A new solution approach for the twin yard crane scheduling problem in automated container terminals

The Twin-Automated Stacking Crane (Twin-ASC) system is a special configuration of Yard Crane (YC) that is common in most of the Automated Container Terminals (ACTs) used for stacking and retrieving containers on the yard side of a Container Terminal (CT). The usual objective when scheduling the Twin...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:Advanced engineering informatics Ročník 57; s. 102015
Hlavní autoři: Oladugba, Andrew Omoniyi, Gheith, Mohamed, Eltawil, Amr
Médium: Journal Article
Jazyk:angličtina
Vydáno: Elsevier Ltd 01.08.2023
Témata:
ISSN:1474-0346, 1873-5320
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Abstract The Twin-Automated Stacking Crane (Twin-ASC) system is a special configuration of Yard Crane (YC) that is common in most of the Automated Container Terminals (ACTs) used for stacking and retrieving containers on the yard side of a Container Terminal (CT). The usual objective when scheduling the Twin-ASC to perform a given set of transport jobs is the minimization of the schedule length (makespan). The problem is NP-hard, which means that problem of realistic size cannot be solved within a reasonable time limit by default solvers or conventional methods, necessitating the use of an efficient algorithm. Thus, this work proposes a novel algorithm based on the modified Johnson Algorithm (JA) to a formulated Mixed Integer Programming (MIP) model for solving the Twin-ASC scheduling problem to minimize the makespan of the schedule. Differ from the existing heuristics, the proposed algorithm has the flexibility of varying the handshake area, and the system utilization can be investigated. The handshake area is a temporary storage location in the Twin-ASC system where an ASC can leave a job for the other to complete since the crossing of the cranes is not possible, and it greatly affects the makespan of completing the given set of jobs. An extensive computational study was carried out and results were compared with (two) existing heuristics to evaluate the effectiveness of the proposed solution approach.
AbstractList The Twin-Automated Stacking Crane (Twin-ASC) system is a special configuration of Yard Crane (YC) that is common in most of the Automated Container Terminals (ACTs) used for stacking and retrieving containers on the yard side of a Container Terminal (CT). The usual objective when scheduling the Twin-ASC to perform a given set of transport jobs is the minimization of the schedule length (makespan). The problem is NP-hard, which means that problem of realistic size cannot be solved within a reasonable time limit by default solvers or conventional methods, necessitating the use of an efficient algorithm. Thus, this work proposes a novel algorithm based on the modified Johnson Algorithm (JA) to a formulated Mixed Integer Programming (MIP) model for solving the Twin-ASC scheduling problem to minimize the makespan of the schedule. Differ from the existing heuristics, the proposed algorithm has the flexibility of varying the handshake area, and the system utilization can be investigated. The handshake area is a temporary storage location in the Twin-ASC system where an ASC can leave a job for the other to complete since the crossing of the cranes is not possible, and it greatly affects the makespan of completing the given set of jobs. An extensive computational study was carried out and results were compared with (two) existing heuristics to evaluate the effectiveness of the proposed solution approach.
ArticleNumber 102015
Author Gheith, Mohamed
Oladugba, Andrew Omoniyi
Eltawil, Amr
Author_xml – sequence: 1
  givenname: Andrew Omoniyi
  orcidid: 0000-0002-9119-7018
  surname: Oladugba
  fullname: Oladugba, Andrew Omoniyi
  email: oladugba.andrew@ejust.edu.eg
  organization: Department of Industrial and Manufacturing Engineering, Egypt-Japan University of Science and Technology, Alexandria, Egypt
– sequence: 2
  givenname: Mohamed
  surname: Gheith
  fullname: Gheith, Mohamed
  organization: Department of Industrial and Manufacturing Engineering, Egypt-Japan University of Science and Technology, Alexandria, Egypt
– sequence: 3
  givenname: Amr
  surname: Eltawil
  fullname: Eltawil, Amr
  organization: Department of Industrial and Manufacturing Engineering, Egypt-Japan University of Science and Technology, Alexandria, Egypt
BookMark eNp9kMtqwzAQRUVJoUnaD-hOP-BUliXLpqsQ-oJAN-1ajKVxo-BIQVYa8vdVSFdddHVn4J6BOTMy8cEjIfclW5SsrB-2C0C34IxXeeeslFdkWjaqKmTF2STPQomCVaK-IbNx3LLMNK2aErOkHo90DMMhueAp7PcxgNnQPkSaNkjT0Xl6gmipieCRjmaD9jA4_0VzsxtwR3MBDinsIGFuBZ_Aecw0xp3zMIy35LrPgXe_OSefz08fq9di_f7ytlquC8NblQqJtays4Ii2A2QgOwFS9kxx0dRCdo2ybS2wVXVft9hUqmsF2AZ6K9Eyy6s5KS93TQzjGLHX--h2EE-6ZPpsSW91tqTPlvTFUmbUH8a4BGcVKYIb_iUfLyTml74dRj0ah96gdRFN0ja4f-gfbYSFhg
CitedBy_id crossref_primary_10_1016_j_kscej_2025_100175
crossref_primary_10_1109_TASE_2024_3490039
crossref_primary_10_3390_jmse12050710
crossref_primary_10_1016_j_aei_2025_103193
