An event-based reactive scheduling approach for the Resource Constrained Project Scheduling Problem with unreliable resources

The Resource Constrained Project Scheduling Problem (RCPSP) is a combinatorial optimization problem which is non-deterministic polynomial-time (NP)-hard in nature. Due to the diversified applications of RCPSPs, they have been commonly used as scheduling procedures in real-world problems. Since, in p...

Full description

Saved in:
Bibliographic Details
Published in:Computers & industrial engineering Vol. 151; p. 106981
Main Authors: Chakrabortty, Ripon K., Rahman, Humyun Fuad, Haque, Khan M.A., Paul, Sanjoy Kumar, Ryan, Michael J.
Format: Journal Article
Language:English
Published: Elsevier Ltd 01.01.2021
Subjects:
ISSN:0360-8352, 1879-0550
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Abstract The Resource Constrained Project Scheduling Problem (RCPSP) is a combinatorial optimization problem which is non-deterministic polynomial-time (NP)-hard in nature. Due to the diversified applications of RCPSPs, they have been commonly used as scheduling procedures in real-world problems. Since, in practice, project data are prone to changes or disruptions, this paper introduces a mathematical model for a reactive scheduling approach, called the Event Based Reactive Approach (EBRA). This proposed EBRA approach is employed to examine its recovery performance under both a single disruption and a series of independent resource disruptions. Several simulated disruption data are hypothesized to represent real-world disruption scenarios and, without loss of generality, the proposed reactive approach is proved to be efficient in reducing the number of variables and computational complexity and also to be resilient in realistic changes, such as duration inflation and dynamic resource usages. Along with employing an exact method by LINGO software, this paper also proposes an enhanced iterated greedy (EnIG) approach to meta-heuristically solve larger and computationally expensive benchmark instances taken from the Project Scheduling Library (PSPLIB). •Formulated one event based reactive model to deal with disruption scenarios.•A solution approach is proposed to generate a revised schedule after disruptions.•Comparative evaluation of two different reactive strategies are carried out.•The model is capable of dealing with a single, as well as multiple disruptions.
AbstractList The Resource Constrained Project Scheduling Problem (RCPSP) is a combinatorial optimization problem which is non-deterministic polynomial-time (NP)-hard in nature. Due to the diversified applications of RCPSPs, they have been commonly used as scheduling procedures in real-world problems. Since, in practice, project data are prone to changes or disruptions, this paper introduces a mathematical model for a reactive scheduling approach, called the Event Based Reactive Approach (EBRA). This proposed EBRA approach is employed to examine its recovery performance under both a single disruption and a series of independent resource disruptions. Several simulated disruption data are hypothesized to represent real-world disruption scenarios and, without loss of generality, the proposed reactive approach is proved to be efficient in reducing the number of variables and computational complexity and also to be resilient in realistic changes, such as duration inflation and dynamic resource usages. Along with employing an exact method by LINGO software, this paper also proposes an enhanced iterated greedy (EnIG) approach to meta-heuristically solve larger and computationally expensive benchmark instances taken from the Project Scheduling Library (PSPLIB). •Formulated one event based reactive model to deal with disruption scenarios.•A solution approach is proposed to generate a revised schedule after disruptions.•Comparative evaluation of two different reactive strategies are carried out.•The model is capable of dealing with a single, as well as multiple disruptions.
ArticleNumber 106981
Author Ryan, Michael J.
Rahman, Humyun Fuad
Haque, Khan M.A.
Paul, Sanjoy Kumar
Chakrabortty, Ripon K.
Author_xml – sequence: 1
  givenname: Ripon K.
  surname: Chakrabortty
  fullname: Chakrabortty, Ripon K.
  email: r.chakrabortty@adfa.edu.au
  organization: Capability Systems Centre, School of Eng. & IT, UNSW Canberra at ADFA, Australia
– sequence: 2
  givenname: Humyun Fuad
  surname: Rahman
  fullname: Rahman, Humyun Fuad
  email: humyun.fuad@adfa.edu.au
  organization: Capability Systems Centre, School of Eng. & IT, UNSW Canberra at ADFA, Australia
– sequence: 3
  givenname: Khan M.A.
  surname: Haque
  fullname: Haque, Khan M.A.
