Single-machine scheduling with operator non-availability to minimize total weighted completion time

In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Information sciences Jg. 445-446; S. 1 - 5
Hauptverfasser: Wan, Long, Yuan, Jinjiang
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Elsevier Inc 01.06.2018
Schlagworte:
ISSN:0020-0255, 1872-6291
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme. Our results address two open problems proposed in Chen et al. [2].
ISSN:0020-0255
1872-6291
DOI:10.1016/j.ins.2018.03.005