Liu, M., Lv, J., Du, S., Deng, Y., Shen, X., & Zhou, Y. (2024). Multi-resource constrained flexible job shop scheduling problem with fixture-pallet combinatorial optimisation. Computers & industrial engineering, 188, 109903. https://doi.org/10.1016/j.cie.2024.109903
Citace podle Chicago (17th ed.)Liu, Molin, Jun Lv, Shichang Du, Yafei Deng, Xiaoxiao Shen, a Yulu Zhou. "Multi-resource Constrained Flexible Job Shop Scheduling Problem with Fixture-pallet Combinatorial Optimisation." Computers & Industrial Engineering 188 (2024): 109903. https://doi.org/10.1016/j.cie.2024.109903.
Citace podle MLA (9th ed.)Liu, Molin, et al. "Multi-resource Constrained Flexible Job Shop Scheduling Problem with Fixture-pallet Combinatorial Optimisation." Computers & Industrial Engineering, vol. 188, 2024, p. 109903, https://doi.org/10.1016/j.cie.2024.109903.