No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan

The no-wait flowshop scheduling problem on m machines with separate setup times is addressed to minimize total tardiness with an upper bound on makespan. Conditions for a dominance rule are established. Then, a new simulated annealing algorithm utilizing block insertion and block exchange operators...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Applied mathematics and computation Ročník 365; s. 124688
Hlavní autori: Allahverdi, Ali, Aydilek, Harun, Aydilek, Asiye
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Elsevier Inc 15.01.2020
Predmet:
ISSN:0096-3003, 1873-5649
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Buďte prvý, kto okomentuje tento záznam!
Najprv sa musíte prihlásiť.