Green and efficient-oriented human-robot hybrid partial destructive disassembly line balancing problem from non-disassemblability of components and noise pollution
•For the first time, destructive operation is introduced into the human-robot disassembly line balancing problem, with noise during disassembly is considered. A MIP model is also developed for this problem and the correctness of the model is verified using an exact solver and a meta-heuristic algori...
Gespeichert in:
| Veröffentlicht in: | Robotics and computer-integrated manufacturing Jg. 90; S. 102816 |
|---|---|
| Hauptverfasser: | , , , , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
Elsevier Ltd
01.12.2024
|
| Schlagworte: | |
| ISSN: | 0736-5845 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!