Citace podle APA (7th ed.)

Yin, Y., Ye, D., & Zhang, G. (2014). Single machine batch scheduling to minimize the sum of total flow time and batch delivery cost with an unavailability interval. Information sciences, 274, 310-322. https://doi.org/10.1016/j.ins.2014.02.142

Citace podle Chicago (17th ed.)

Yin, Yunqiang, Deshi Ye, a Guochuan Zhang. "Single Machine Batch Scheduling to Minimize the Sum of Total Flow Time and Batch Delivery Cost with an Unavailability Interval." Information Sciences 274 (2014): 310-322. https://doi.org/10.1016/j.ins.2014.02.142.

Citace podle MLA (9th ed.)

Yin, Yunqiang, et al. "Single Machine Batch Scheduling to Minimize the Sum of Total Flow Time and Batch Delivery Cost with an Unavailability Interval." Information Sciences, vol. 274, 2014, pp. 310-322, https://doi.org/10.1016/j.ins.2014.02.142.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..