Fan, X., Sang, H., Tian, M., Yu, Y., & Chen, S. (2025). Integrated scheduling problem of multi-load AGVs and parallel machines considering the recovery process. Swarm and evolutionary computation, 94, 101861. https://doi.org/10.1016/j.swevo.2025.101861
Citace podle Chicago (17th ed.)Fan, Xin, Hongyan Sang, Mengxi Tian, Yang Yu, a Song Chen. "Integrated Scheduling Problem of Multi-load AGVs and Parallel Machines Considering the Recovery Process." Swarm and Evolutionary Computation 94 (2025): 101861. https://doi.org/10.1016/j.swevo.2025.101861.
Citace podle MLA (9th ed.)Fan, Xin, et al. "Integrated Scheduling Problem of Multi-load AGVs and Parallel Machines Considering the Recovery Process." Swarm and Evolutionary Computation, vol. 94, 2025, p. 101861, https://doi.org/10.1016/j.swevo.2025.101861.