Citace podle APA (7th ed.)

Zheng, X., & Wang, L. (2016). A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints. Expert systems with applications, 65, 28-39. https://doi.org/10.1016/j.eswa.2016.08.039

Citace podle Chicago (17th ed.)

Zheng, Xiao-long, a Ling Wang. "A Two-stage Adaptive Fruit Fly Optimization Algorithm for Unrelated Parallel Machine Scheduling Problem with Additional Resource Constraints." Expert Systems with Applications 65 (2016): 28-39. https://doi.org/10.1016/j.eswa.2016.08.039.

Citace podle MLA (9th ed.)

Zheng, Xiao-long, a Ling Wang. "A Two-stage Adaptive Fruit Fly Optimization Algorithm for Unrelated Parallel Machine Scheduling Problem with Additional Resource Constraints." Expert Systems with Applications, vol. 65, 2016, pp. 28-39, https://doi.org/10.1016/j.eswa.2016.08.039.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..