.
  doi: 10.1016/j.engappai.2011.09.022
– volume: 141
  start-page: 05015010
  issue: 11
  year: 2015
  ident: 10.1016/j.autcon.2024.105653_bb0105
  article-title: Empirical evaluation of earned value management forecasting accuracy for time and cost
  publication-title: J. Constr. Eng. Manag.
  doi: 10.1061/(ASCE)CO.1943-7862.0001008
– volume: 49
  start-page: 1225
  issue: 11
  year: 1996
  ident: 10.1016/j.autcon.2024.105653_bb0170
  article-title: Advantages and disadvantages of using artificial neural networks versus logistic regression for predicting medical outcomes
  publication-title: J. Clin. Epidemiol.
  doi: 10.1016/S0895-4356(96)00002-9
– volume: 12
  start-page: 1665
  issue: 2
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0205
  article-title: Performance improvement for infiltration rate prediction using hybridized adaptive neuro-fuzzy inferences system (ANFIS) with optimization algorithms
  publication-title: Ain Shams Eng. J.
  doi: 10.1016/j.asej.2020.08.019
– volume: 315
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0220
  article-title: Predicting municipal solid waste using a coupled artificial neural network with archimedes optimisation algorithm and socioeconomic components
  publication-title: J. Clean. Prod.
  doi: 10.1016/j.jclepro.2021.128039
– volume: 16
  start-page: 149
  issue: 2
  year: 1999
  ident: 10.1016/j.autcon.2024.105653_bb0325
  article-title: Obtaining interpretable fuzzy classification rules from medical data
  publication-title: Artif. Intell. Med.
  doi: 10.1016/S0933-3657(98)00070-0
– volume: 16
  start-page: 19
  year: 1998
  ident: 10.1016/j.autcon.2024.105653_bb0115
  article-title: Earned value Project Management
  publication-title: Engineering
– volume: 11
  start-page: 190
  issue: 2
  year: 2019
  ident: 10.1016/j.autcon.2024.105653_bb0040
  article-title: Estimation at completion simulation using the potential of soft computing models: case study of construction engineering projects
  publication-title: Symmetry
  doi: 10.3390/sym11020190
– volume: 11
  start-page: 17
  issue: 1
  year: 1994
  ident: 10.1016/j.autcon.2024.105653_bb0035
  article-title: Using performance indices to evaluate the estimate at completion
  publication-title: Journal of Cost Analysis and Management
  doi: 10.1080/08823871.1994.10462282
– volume: 158
  start-page: 1429
  year: 2018
  ident: 10.1016/j.autcon.2024.105653_bb0255
  article-title: Prediction of wind pressure coefficients on building surfaces using artificial neural networks
  publication-title: Energ. Buildings
  doi: 10.1016/j.enbuild.2017.11.045
– volume: 2013
  year: 2013
  ident: 10.1016/j.autcon.2024.105653_bb0305
  article-title: Artificial neural networks in mammography interpretation and diagnostic decision making
  publication-title: Comput. Math. Methods Med.
  doi: 10.1155/2013/832509
– volume: 15
  start-page: 1843
  issue: 1
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0265
  article-title: Enhancement of nitrogen prediction accuracy through a new hybrid model using ant colony optimization and an Elman neural network
  publication-title: Engineering Applications of Computational Fluid Mechanics
  doi: 10.1080/19942060.2021.1990134
– volume: 13
  issue: 2
  year: 2022
  ident: 10.1016/j.autcon.2024.105653_bb0225
  article-title: Archimedes optimization algorithm based maximum power point tracker for wind energy generation system
  publication-title: Ain Shams Eng. J.
  doi: 10.1016/j.asej.2021.06.032
– volume: 19
  start-page: 186
  issue: 3
  year: 2019
  ident: 10.1016/j.autcon.2024.105653_bb0120
  article-title: Revisiting reliability of estimates at completion for department of defense contracts
  publication-title: Journal of Public Procurement
  doi: 10.1108/JOPP-02-2018-0006
– volume: 143
  start-page: 04016104
  issue: 3
  year: 2017
  ident: 10.1016/j.autcon.2024.105653_bb0080
  article-title: Estimated cost at completion: integrating risk into earned value management
  publication-title: J. Constr. Eng. Manag.
  doi: 10.1061/(ASCE)CO.1943-7862.0001245
– ident: 10.1016/j.autcon.2024.105653_bb0295
– volume: 25
  start-page: 589
  issue: 6
  year: 2007
  ident: 10.1016/j.autcon.2024.105653_bb0010
  article-title: Application of a fuzzy based decision making methodology to construction project risk assessment
  publication-title: Int. J. Proj. Manag.
  doi: 10.1016/j.ijproman.2007.02.006
– volume: 37
  start-page: 4224
  issue: 6
  year: 2010
  ident: 10.1016/j.autcon.2024.105653_bb0025
  article-title: Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry
  publication-title: Expert Syst. Appl.
  doi: 10.1016/j.eswa.2009.11.080
– volume: 19
  start-page: 619
  issue: 5
  year: 2010
  ident: 10.1016/j.autcon.2024.105653_bb0020
  article-title: Estimate at completion for construction projects using evolutionary support vector machine inference model
  publication-title: Autom. Constr.
  doi: 10.1016/j.autcon.2010.02.008
– start-page: 240
  year: 2008
  ident: 10.1016/j.autcon.2024.105653_bb0155
  article-title: Application of artificial neural network to forecast actual cost of a project to improve earned value management system
  publication-title: World congress on science, engineering and technology
– volume: 37
  start-page: 405
  year: 2022
  ident: 10.1016/j.autcon.2024.105653_bb0110
  article-title: Evaluation of EVM/ES forecasting methods in hospital construction projects
  publication-title: Revista ingeniería de construcción
– start-page: 1
  year: 2017
  ident: 10.1016/j.autcon.2024.105653_bb0310
  article-title: A state-of-the-art review of artificial intelligence techniques for short-term electric load forecasting, 6th international youth conference on energy (IYCE), IEEE, Budapest
  publication-title: Hungary
– volume: 38
  start-page: 788
  year: 2016
  ident: 10.1016/j.autcon.2024.105653_bb0180
  article-title: Artificial neural networks in business: two decades of research
  publication-title: Appl. Soft Comput.
  doi: 10.1016/j.asoc.2015.09.040
– volume: 7
  start-page: 8973
  year: 2021
  ident: 10.1016/j.autcon.2024.105653_bb0230
  article-title: Solar radiation estimation in different climates with meteorological variables using Bayesian model averaging and new soft computing models
  publication-title: Energy Rep.
  doi: 10.1016/j.egyr.2021.10.117
– volume: 226
  issue: 1
  year: 2017
  ident: 10.1016/j.autcon.2024.105653_bb0300
  article-title: An investigation of membership functions on performance of ANFIS for solving classification problems
  publication-title: IOP Conference Series: Materials Science and Engineering
– volume: 47
  start-page: 237
  issue: 1
  year: 2010
  ident: 10.1016/j.autcon.2024.105653_bb0055
  article-title: A review of machining monitoring systems based on artificial intelligence process models
  publication-title: Int. J. Adv. Manuf. Technol.
  doi: 10.1007/s00170-009-2191-8
SSID ssj0007069
Score 2.4614744
Snippet Construction companies estimate project costs at the beginning of the project; however, many factors impact the final project cost. Estimate at Completion...
SourceID crossref
elsevier
SourceType Enrichment Source
Index Database
Publisher
StartPage 105653
SubjectTerms Adaptive neuro-fuzzy inference systems
Archimedes optimization algorithm (AOA)
Civil engineering
Cost estimation
Machine learning
Neural network
Title Estimate-at-completion (EAC) prediction using Archimedes optimization with adaptive fuzzy and neural networks
URI https://dx.doi.org/10.1016/j.autcon.2024.105653
Volume 166
WOSCitedRecordID wos001290901400001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: ScienceDirect
  issn: 0926-5805
  databaseCode: AIEXJ
  dateStart: 19950101
  customDbUrl:
  isFulltext: true
  dateEnd: 99991231
  titleUrlDefault: https://www.sciencedirect.com
  omitProxy: false
  ssIdentifier: ssj0007069
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1bi9QwFA7jrqA-iK6K6408-KAMgd7TPJZhvKHLgqvMW0naxHXZ6Q4z02XdX-85SdqpzuINfCklNGnJ-ZKenJzvCyHPdaDQrRUskrBcTXQKY04FKTNSZnlsdJVYUZ_P7_nBQT6bicPRyHRcmPNT3jT5xYVY_FdTQxkYG6mzf2HuvlEogHswOlzB7HD9I8NPYdCCG6qZXDObMK69ifNpMcEgwGKJmzO2sLWRAqs-C39F1J-FGWTuqZme91bLhdMGby8vnVgTamCCZRuXQb4a-rdFuz5zZMixTXDf6NMO9pnGH46lm9uL47knV1lGRS2_uXjsRDc9g-h1u_zSOqED8InHh0igH8YqoqTPevMBtC0SjYtERhlL8yD9YVJ2Z7FsTfAu1nCC6T0YL8CX4FHFmVMc_kk6-yM2jS1joix6ZtfIbsRTAbPfbvF2OnvX_7N5kDlVRv8pHcnSZgJuv-tqJ2bgmBzdIbf9ioIWDgl3yUg3e-RGRzhf7ZFbA83Je2R-NT7oC0DHS7rBBrXYoBts0CE2KGKDdtigFhsUsEEdNmiHjfvk06vp0eQN82dusAoWj2tWZzoHjzANuVR1rsIqUVFkApUZcGIEFzowXMlIShULXYsqNFWg8ACsPA1UalT8gOw0Z41-SGhm6lTHOsON9SSOExGaMKyVUlxnsKww-yTuOrGsvCA9notyWnaZhyel6_oSu750Xb9PWF9r4QRZfvM87-xTeqfSOYslQOqXNR_9c83H5OYG_U_IDow0_ZRcr87XX1fLZx573wE5jaI2
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Estimate-at-completion+%28EAC%29+prediction+using+Archimedes+optimization+with+adaptive+fuzzy+and+neural+networks&rft.jtitle=Automation+in+construction&rft.au=Abo+Mhady%2C+Ahmed&rft.au=Budayan%2C+Cenk&rft.au=Gurgun%2C+Asli+Pelin&rft.date=2024-10-01&rft.pub=Elsevier+B.V&rft.issn=0926-5805&rft.volume=166&rft_id=info:doi/10.1016%2Fj.autcon.2024.105653&rft.externalDocID=S0926580524003893
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0926-5805&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0926-5805&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0926-5805&client=summon