crossref_primary_10_3390_electronics12153288
crossref_primary_10_1016_j_cie_2024_110104
crossref_primary_10_1016_j_eswa_2024_125117
crossref_primary_10_1016_j_aei_2025_103133
crossref_primary_10_1109_TASE_2025_3559241
crossref_primary_10_1016_j_tre_2025_104312
crossref_primary_10_3390_biomimetics9110683
crossref_primary_10_3390_jmse12081415
crossref_primary_10_3390_jmse13030593
crossref_primary_10_3390_logistics8030080
crossref_primary_10_3390_jmse12101713
crossref_primary_10_1016_j_tre_2024_103714
crossref_primary_10_1109_TASE_2024_3454226
crossref_primary_10_1016_j_aei_2024_102660
crossref_primary_10_1016_j_cie_2025_111475
crossref_primary_10_1016_j_cie_2025_111344
crossref_primary_10_1108_MABR_01_2025_0008
crossref_primary_10_1080_0305215X_2025_2507861
Cites_doi 10.1016/j.ejor.2003.11.025
10.1016/j.aei.2011.05.001
10.1016/j.ejor.2018.05.007
10.1016/j.tre.2020.101966
10.1287/trsc.2015.0641
10.1016/j.aei.2021.101292
10.1016/j.cie.2019.01.050
10.1007/s10951-019-00634-6
10.1109/IEEM44572.2019.8978608
10.1287/trsc.1060.0148
10.1287/trsc.2014.0533
10.1016/j.ijpe.2008.05.014
10.1007/s00291-010-0206-3
10.5220/0008974700890099
10.1109/TITS.2017.2780256
10.1016/j.dam.2016.04.006
10.1007/978-3-319-94767-9_6
10.1016/j.cie.2020.106848
10.1016/j.tre.2019.03.008
10.1504/IJSTL.2010.029899
10.1007/s00291-010-0209-0
10.1007/s10951-021-00710-w
10.1016/j.ejor.2017.01.037
10.1016/j.ijpe.2011.12.020
10.1007/s00291-011-0242-7
10.1007/s10951-019-00611-z
10.1016/j.trc.2016.06.004
10.1016/j.cie.2018.12.039
10.1287/trsc.1090.0298
10.1016/j.dam.2015.07.042
10.1287/opre.1080.0621
10.1007/s10732-018-9380-2
10.1016/j.dam.2011.09.015
10.1016/j.ejor.2008.08.019
10.1016/j.aei.2018.11.004
10.1002/nav.3800010110
10.1016/j.cie.2015.04.026
10.1016/j.ejor.2018.07.043
10.1016/j.aei.2011.02.002
10.1016/j.dam.2017.06.015
10.1287/trsc.2016.0687
10.1016/j.ijpe.2008.09.018
10.1016/j.aei.2014.09.003
10.1016/j.cie.2016.01.010
10.1016/S1007-0214(10)70089-4
ContentType Journal Article
Copyright 2023 Elsevier Ltd
Copyright_xml – notice: 2023 Elsevier Ltd
DBID AAYXX
CITATION
DOI 10.1016/j.aei.2023.102015
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Applied Sciences
EISSN 1873-5320
ExternalDocumentID 10_1016_j_aei_2023_102015
S147403462300143X
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1~.
1~5
23M
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
AAAKF
AAAKG
AACTN
AAEDT
AAEDW
AAIAV
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AARIN
AAXUO
AAYFN
ABBOA
ABFNM
ABMAC
ABUCO
ABXDB
ABYKQ
ACDAQ
ACGFS
ACNNM
ACRLP
ACZNC
ADBBV
ADEZE
ADJOM
ADMUD
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHJVU
AHZHX
AIALX
AIEXJ
AIKHN
AITUG
AJBFU
AJOXV
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
AOUOD
APLSM
AXJTR
BJAXD
BKOJK
BLXMC
CS3
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FIRID
FNPLU
FYGXN
G-Q
GBLVA
GBOLZ
HAMUX
HVGLF
HZ~
IHE
J1W
JJJVA
KOM
M41
MO0
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
PC.
Q38
RIG
RNS
ROL
RPZ
SDF
SDG
SDP
SES
SEW
SPC
SPCBC
SSB
SSD
SST
SSV
SSZ
T5K
UHS
XPP
ZMT
~G-
9DU
AATTM
AAXKI
AAYWO
AAYXX
ABJNI
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
ID FETCH-LOGICAL-c297t-5e653d42eedbae0a5b4a55f07248645b87d964e976f69e837b94ad8afd5ed0d23
ISICitedReferencesCount 23
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=001019385800001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 1474-0346
IngestDate Tue Nov 18 21:05:48 EST 2025
Sat Nov 29 07:02:42 EST 2025
Fri Feb 23 02:35:39 EST 2024
IsPeerReviewed true
IsScholarly true
Keywords Stacking crane
Makespan
Handshake area
Solution algorithm
Automated container terminals
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c297t-5e653d42eedbae0a5b4a55f07248645b87d964e976f69e837b94ad8afd5ed0d23
ORCID 0000-0002-9119-7018
ParticipantIDs crossref_primary_10_1016_j_aei_2023_102015
crossref_citationtrail_10_1016_j_aei_2023_102015
elsevier_sciencedirect_doi_10_1016_j_aei_2023_102015
PublicationCentury 2000
PublicationDate August 2023
2023-08-00
PublicationDateYYYYMMDD 2023-08-01
PublicationDate_xml – month: 08
  year: 2023
  text: August 2023
PublicationDecade 2020
PublicationTitle Advanced engineering informatics
PublicationYear 2023
Publisher Elsevier Ltd
Publisher_xml – name: Elsevier Ltd
References Dorndorf, Schneider (b0095) 2010; 32
Luo, Wu (b0150) 2020; 149
Allaoui, Artiba (b0170) 2009; 121
Yu, Tang, Guo, Song, Yu (b0015) 2018; 2018
Lu, Wang (b0030) 2019; 129
He, Tana, Zhang (b0165) 2019; 39
Briskorn, Zey (b0100) 2020; 23
Gabrel, Lacroix, Murat, Remli (b0295) 2014; 164
Hsu, Tai, Wang, Chou (b0010) 2021; 48
Johnson (b0175) 1954; 1
Galle, Barnhart, Jaillet (b0195) 2018; 271
Wu, Li, Petering, Goh, Souza (b0265) 2015; 49
A. O. Oladugba, M. Gheith and A. Eltawil, “Solving the Twin Yard Crane Scheduling Problem in Automated Container Terminals,” in
Malta, 2020.
Speer, Fischer (b0210) 2016; 51
Vis, Roodbergen (b0220) 2009; 57
He, Huang, Yan (b0225) 2015; 29
Naeem, Eltawil, Iijima, Gheith (b0160) 2022; 82
Gharehgozli, Vernooij, Zaerpour (b0090) 2017; 261
Wang, Wu (b0290) 2021; 1
Oladugba, Gheith, Eltawil (b0235) 2020
Orlando, 2005.
