A green scheduling algorithm for the distributed flowshop problem

In recent years, sustainable development and green manufacturing have attracted widespread attention to environmental problems becoming increasingly serious. Meanwhile, affected by the intensification of market competition and economic globalization, distributed manufacturing systems have become inc...

Full description

Saved in:
Bibliographic Details
Published in:Applied soft computing Vol. 109; p. 107526
Main Authors: Li, Yuan-Zhen, Pan, Quan-Ke, Gao, Kai-Zhou, Tasgetiren, M. Fatih, Zhang, Biao, Li, Jun-Qing
Format: Journal Article
Language:English
Published: Elsevier B.V 01.09.2021
Subjects:
ISSN:1568-4946, 1872-9681
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In recent years, sustainable development and green manufacturing have attracted widespread attention to environmental problems becoming increasingly serious. Meanwhile, affected by the intensification of market competition and economic globalization, distributed manufacturing systems have become increasingly common. This paper addresses the energy-efficient scheduling of the distributed permutation flowshop (EEDPFSP) with the criteria of minimizing both total flow time and total energy consumption. Considering the distributed and multi-objective optimization complexity, an improved NSGAII algorithm (INSGAII) is proposed. First, we analyze the problem-specific characteristics and designed new operators based on the knowledge of the problem. Second, four constructive heuristic algorithms are proposed to produce high-quality initial solutions. Third, inspired by the artificial bee colony algorithm, we propose a new colony generation method using the operators designed. Fourth, a local intensification is designed for exploiting better non-dominated solutions. The influence of parameter settings is investigated by experiments to determine the optimal parameter configuration of the INSGAII. Finally, a large number of computational tests and comparisons have been carried out to verify the effectiveness of the proposed INSGAII in solving EEDPFSP.
ISSN:1568-4946
1872-9681
DOI:10.1016/j.asoc.2021.107526