Single-machine scheduling with operator non-availability to minimize total weighted completion time

In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-p...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Information sciences Ročník 445-446; s. 1 - 5
Hlavní autoři: Wan, Long, Yuan, Jinjiang
Médium: Journal Article
Jazyk:angličtina
Vydáno: Elsevier Inc 01.06.2018
Témata:
ISSN:0020-0255, 1872-6291
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme. Our results address two open problems proposed in Chen et al. [2].
ISSN:0020-0255
1872-6291
DOI:10.1016/j.ins.2018.03.005