Li, Wu, Petering, Goh, Souza (b0255) 2009; 198
M. ElWakil, M. Gheith and A. Eltawil, “A New Hybrid Salp Swarm-simulated Annealing Algorithm for the Container Stacking Problem,” in
Kemme (b0050) 2013
Verma (b0190) 2011
Portugal, 2017.
Park, Choe, Ok, Ryu (b0120) 2010; 32
Gharehgozli, Yu, de Koster, Du (b0140) 2019; 125
Luo, Wu, Mendes (b0145) 2016; 94
Zhou, Lee, Li (b0155) 2020; 138
Ehleiter, Jaehn (b0035) 2018; 24
Carlo, Martínez-Acevedo (b0105) 2015; 89
Abdelmoniem, Gheith, Harraz (b0045) 2020
Kemme (b0025) 2012; 34
Portugal, 2018.
Han, Wang, Huang (b0065) 2019; 128
Vis, Carlo (b0240) 2010; 44
Ng (b0260) 2005; 164
Zheng, Man, Chu, Liu, Chu (b0275) 2017; 19
Macau, 2019.
Bunday, Mulholland (b0285) 2004
Cao, Lee, Meng (b0250) 2008; 115
Gharehgozli, Laporte, Yu, de Koster (b0130) 2015; 49
A. Azab, A. Karam and A. Eltawil, “Impact of collaborative external truck scheduling on yard efficiency in container terminals,” in
M. M. Frobin, M. S. Gheith and A. B. Eltawil, “Optimum Twin Yard Crane Scheduling With Non-Interference Constraints in Automated Container Terminals,” in
Kress, Dornseifer, Jaehn (b0115) 2019; 273
Arango, Cortés, Muñuzuri, Onieva (b0215) 2011; 25
Hu, Sheu, Luo (b0245) 2016; 26
Eilken (b0280) 2019; 22
Guo, Huang, Hsu, Low (b0200) 2011; 25
Briskorn, Angeloudis (b0110) 2015; 201
Briskorn, Emde, Boysen (b0085) 2016; 211
Jinxin, Qixin, Lee (b0185) 2010; 15
Y. A. Saanen and M. V. Valkengoed, “Comparison of three automated stacking alternatives by means of simulation,” in
Stahlbock, Voß (b0205) 2010; 2
Jaehn, Kress (b0075) 2018; 242
Rintanen, Thomas (b0040) 2016
Li, Goh, Wu, Petering, de Souza, Wu (b0270) 2012; 136
Gheith, El-Tawil, Harraz (b0080) 2013
(b0230) 2005
Premathilaka (b0020) 2018
Zey, Briskorn, Boysen (b0135) 2022; 25
Goodchild, Daganzo (b0180) 2006; 40
Wang (10.1016/j.aei.2023.102015_b0290) 2021; 1
Kemme (10.1016/j.aei.2023.102015_b0050) 2013
Gharehgozli (10.1016/j.aei.2023.102015_b0130) 2015; 49
Oladugba (10.1016/j.aei.2023.102015_b0235) 2020
Kemme (10.1016/j.aei.2023.102015_b0025) 2012; 34
Briskorn (10.1016/j.aei.2023.102015_b0110) 2015; 201
Vis (10.1016/j.aei.2023.102015_b0240) 2010; 44
Ng (10.1016/j.aei.2023.102015_b0260) 2005; 164
Johnson (10.1016/j.aei.2023.102015_b0175) 1954; 1
Hu (10.1016/j.aei.2023.102015_b0245) 2016; 26
Guo (10.1016/j.aei.2023.102015_b0200) 2011; 25
10.1016/j.aei.2023.102015_b0070
Zey (10.1016/j.aei.2023.102015_b0135) 2022; 25
Vis (10.1016/j.aei.2023.102015_b0220) 2009; 57
Li (10.1016/j.aei.2023.102015_b0255) 2009; 198
Han (10.1016/j.aei.2023.102015_b0065) 2019; 128
Jinxin (10.1016/j.aei.2023.102015_b0185) 2010; 15
Gabrel (10.1016/j.aei.2023.102015_b0295) 2014; 164
Briskorn (10.1016/j.aei.2023.102015_b0100) 2020; 23
Briskorn (10.1016/j.aei.2023.102015_b0085) 2016; 211
Arango (10.1016/j.aei.2023.102015_b0215) 2011; 25
Yu (10.1016/j.aei.2023.102015_b0015) 2018; 2018
Naeem (10.1016/j.aei.2023.102015_b0160) 2022; 82
Jaehn (10.1016/j.aei.2023.102015_b0075) 2018; 242
Abdelmoniem (10.1016/j.aei.2023.102015_b0045) 2020
Park (10.1016/j.aei.2023.102015_b0120) 2010; 32
Kress (10.1016/j.aei.2023.102015_b0115) 2019; 273
He (10.1016/j.aei.2023.102015_b0225) 2015; 29
Premathilaka (10.1016/j.aei.2023.102015_b0020) 2018
Gharehgozli (10.1016/j.aei.2023.102015_b0140) 2019; 125
Allaoui (10.1016/j.aei.2023.102015_b0170) 2009; 121
Galle (10.1016/j.aei.2023.102015_b0195) 2018; 271
Zheng (10.1016/j.aei.2023.102015_b0275) 2017; 19
Goodchild (10.1016/j.aei.2023.102015_b0180) 2006; 40
Bunday (10.1016/j.aei.2023.102015_b0285) 2004
10.1016/j.aei.2023.102015_b0125
10.1016/j.aei.2023.102015_b0005
Speer (10.1016/j.aei.2023.102015_b0210) 2016; 51
Luo (10.1016/j.aei.2023.102015_b0150) 2020; 149
Zhou (10.1016/j.aei.2023.102015_b0155) 2020; 138
Li (10.1016/j.aei.2023.102015_b0270) 2012; 136
Verma (10.1016/j.aei.2023.102015_b0190) 2011
Carlo (10.1016/j.aei.2023.102015_b0105) 2015; 89
Luo (10.1016/j.aei.2023.102015_b0145) 2016; 94
Dorndorf (10.1016/j.aei.2023.102015_b0095) 2010; 32
Stahlbock (10.1016/j.aei.2023.102015_b0205) 2010; 2
He (10.1016/j.aei.2023.102015_b0165) 2019; 39
10.1016/j.aei.2023.102015_b0055
Cao (10.1016/j.aei.2023.102015_b0250) 2008; 115
Hsu (10.1016/j.aei.2023.102015_b0010) 2021; 48
Ehleiter (10.1016/j.aei.2023.102015_b0035) 2018; 24
Gheith (10.1016/j.aei.2023.102015_b0080) 2013
Rintanen (10.1016/j.aei.2023.102015_b0040) 2016
Gharehgozli (10.1016/j.aei.2023.102015_b0090) 2017; 261
Lu (10.1016/j.aei.2023.102015_b0030) 2019; 129
Eilken (10.1016/j.aei.2023.102015_b0280) 2019; 22
10.1016/j.aei.2023.102015_b0060
Wu (10.1016/j.aei.2023.102015_b0265) 2015; 49
(10.1016/j.aei.2023.102015_b0230) 2005
References_xml – volume: 44
  start-page: 169
  year: 2010
  end-page: 182
  ident: b0240
  article-title: Sequencing two cooperating automated stacking cranes in a container terminal
  publication-title: Transp. Sci.
– volume: 57
  start-page: 456
  year: 2009
  end-page: 467
  ident: b0220
  article-title: Scheduling of container storage and retrieval
  publication-title: Oper. Res.
– volume: 94
  start-page: 32
  year: 2016
  end-page: 44
  ident: b0145
  article-title: Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal
  publication-title: Comput. Ind. Eng.
– volume: 49
  start-page: 990
  year: 2015
  end-page: 1005
  ident: b0265
  article-title: Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement
  publication-title: Transp. Sci.
– reference: , Orlando, 2005.
– volume: 1
  start-page: 61
  year: 1954
  end-page: 68
  ident: b0175
  article-title: Optimal two- and three-stage production schedules with setup times included
  publication-title: Nav. Res. Logist. Q.
– year: 2005
  ident: b0230
  publication-title: Container Terminals and Automated Transport Systems
– reference: M. ElWakil, M. Gheith and A. Eltawil, “A New Hybrid Salp Swarm-simulated Annealing Algorithm for the Container Stacking Problem,” in
– volume: 29
  start-page: 59
  year: 2015
  end-page: 75
  ident: b0225
  article-title: Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption
  publication-title: Adv. Eng. Inf.
– reference: Y. A. Saanen and M. V. Valkengoed, “Comparison of three automated stacking alternatives by means of simulation,” in
– volume: 25
  start-page: 452
  year: 2011
  end-page: 461
  ident: b0215
  article-title: Berth allocation planning in Seville inland port by simulation and optimisation
  publication-title: Adv. Eng. Inform.
– reference: , Macau, 2019.
– volume: 1
  year: 2021
  ident: b0290
  article-title: “ Is uncertainty always bad for the performance of transportation systems?,”
  publication-title: Transp. Res.
– volume: 128
  start-page: 553
  year: 2019
  end-page: 558
  ident: b0065
  article-title: Scheduling cooperative twin automated stacking cranes in automated container terminals
  publication-title: Comput. Ind. Eng.
– volume: 19
  start-page: 3775
  year: 2017
  end-page: 3784
  ident: b0275
  article-title: Two yard crane scheduling with dynamic processing time and interference
  publication-title: IEEE Trans. Intell. Transp. Syst.
– volume: 149
  start-page: 1
  year: 2020
  end-page: 12
  ident: b0150
  article-title: Scheduling of container-handling equipment during the loading process at an automated container terminal
  publication-title: Comput. Ind. Eng.
– volume: 121
  start-page: 81
  year: 2009
  end-page: 87
  ident: b0170
  article-title: Johnson’s algorithm: A key to solve optimally or approximately flow shop scheduling problems with unavailability periods
  publication-title: Int. J. Production Economics
– volume: 51
  start-page: 305
  year: 2016
  end-page: 324
  ident: b0210
  article-title: Scheduling of different automated yard crane systems at container terminals
  publication-title: Transp. Sci.
– volume: 273
  start-page: 82
  year: 2019
  end-page: 101
  ident: b0115
  article-title: An exact solution approach for scheduling cooperative gantry cranes
  publication-title: Eur. J. Oper. Res.
– year: 2020
  ident: b0045
  article-title: A New Formulation for the Yard Crane Scheduling Problem with Energy Consumption Considerations, in
  publication-title: Cairo
– volume: 164
  start-page: 64
  year: 2005
  end-page: 78
  ident: b0260
  article-title: Crane scheduling in container yards with inter-crane interference
  publication-title: Eur. J. Oper. Res.
– year: 2011
  ident: b0190
  article-title: Operations Research
– volume: 2
  start-page: 95
  year: 2010
  end-page: 123
  ident: b0205
  article-title: Efficiency considerations for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals
  publication-title: Int. J. Shipping and Transport Logistics
– volume: 129
  start-page: 404
  year: 2019
  end-page: 416
  ident: b0030
  article-title: A study on multi-ASC scheduling method of automated container terminals based on graph theory
  publication-title: Comput. Ind. Eng.
– volume: 125
  start-page: 261
  year: 2019
  end-page: 284
  ident: b0140
  article-title: Sequencing storage and retrieval requests in a container block with multiple open locations
  publication-title: Transp. Res. E
– volume: 34
  start-page: 563
  year: 2012
  end-page: 591
  ident: b0025
  article-title: Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals
  publication-title: OR Spectr.
– volume: 115
  start-page: 221
  year: 2008
  end-page: 228
  ident: b0250
  article-title: Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals
  publication-title: Int. J. Production Economics
– reference: M. M. Frobin, M. S. Gheith and A. B. Eltawil, “Optimum Twin Yard Crane Scheduling With Non-Interference Constraints in Automated Container Terminals,” in
– reference: , Portugal, 2017.
