Single-machine scheduling with operator non-availability to minimize total weighted completion time
In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-p...
Uložené v:
| Vydané v: | Information sciences Ročník 445-446; s. 1 - 5 |
|---|---|
| Hlavní autori: | , |
| Médium: | Journal Article |
| Jazyk: | English |
| Vydavateľské údaje: |
Elsevier Inc
01.06.2018
|
| Predmet: | |
| ISSN: | 0020-0255, 1872-6291 |
| On-line prístup: | Získať plný text |
| Tagy: |
Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
|
| Shrnutí: | In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme. Our results address two open problems proposed in Chen et al. [2]. |
|---|---|
| ISSN: | 0020-0255 1872-6291 |
| DOI: | 10.1016/j.ins.2018.03.005 |