  email: khanmdariful.haque@mavs.uta.edu
  organization: Department of Industrial, Manufacturing, & Systems Engineering, The University of Texas at Arlington, Arlington, TX, USA
– sequence: 4
  givenname: Sanjoy Kumar
  surname: Paul
  fullname: Paul, Sanjoy Kumar
  email: sanjoy.paul@uts.edu.au
  organization: UTS Business School, University of Technology Sydney, Sydney, Australia
– sequence: 5
  givenname: Michael J.
  surname: Ryan
  fullname: Ryan, Michael J.
  email: m.ryan@adfa.edu.au
  organization: Capability Systems Centre, School of Eng. & IT, UNSW Canberra at ADFA, Australia
BookMark eNp9kE1LAzEQhoNUsK3-AG_5A1uT3W62wVMpfoGg-HEO2WTWzbJNSpJWPPjfzbKC4KGnMC_zTGaeGZpYZwGhS0oWlFB21S2UgUVO8qFmfEVP0JSuKp6RsiQTNCUFI9mqKPMzNAuhI4QsS06n6HttMRzAxqyWATT2IFU0B8BBtaD3vbEfWO523knV4sZ5HFvALxDc3ivAG2dD9NLYRD5714GK-PUPTFHdwxZ_mtjivfXQG5mC9MnIh3N02sg-wMXvO0fvtzdvm_vs8enuYbN-zFTOq5gVSsu64ExT4KzOZSOLvKG0UgwYVJXWxVJJrkteUCo5lIpDzoHkdQmMrmoo5qga5yrvQvDQCGWijMbZYfteUCIGi6JLOYjBohgtJpL-I3febKX_Ospcjwykkw4GvAipxSrQxidDQjtzhP4BePWP9Q
CitedBy_id crossref_primary_10_1016_j_cie_2023_109741
crossref_primary_10_1016_j_cie_2022_108387
crossref_primary_10_1016_j_cie_2022_108402
crossref_primary_10_1016_j_cie_2023_109848
crossref_primary_10_1080_17509653_2024_2436658
crossref_primary_10_1109_TEM_2025_3568826
crossref_primary_10_1109_ACCESS_2022_3175312
crossref_primary_10_3390_su15042930
crossref_primary_10_1016_j_cie_2025_111043
crossref_primary_10_1016_j_cor_2024_106624
crossref_primary_10_1109_ACCESS_2022_3147465
crossref_primary_10_1016_j_autcon_2023_104958
crossref_primary_10_1016_j_ress_2024_110028
crossref_primary_10_1016_j_cie_2023_109398
crossref_primary_10_1007_s40747_024_01365_8
crossref_primary_10_1177_03611981241257412
crossref_primary_10_1007_s40747_022_00784_9
crossref_primary_10_1080_21681015_2024_2377180
crossref_primary_10_1109_ACCESS_2023_3289822
crossref_primary_10_3390_machines11060580
Cites_doi 10.1111/j.1937-5956.2009.01023.x
10.1016/j.cie.2019.04.014
10.1016/j.swevo.2019.07.002
10.1111/itor.12644
10.1007/s001700050166
10.1016/j.cor.2017.02.018
10.1016/j.cie.2020.106287
10.1016/S0377-2217(97)00348-2
10.1016/j.swevo.2017.06.001
10.1080/0305215X.2016.1261247
10.3934/jimo.2016.12.565
10.1007/s10696-016-9260-8
10.1016/j.ejor.2019.04.025
10.1016/0098-1354(96)00207-4
10.1016/j.cie.2019.02.039
10.1016/j.compchemeng.2014.05.009
10.1016/j.ejor.2005.12.009
10.1016/j.cor.2010.01.001
10.1016/j.autcon.2019.103052
10.1007/s10951-015-0423-3
10.1016/j.cor.2009.12.011
10.1023/A:1022235519958
10.1016/0377-2217(92)90320-9
10.1287/mnsc.28.10.1197
10.1007/s10696-012-9147-2
10.1007/s10898-006-9039-7
10.5267/j.jpm.2018.1.005
10.1002/aic.11522
10.1016/j.cie.2019.01.033
10.1057/palgrave.jors.2601860
10.1007/s10951-007-0021-0
10.1002/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I
10.1016/j.ejor.2015.11.021
10.1287/mnsc.41.10.1693
10.1287/moor.8.4.538
10.1016/S0098-1354(01)00671-8
10.1002/aic.11593
10.1016/j.ejor.2010.03.037
10.1021/ie303294k
10.1007/s10696-011-9127-y
10.1287/mnsc.16.1.93
10.1080/10429247.2018.1492269
10.1016/0098-1354(95)87102-0
10.1016/j.ejor.2014.05.036
10.1016/j.autcon.2013.05.030
10.1287/mnsc.44.5.714
10.1016/j.cie.2016.12.040
10.1016/S0098-1354(98)00296-8
10.1016/j.asoc.2019.105552
10.1023/A:1010997814183
10.1016/j.ejor.2015.04.015
10.1287/ijoc.1040.0121
10.1080/00207543.2018.1504245
10.1016/S0377-2217(99)00485-3
10.1016/S0377-2217(02)00758-0
10.1016/S0305-0483(00)00046-3
10.1016/j.compchemeng.2004.05.002
ContentType Journal Article
Copyright 2020 Elsevier Ltd
Copyright_xml – notice: 2020 Elsevier Ltd
DBID AAYXX
CITATION
DOI 10.1016/j.cie.2020.106981
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Applied Sciences
Engineering
EISSN 1879-0550
ExternalDocumentID 10_1016_j_cie_2020_106981
S0360835220306513
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1RT
1~.
1~5
29F
4.4
457
4G.
5GY
5VS
7-5
71M
8P~
9JN
9JO
AAAKG
AABNK
AACTN
AAEDT
AAEDW
AAFWJ
AAIAV
AAIKC
AAIKJ
AAKOC
AALRI
AAMNW
AAOAW
AAQFI
AAQXK
AARIN
AAXUO
ABAOU
ABMAC
ABUCO
ABXDB
ABYKQ
ACAZW
ACDAQ
ACGFO
ACGFS
ACNCT
ACNNM
ACRLP
ADBBV
ADEZE
ADGUI
ADMUD
ADRHT
ADTZH
AEBSH
AECPX
AEKER
AENEX
AFKWA
AFTJW
AGHFR
AGUBO
AGYEJ
AHHHB
AHJVU
AIEXJ
AIGVJ
AIKHN
AITUG
AJBFU
AJOXV
ALMA_UNASSIGNED_HOLDINGS
AMFUW
AMRAJ
APLSM
ARUGR
ASPBG
AVWKF
AXJTR
AZFZN
BJAXD
BKOJK
BKOMP
BLXMC
CS3
DU5
EBS
EFJIC
EFLBG
EJD
EO8
EO9
EP2
EP3
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-2
G-Q
G8K
GBLVA
HAMUX
HLZ
HVGLF
HZ~
H~9
IHE
J1W
JJJVA
KOM
LX9
LY1
LY7
M41
MHUIS
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
RIG
RNS
ROL
RPZ
RXW
SBC
SDF
SDG
SDP
SDS
SES
SET
SEW
SPC
SPCBC
SSB
SSD
SST
SSW
SSZ
T5K
TAE
TN5
WUQ
XPP
ZMT
~G-
9DU
AATTM
AAXKI
AAYWO
AAYXX
ABDPE
ABJNI
ABWVN
ACLOT
ACRPL
ACVFH
ADCNI
ADNMO
AEIPS
AEUPX
AFJKZ
AFPUW
AGQPQ
AIGII
AIIUN
AKBMS
AKRWK
AKYEP
ANKPU
APXCP
CITATION
EFKBS
~HD
ID FETCH-LOGICAL-c297t-3cdab396d1e96b2afa32f117c6e6e77dd34ca9d59311a9e5c9e29e02b5e618be3
ISICitedReferencesCount 24
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=000632959400050&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 0360-8352
IngestDate Sat Nov 29 07:22:25 EST 2025
Tue Nov 18 21:18:41 EST 2025
Fri Feb 23 02:44:26 EST 2024
IsPeerReviewed true
IsScholarly true
Keywords Event-based rescheduling
Meta-heuristic approach
Enhanced iterated greedy
Resource Constrained Project Scheduling
Mixed integer linear programming
Disruptions
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c297t-3cdab396d1e96b2afa32f117c6e6e77dd34ca9d59311a9e5c9e29e02b5e618be3
ParticipantIDs crossref_citationtrail_10_1016_j_cie_2020_106981
crossref_primary_10_1016_j_cie_2020_106981
elsevier_sciencedirect_doi_10_1016_j_cie_2020_106981
PublicationCentury 2000
PublicationDate January 2021
2021-01-00
PublicationDateYYYYMMDD 2021-01-01
PublicationDate_xml – month: 01
  year: 2021
  text: January 2021
PublicationDecade 2020
PublicationTitle Computers & industrial engineering
PublicationYear 2021
Publisher Elsevier Ltd
Publisher_xml – name: Elsevier Ltd
References Li, Ierapetritou (b39) 2008; 54
Sprecher, Kolisch (b58) 1996; 96
Chakrabortty, Abbasi, Ryan (b8) 2018
Tomita, Kameda (b61) 2007; 37
Davari, Demeulemeester (b19) 2019; 57
Artigues, Leus, Nobibon (b3) 2013; 25
Gnägi, Rihm, Zimmermann, Trautmann (b23) 2019; 129
Chakrabortty, Ryan (b12) 2019
Artigues, Michelon, Reusser (b4) 2003; 149
Méndez, Henning, Cerdá (b44) 2001; 25
Naber (b46) 2017; 84
Hartmann, Drexl (b26) 1998; 32
Huercio, Espuna, Puigjaner (b29) 1995; 19
Ma, Demeulemeester, He, Wang (b43) 2019; 131
Węglarz, Józefowska, Mika, Waligóra (b68) 2011; 208
Wang, Zheng (b67) 2018; 38
Gnägi, Rihm, Trautmann (b22) 2018
Vanhoucke (b64) 2018; 5
Talbot (b59) 1982; 28
Sprecher, Drexl (b57) 1998; 107
Croteau (b18) 2018
Sadeh, N., Otsuka, S., & Schnelbach, R. (1993). Predictive and reactive scheduling with the micro-boss production scheduling and control system. In
Chakrabortty, Sarker, Essam (b14) 2017; 112
Li, Womer (b41) 2015; 246
Vooradi, Shaik (b66) 2013; 52
.
Ballestin, Leus (b5) 2009; 18
Artigues, Demassey, Neron (b1) 2013
Hartmann, Kolisch (b27) 2000; 127
Rahman, Nielsen (b53) 2019
Habibi, Barzinpour, Sadjadi (b25) 2018; 3
Li, Willis (b40) 1992; 56
Mingozzi, Maniezzo, Ricciardelli, Bianco (b45) 1998; 44
Lenstra Jr (b38) 1983; 8
Zhu, Bard, Yu (b73) 2005; 56
Chakrabortty, Sarker, Essam (b16) 2018
Deblaere, Demeulemeester, Herroelen (b20) 2011; 38
Pinto, Grossmann (b49) 1996; 20
Uysal, İşleyen, Çetinkaya (b63) 2018; 5
Yan (b69) 2017
Kolisch, Sprecher, Drexl (b32) 1995; 41
Floudas, Lin (b21) 2004; 28
Chakrabortty, Sarker, Essam (b13) 2015
Tian, Hao, Gen (b60) 2019; 130
Ozturk, Oner (b48) 2020
Gnägi, Zimmermann, Trautmann (b24) 2018
Castro, Harjunkoski, Grossmann (b7) 2019; 278
Zhang, Xu (b71) 2016; 12
Artigues, Koné, Lopez, Mongeau (b2) 2015
Lambrechts, Demeulemeester, Herroelen (b37) 2008; 11
Pritsker, Waiters, Wolfe (b51) 1969; 16
Li, Zhang (b42) 2013; 35
Ponnambalam, Aravindan, Naidu (b50) 2000; 16
Kopanos, Kyriakidis, Georgiadis (b34) 2014; 68
Lamas, Demeulemeester (b36) 2016; 19
Zapata, Hodge, Reklaitis (b70) 2008; 54
Koné, Artigues, Lopez, Mongeau (b33) 2011; 38
Chakrabortty, Rahman, Ryan (b11) 2020; 140
Naber, Kolisch (b47) 2014; 239
Rahman, Chakrabortty, Ryan (b52) 2020; 111
Chakrabortty, Abbasi, Ryan (b10) 2020; 27
Bianco, Caramia (b6) 2013; 25
Chakrabortty, Abbasi, Ryan (b9) 2019
Chand, Singh, Ray (b17) 2019; 50
Zhong, Chen, