Scheduling with day shifts and breaks

Traditional scheduling assumes that production can continue around the clock unless machines are not available. This is not without question for labor‐intensive industries where operations are performed manually. Motivated by operation management problems arising in the assembly stage of aeroengines...

Full description

Saved in:
Bibliographic Details
Published in:International transactions in operational research Vol. 28; no. 2; pp. 598 - 614
Main Authors: Xu, Dehua, Xu, Limin, Yu, Xianyu
Format: Journal Article
Language:English
Published: Oxford Blackwell Publishing Ltd 01.03.2021
Subjects:
ISSN:0969-6016, 1475-3995
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Traditional scheduling assumes that production can continue around the clock unless machines are not available. This is not without question for labor‐intensive industries where operations are performed manually. Motivated by operation management problems arising in the assembly stage of aeroengines and in the paint‐spraying stage of wooden furniture, we consider a scheduling problem with day shifts and breaks. We transform the problem into a new bin‐packing problem and present some theoretical analyses. To meet the needs of practical applications, we propose a binary integer programming (BIP) formulation and a hybrid genetic algorithm (HGA) that is based on five heuristic algorithms and two postoptimization procedures. Computational results indicate that the BIP formulation is suitable for some data sets while the HGA is the most promising in that it saves about 37% of day shifts compared to the best of the five heuristic algorithms in the context of scheduling.
Bibliography:ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0969-6016
1475-3995
DOI:10.1111/itor.12855