Solving multi-objective hybrid flowshop lot-streaming scheduling with consistent and limited sub-lots via a knowledge-based memetic algorithm

All workpieces of a job are usually treated as a whole in general hybrid flowshop scheduling problem, resulting in lower production efficiency and on-time delivery rate. If a job lot can be split into smaller sub-lots and machines in each stage can process them in parallel, these performance indicat...

Full description

Saved in:
Bibliographic Details
Published in:Journal of manufacturing systems Vol. 73; pp. 106 - 125
Main Authors: Zhu, Yingying, Tang, Qiuhua, Cheng, Lixin, Zhao, Lianpeng, Jiang, Gan, Lu, Yiling
Format: Journal Article
Language:English
Published: Elsevier Ltd 01.04.2024
Subjects:
ISSN:0278-6125
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first