– volume: 242
  start-page: 53
  year: 2018
  end-page: 68
  ident: b0075
  article-title: Scheduling cooperative gantry cranes with seaside and landside jobs
  publication-title: Discret. Appl. Math.
– reference: A. O. Oladugba, M. Gheith and A. Eltawil, “Solving the Twin Yard Crane Scheduling Problem in Automated Container Terminals,” in
– volume: 138
  start-page: 101966
  year: 2020
  ident: b0155
  article-title: Integrated optimization on yard crane scheduling and vehicle positioning at container yards
  publication-title: Transp. Res. E
– volume: 82
  start-page: 1
  year: 2022
  end-page: 17
  ident: b0160
  article-title: Integrated scheduling of automated yard cranes and automated guided vehicles with limited buffer capacity of dual-trolley quay cranes in automated container terminals
  publication-title: Logistic
– volume: 261
  start-page: 108
  year: 2017
  end-page: 128
  ident: b0090
  article-title: A simulation study of the performance of twin automated stacking cranes at a seaport container terminal
  publication-title: Eur. J. Oper. Res.
– volume: 39
  start-page: 14
  year: 2019
  end-page: 24
  ident: b0165
  article-title: Yard crane scheduling problem in a container terminal considering risk caused by uncertainty
  publication-title: Adv. Eng. Inform
– volume: 48
  start-page: 1
  year: 2021
  end-page: 14
  ident: b0010
  article-title: Scheduling of collaborative operations of yard cranes and yard trucks for export containers using hybrid approaches
  publication-title: Adv. Eng. Inform.
– reference: , Portugal, 2018.
– volume: 2018
  start-page: 1
  year: 2018
  end-page: 15
  ident: b0015
  article-title: Performance comparison of real-time yard crane dispatching strategies at nontransshipment container terminals
  publication-title: Math. Probl. Eng.
– volume: 26
  start-page: 208
  year: 2016
  end-page: 227
  ident: b0245
  article-title: Sequencing twin automated stacking cranes in a block at automated container terminal
  publication-title: Transp. Res. C
– start-page: 955
  year: 2013
  end-page: 964
  ident: b0080
  article-title: A Proposed heuristic for Solving the Container Pre-marshalling Problem
  publication-title: The 19th International Conference on Industrial Engineering and Engineering Management
– volume: 22
  start-page: 517
  year: 2019
  end-page: 541
  ident: b0280
  article-title: A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals
  publication-title: J. Sched.
– volume: 201
  start-page: 70
  year: 2015
  end-page: 85
  ident: b0110
  article-title: Scheduling co-operating stacking cranes with predetermined container sequences
  publication-title: Discret. Appl. Math.
– year: 2018
  ident: b0020
  article-title: Determining the factors affecting the turnaround time of container vessels: a case study on Port of Colombo
– year: 2013
  ident: b0050
  article-title: Design and Operation of Automated Container Storage Systems, Springer-Verlag, Berlin Heidelberg
  publication-title: Germany
– volume: 198
  start-page: 165
  year: 2009
  end-page: 172
  ident: b0255
  article-title: Discrete time model and algorithms for container yard crane scheduling
  publication-title: Eur. J. Oper. Res.
– year: 2004
  ident: b0285
  article-title: Pure mathematics for advanced level
– reference: A. Azab, A. Karam and A. Eltawil, “Impact of collaborative external truck scheduling on yard efficiency in container terminals,” in
– volume: 24
  start-page: 899
  year: 2018
  end-page: 932
  ident: b0035
  article-title: Scheduling crossover cranes at container terminals during seaside peak times
  publication-title: J. Heuristics
– volume: 49
  start-page: 686
  year: 2015
  end-page: 705
  ident: b0130
  article-title: Scheduling twin yard cranes in a container block
  publication-title: Transp. Sci.
– volume: 211
  start-page: 40
  year: 2016
  end-page: 57
  ident: b0085
  article-title: Cooperative twin-crane scheduling
  publication-title: Discret. Appl. Math.
– volume: 136
  start-page: 332
  year: 2012
  end-page: 343
  ident: b0270
  article-title: A continuous time model for multiple yard crane scheduling with last minute job arrivals
  publication-title: Int. J. Production Economics
– volume: 40
  start-page: 473
  year: 2006
  end-page: 483
  ident: b0180
  article-title: Double-cycling strategies for container ships and their effect on ship loading and unloading operations
  publication-title: Transp. Sci.
– volume: 23
  start-page: 465
  year: 2020
  end-page: 485
  ident: b0100
  article-title: Interference aware scheduling of triple-crossover-cranes
  publication-title: J. Sched.
– year: 2020
  ident: b0235
  article-title: An IoT Based System Predictive Maintenance and Operations Scheduling System for Yard Crane Control in Container Terminals, in
  publication-title: Cairo
– volume: 89
  start-page: 23
  year: 2015
  end-page: 33
  ident: b0105
  article-title: Priority rules for twin automated stacking cranes that collaborate
  publication-title: Comput. Ind. Eng.
– volume: 271
  start-page: 288
  year: 2018
  end-page: 316
  ident: b0195
  article-title: Yard Crane Scheduling for container storage, retrieval, and relocation
  publication-title: Eur. J. Oper. Res.
– volume: 25
  start-page: 472
  year: 2011
  end-page: 484
  ident: b0200
  article-title: Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information
  publication-title: Adv. Eng. Inf.
– volume: 32
  start-page: 593
  year: 2010
  end-page: 615
  ident: b0120
  article-title: Real-time scheduling for twin RMGs in an automated container yard
  publication-title: OR Spectr.
– volume: 25
  start-page: 3
  year: 2022
  end-page: 34
  ident: b0135
  article-title: Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
  publication-title: J. Sched.
– start-page: 1
  year: 2016
  end-page: 31
  ident: b0040
  article-title: “Container Terminal Automation”, in
– volume: 164
  start-page: 100
  year: 2014
  end-page: 111
  ident: b0295
  article-title: Robust location transportation problems under uncertain demands
  publication-title: Discret. Appl. Math.
