Shi, J., Chen, M., Ma, Y., & Qiao, F. (2023). A new boredom-aware dual-resource constrained flexible job shop scheduling problem using a two-stage multi-objective particle swarm optimization algorithm. Information sciences, 643, 119141. https://doi.org/10.1016/j.ins.2023.119141
Chicago Style (17th ed.) CitationShi, Jiaxuan, Mingzhou Chen, Yumin Ma, and Fei Qiao. "A New Boredom-aware Dual-resource Constrained Flexible Job Shop Scheduling Problem Using a Two-stage Multi-objective Particle Swarm Optimization Algorithm." Information Sciences 643 (2023): 119141. https://doi.org/10.1016/j.ins.2023.119141.
MLA (9th ed.) CitationShi, Jiaxuan, et al. "A New Boredom-aware Dual-resource Constrained Flexible Job Shop Scheduling Problem Using a Two-stage Multi-objective Particle Swarm Optimization Algorithm." Information Sciences, vol. 643, 2023, p. 119141, https://doi.org/10.1016/j.ins.2023.119141.