Guo, J., Zou, J., Du, B., & Wang, K. (2023). Integrated scheduling for remanufacturing system considering component commonality using improved multi-objective genetic algorithm. Computers & industrial engineering, 182, 109419. https://doi.org/10.1016/j.cie.2023.109419
Citace podle Chicago (17th ed.)Guo, Jun, Junfeng Zou, Baigang Du, a Kaipu Wang. "Integrated Scheduling for Remanufacturing System Considering Component Commonality Using Improved Multi-objective Genetic Algorithm." Computers & Industrial Engineering 182 (2023): 109419. https://doi.org/10.1016/j.cie.2023.109419.
Citace podle MLA (9th ed.)Guo, Jun, et al. "Integrated Scheduling for Remanufacturing System Considering Component Commonality Using Improved Multi-objective Genetic Algorithm." Computers & Industrial Engineering, vol. 182, 2023, p. 109419, https://doi.org/10.1016/j.cie.2023.109419.