– volume: 15
  start-page: 467
  year: 2010
  end-page: 474
  ident: b0185
  article-title: Integrated quay crane and yard truck schedule problem in container terminals
  publication-title: Tsinghua Sci. Technol.
– reference: , Malta, 2020.
– volume: 32
  start-page: 617
  year: 2010
  end-page: 632
  ident: b0095
  article-title: Scheduling automated triple cross-over stacking cranes in a container yard
  publication-title: OR Spectr.
– volume: 164
  start-page: 64
  issue: 1
  year: 2005
  ident: 10.1016/j.aei.2023.102015_b0260
  article-title: Crane scheduling in container yards with inter-crane interference
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2003.11.025
– year: 2005
  ident: 10.1016/j.aei.2023.102015_b0230
– volume: 25
  start-page: 452
  issue: 3
  year: 2011
  ident: 10.1016/j.aei.2023.102015_b0215
  article-title: Berth allocation planning in Seville inland port by simulation and optimisation
  publication-title: Adv. Eng. Inform.
  doi: 10.1016/j.aei.2011.05.001
– volume: 271
  start-page: 288
  issue: 1
  year: 2018
  ident: 10.1016/j.aei.2023.102015_b0195
  article-title: Yard Crane Scheduling for container storage, retrieval, and relocation
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2018.05.007
– volume: 138
  start-page: 101966
  year: 2020
  ident: 10.1016/j.aei.2023.102015_b0155
  article-title: Integrated optimization on yard crane scheduling and vehicle positioning at container yards
  publication-title: Transp. Res. E
  doi: 10.1016/j.tre.2020.101966
– volume: 49
  start-page: 990
  issue: 4
  year: 2015
  ident: 10.1016/j.aei.2023.102015_b0265
  article-title: Scheduling Multiple Yard Cranes with Crane Interference and Safety Distance Requirement
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.2015.0641
– volume: 48
  start-page: 1
  year: 2021
  ident: 10.1016/j.aei.2023.102015_b0010
  article-title: Scheduling of collaborative operations of yard cranes and yard trucks for export containers using hybrid approaches
  publication-title: Adv. Eng. Inform.
  doi: 10.1016/j.aei.2021.101292
– volume: 129
  start-page: 404
  year: 2019
  ident: 10.1016/j.aei.2023.102015_b0030
  article-title: A study on multi-ASC scheduling method of automated container terminals based on graph theory
  publication-title: Comput. Ind. Eng.
  doi: 10.1016/j.cie.2019.01.050
– volume: 23
  start-page: 465
  issue: 4
  year: 2020
  ident: 10.1016/j.aei.2023.102015_b0100
  article-title: Interference aware scheduling of triple-crossover-cranes
  publication-title: J. Sched.
  doi: 10.1007/s10951-019-00634-6
– ident: 10.1016/j.aei.2023.102015_b0055
  doi: 10.1109/IEEM44572.2019.8978608
– volume: 40
  start-page: 473
  issue: 4
  year: 2006
  ident: 10.1016/j.aei.2023.102015_b0180
  article-title: Double-cycling strategies for container ships and their effect on ship loading and unloading operations
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.1060.0148
– volume: 1
  year: 2021
  ident: 10.1016/j.aei.2023.102015_b0290
  article-title: “ Is uncertainty always bad for the performance of transportation systems?,” Communications
  publication-title: Transp. Res.
– year: 2013
  ident: 10.1016/j.aei.2023.102015_b0050
  article-title: Design and Operation of Automated Container Storage Systems, Springer-Verlag, Berlin Heidelberg
  publication-title: Germany
– volume: 49
  start-page: 686
  issue: 3
  year: 2015
  ident: 10.1016/j.aei.2023.102015_b0130
  article-title: Scheduling twin yard cranes in a container block
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.2014.0533
– volume: 115
  start-page: 221
  issue: 1
  year: 2008
  ident: 10.1016/j.aei.2023.102015_b0250
  article-title: Deployment strategies of double-rail-mounted gantry crane systems for loading outbound containers in container terminals
  publication-title: Int. J. Production Economics
  doi: 10.1016/j.ijpe.2008.05.014
– volume: 32
  start-page: 617
  year: 2010
  ident: 10.1016/j.aei.2023.102015_b0095
  article-title: Scheduling automated triple cross-over stacking cranes in a container yard
  publication-title: OR Spectr.
  doi: 10.1007/s00291-010-0206-3
– ident: 10.1016/j.aei.2023.102015_b0070
  doi: 10.5220/0008974700890099
– year: 2004
  ident: 10.1016/j.aei.2023.102015_b0285
– volume: 19
  start-page: 3775
  issue: 12
  year: 2017
  ident: 10.1016/j.aei.2023.102015_b0275
  article-title: Two yard crane scheduling with dynamic processing time and interference
  publication-title: IEEE Trans. Intell. Transp. Syst.
  doi: 10.1109/TITS.2017.2780256
– volume: 211
  start-page: 40
  year: 2016
  ident: 10.1016/j.aei.2023.102015_b0085
  article-title: Cooperative twin-crane scheduling
  publication-title: Discret. Appl. Math.
  doi: 10.1016/j.dam.2016.04.006
– ident: 10.1016/j.aei.2023.102015_b0005
  doi: 10.1007/978-3-319-94767-9_6
– volume: 2018
  start-page: 1
  year: 2018
  ident: 10.1016/j.aei.2023.102015_b0015
  article-title: Performance comparison of real-time yard crane dispatching strategies at nontransshipment container terminals
  publication-title: Math. Probl. Eng.
