Citace podle APA (7th ed.)

Wan, L., & Yuan, J. (2018). Single-machine scheduling with operator non-availability to minimize total weighted completion time. Information sciences, 445-446, 1-5. https://doi.org/10.1016/j.ins.2018.03.005

Citace podle Chicago (17th ed.)

Wan, Long, a Jinjiang Yuan. "Single-machine Scheduling with Operator Non-availability to Minimize Total Weighted Completion Time." Information Sciences 445-446 (2018): 1-5. https://doi.org/10.1016/j.ins.2018.03.005.

Citace podle MLA (9th ed.)

Wan, Long, a Jinjiang Yuan. "Single-machine Scheduling with Operator Non-availability to Minimize Total Weighted Completion Time." Information Sciences, vol. 445-446, 2018, pp. 1-5, https://doi.org/10.1016/j.ins.2018.03.005.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..