Zheng, X., & Wang, L. (2016). A two-stage adaptive fruit fly optimization algorithm for unrelated parallel machine scheduling problem with additional resource constraints. Expert systems with applications, 65, 28-39. https://doi.org/10.1016/j.eswa.2016.08.039
Chicago Style (17th ed.) CitationZheng, Xiao-long, and Ling Wang. "A Two-stage Adaptive Fruit Fly Optimization Algorithm for Unrelated Parallel Machine Scheduling Problem with Additional Resource Constraints." Expert Systems with Applications 65 (2016): 28-39. https://doi.org/10.1016/j.eswa.2016.08.039.
MLA (9th ed.) CitationZheng, Xiao-long, and Ling Wang. "A Two-stage Adaptive Fruit Fly Optimization Algorithm for Unrelated Parallel Machine Scheduling Problem with Additional Resource Constraints." Expert Systems with Applications, vol. 65, 2016, pp. 28-39, https://doi.org/10.1016/j.eswa.2016.08.039.