– volume: 82
  start-page: 1
  issue: 6
  year: 2022
  ident: 10.1016/j.aei.2023.102015_b0160
  article-title: Integrated scheduling of automated yard cranes and automated guided vehicles with limited buffer capacity of dual-trolley quay cranes in automated container terminals
  publication-title: Logistic
– volume: 149
  start-page: 1
  year: 2020
  ident: 10.1016/j.aei.2023.102015_b0150
  article-title: Scheduling of container-handling equipment during the loading process at an automated container terminal
  publication-title: Comput. Ind. Eng.
  doi: 10.1016/j.cie.2020.106848
– volume: 125
  start-page: 261
  year: 2019
  ident: 10.1016/j.aei.2023.102015_b0140
  article-title: Sequencing storage and retrieval requests in a container block with multiple open locations
  publication-title: Transp. Res. E
  doi: 10.1016/j.tre.2019.03.008
– volume: 2
  start-page: 95
  issue: 1
  year: 2010
  ident: 10.1016/j.aei.2023.102015_b0205
  article-title: Efficiency considerations for sequencing and scheduling of double-rail-mounted gantry cranes at maritime container terminals
  publication-title: Int. J. Shipping and Transport Logistics
  doi: 10.1504/IJSTL.2010.029899
– volume: 32
  start-page: 593
  issue: 3
  year: 2010
  ident: 10.1016/j.aei.2023.102015_b0120
  article-title: Real-time scheduling for twin RMGs in an automated container yard
  publication-title: OR Spectr.
  doi: 10.1007/s00291-010-0209-0
– volume: 25
  start-page: 3
  year: 2022
  ident: 10.1016/j.aei.2023.102015_b0135
  article-title: Twin-crane scheduling during seaside workload peaks with a dedicated handshake area
  publication-title: J. Sched.
  doi: 10.1007/s10951-021-00710-w
– year: 2020
  ident: 10.1016/j.aei.2023.102015_b0235
  article-title: An IoT Based System Predictive Maintenance and Operations Scheduling System for Yard Crane Control in Container Terminals, in International Association for Management of Technology (IAMOT)
  publication-title: Cairo
– volume: 261
  start-page: 108
  issue: 1
  year: 2017
  ident: 10.1016/j.aei.2023.102015_b0090
  article-title: A simulation study of the performance of twin automated stacking cranes at a seaport container terminal
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2017.01.037
– volume: 136
  start-page: 332
  issue: 2
  year: 2012
  ident: 10.1016/j.aei.2023.102015_b0270
  article-title: A continuous time model for multiple yard crane scheduling with last minute job arrivals
  publication-title: Int. J. Production Economics
  doi: 10.1016/j.ijpe.2011.12.020
– volume: 34
  start-page: 563
  year: 2012
  ident: 10.1016/j.aei.2023.102015_b0025
  article-title: Effects of storage block layout and automated yard crane systems on the performance of seaport container terminals
  publication-title: OR Spectr.
  doi: 10.1007/s00291-011-0242-7
– year: 2020
  ident: 10.1016/j.aei.2023.102015_b0045
  article-title: A New Formulation for the Yard Crane Scheduling Problem with Energy Consumption Considerations, in International Association for Management of Technology (IAMOT)
  publication-title: Cairo
– volume: 22
  start-page: 517
  year: 2019
  ident: 10.1016/j.aei.2023.102015_b0280
  article-title: A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals
  publication-title: J. Sched.
  doi: 10.1007/s10951-019-00611-z
– volume: 26
  start-page: 208
  year: 2016
  ident: 10.1016/j.aei.2023.102015_b0245
  article-title: Sequencing twin automated stacking cranes in a block at automated container terminal
  publication-title: Transp. Res. C
  doi: 10.1016/j.trc.2016.06.004
– start-page: 955
  year: 2013
  ident: 10.1016/j.aei.2023.102015_b0080
  article-title: A Proposed heuristic for Solving the Container Pre-marshalling Problem
– volume: 128
  start-page: 553
  year: 2019
  ident: 10.1016/j.aei.2023.102015_b0065
  article-title: Scheduling cooperative twin automated stacking cranes in automated container terminals
  publication-title: Comput. Ind. Eng.
  doi: 10.1016/j.cie.2018.12.039
– volume: 44
  start-page: 169
  issue: 2
  year: 2010
  ident: 10.1016/j.aei.2023.102015_b0240
  article-title: Sequencing two cooperating automated stacking cranes in a container terminal
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.1090.0298
– year: 2018
  ident: 10.1016/j.aei.2023.102015_b0020
– volume: 201
  start-page: 70
  year: 2015
  ident: 10.1016/j.aei.2023.102015_b0110
  article-title: Scheduling co-operating stacking cranes with predetermined container sequences
  publication-title: Discret. Appl. Math.
  doi: 10.1016/j.dam.2015.07.042
– volume: 57
  start-page: 456
  issue: 2
  year: 2009
  ident: 10.1016/j.aei.2023.102015_b0220
  article-title: Scheduling of container storage and retrieval
  publication-title: Oper. Res.
  doi: 10.1287/opre.1080.0621
– volume: 24
  start-page: 899
  year: 2018
  ident: 10.1016/j.aei.2023.102015_b0035
  article-title: Scheduling crossover cranes at container terminals during seaside peak times
  publication-title: J. Heuristics
  doi: 10.1007/s10732-018-9380-2
– start-page: 1
  year: 2016
  ident: 10.1016/j.aei.2023.102015_b0040
– volume: 164
  start-page: 100
  year: 2014
  ident: 10.1016/j.aei.2023.102015_b0295
  article-title: Robust location transportation problems under uncertain demands
  publication-title: Discret. Appl. Math.
  doi: 10.1016/j.dam.2011.09.015
– volume: 198
  start-page: 165
  issue: 1
  year: 2009
  ident: 10.1016/j.aei.2023.102015_b0255
  article-title: Discrete time model and algorithms for container yard crane scheduling
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2008.08.019
– ident: 10.1016/j.aei.2023.102015_b0060
– volume: 39
  start-page: 14
  year: 2019
  ident: 10.1016/j.aei.2023.102015_b0165
  article-title: Yard crane scheduling problem in a container terminal considering risk caused by uncertainty
  publication-title: Adv. Eng. Inform
  doi: 10.1016/j.aei.2018.11.004
– year: 2011
  ident: 10.1016/j.aei.2023.102015_b0190
– ident: 10.1016/j.aei.2023.102015_b0125
– volume: 1
  start-page: 61
  issue: 1
  year: 1954
  ident: 10.1016/j.aei.2023.102015_b0175
  article-title: Optimal two- and three-stage production schedules with setup times included
  publication-title: Nav. Res. Logist. Q.
  doi: 10.1002/nav.3800010110
– volume: 89
  start-page: 23
  year: 2015
  ident: 10.1016/j.aei.2023.102015_b0105
  article-title: Priority rules for twin automated stacking cranes that collaborate
  publication-title: Comput. Ind. Eng.
  doi: 10.1016/j.cie.2015.04.026
– volume: 273
  start-page: 82
  issue: 1
  year: 2019
  ident: 10.1016/j.aei.2023.102015_b0115
  article-title: An exact solution approach for scheduling cooperative gantry cranes
  publication-title: Eur. J. Oper. Res.
  doi: 10.1016/j.ejor.2018.07.043
– volume: 25
  start-page: 472
  issue: 3
  year: 2011
  ident: 10.1016/j.aei.2023.102015_b0200
  article-title: Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information
  publication-title: Adv. Eng. Inf.
  doi: 10.1016/j.aei.2011.02.002
– volume: 242
  start-page: 53
  year: 2018
  ident: 10.1016/j.aei.2023.102015_b0075
  article-title: Scheduling cooperative gantry cranes with seaside and landside jobs
  publication-title: Discret. Appl. Math.
  doi: 10.1016/j.dam.2017.06.015
– volume: 51
  start-page: 305
  issue: 1
  year: 2016
  ident: 10.1016/j.aei.2023.102015_b0210
  article-title: Scheduling of different automated yard crane systems at container terminals
  publication-title: Transp. Sci.
  doi: 10.1287/trsc.2016.0687
– volume: 121
  start-page: 81
  issue: 1
  year: 2009
  ident: 10.1016/j.aei.2023.102015_b0170
  article-title: Johnson’s algorithm: A key to solve optimally or approximately flow shop scheduling problems with unavailability periods
  publication-title: Int. J. Production Economics
  doi: 10.1016/j.ijpe.2008.09.018
– volume: 29
  start-page: 59
  issue: 1
  year: 2015
  ident: 10.1016/j.aei.2023.102015_b0225
  article-title: Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption
  publication-title: Adv. Eng. Inf.
  doi: 10.1016/j.aei.2014.09.003
– volume: 94
  start-page: 32
  year: 2016
  ident: 10.1016/j.aei.2023.102015_b0145
  article-title: Modelling of integrated vehicle scheduling and container storage problems in unloading process at an automated container terminal
  publication-title: Comput. Ind. Eng.
  doi: 10.1016/j.cie.2016.01.010
– volume: 15
  start-page: 467
  issue: 4
  year: 2010
  ident: 10.1016/j.aei.2023.102015_b0185
  article-title: Integrated quay crane and yard truck schedule problem in container terminals
  publication-title: Tsinghua Sci. Technol.
  doi: 10.1016/S1007-0214(10)70089-4
SSID ssj0016897
Score 2.4645753
Snippet The Twin-Automated Stacking Crane (Twin-ASC) system is a special configuration of Yard Crane (YC) that is common in most of the Automated Container Terminals...
SourceID crossref
elsevier
SourceType Enrichment Source
Index Database
Publisher
StartPage 102015
SubjectTerms Automated container terminals
Handshake area
Makespan
Solution algorithm
Stacking crane
Title A new solution approach for the twin yard crane scheduling problem in automated container terminals
URI https://dx.doi.org/10.1016/j.aei.2023.102015
Volume 57
WOSCitedRecordID wos001019385800001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection Journals 2021
  customDbUrl:
  eissn: 1873-5320
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0016897
  issn: 1474-0346
  databaseCode: AIEXJ
  dateStart: 20020101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1Lb9QwELZgy4ELb0R5yQdORKmysRPbxwgVAYIWiYL2FtmxQ1Nts9Vulrb_nnFiO1F5CJC4RJEVZ6KZT854_M0MQi-UlHOtiIpzY9KY6jSLFZ-TWFWSaVJrLfpQ9pf37OCALxbiozsu2PTtBFjb8osLcfZfTQ1jYGybOvsX5g4vhQG4B6PDFcwO1z8yfGG7hEdeRigaHviE3XnTRpc2elDBf8pEsL2F343LSu-7y9gYiNx2K3Bmje7J7NKmCEaOOLPcTD3awpMIzFjZMHLlWLsJlf5wKfX2q5IjizI6BJ00l02gAB0bF-X5sDqWpy7rqueVdPJ8iFUXp-tpnCIlgSXngmc-gWZkK9n1ljIaJ8RFIc0wxhmJbb-K6SI9VLH-Yb0fQg8ne9I0e1aorUSRDPmhV8pof7KirCTYc9mahovraCdlmeAztFO83V-8C2dPOR9a8vhP82fhPSvwiqCfezMTD-XoDrrltha4GCBxF10z7T10220zsFvEN_dRVWBACPYIwR4hGGyGASHYIgRbhOAeIXhECHYIwfBAQAgOCMEBIQ_Q59f7R6_exK7XRlylgnVxZvKMaJqCy6SkSWSmqMyyOmEp5TnNFGda5NSA81rnwnDClKBSc1nrzOhEp-QhmrWr1jxCWChRSWJSDb4tTepKJamqtLGF9OaE6XwXJV5nZeUK0dt-KMvSMw5PSlBzadVcDmreRS_DlLOhCsvvHqbeEKVzIwf3sATU_Hra43-b9gTdHNH-FM269dY8Qzeqb12zWT932PoO9dma1A
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=A+new+solution+approach+for+the+twin+yard+crane+scheduling+problem+in+automated+container+terminals&rft.jtitle=Advanced+engineering+informatics&rft.au=Oladugba%2C+Andrew+Omoniyi&rft.au=Gheith%2C+Mohamed&rft.au=Eltawil%2C+Amr&rft.date=2023-08-01&rft.pub=Elsevier+Ltd&rft.issn=1474-0346&rft.eissn=1873-5320&rft.volume=57&rft_id=info:doi/10.1016%2Fj.aei.2023.102015&rft.externalDocID=S147403462300143X
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1474-0346&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1474-0346&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1474-0346&client=summon