Single-machine scheduling with operator non-availability to minimize total weighted completion time

In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-p...

Full description

Saved in:
Bibliographic Details
Published in:Information sciences Vol. 445-446; pp. 1 - 5
Main Authors: Wan, Long, Yuan, Jinjiang
Format: Journal Article
Language:English
Published: Elsevier Inc 01.06.2018
Subjects:
ISSN:0020-0255, 1872-6291
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:In this paper, we investigate the single-machine scheduling with an operator non-availability period to minimize total weighted completion time, where the operator non-availability period is an open time interval in which no job can be started or be completed. For this problem, we present a pseudo-polynomial-time algorithm and a fully polynomial-time approximation scheme. Our results address two open problems proposed in Chen et al. [2].
ISSN:0020-0255
1872-6291
DOI:10.1016/j.ins.2018.03.005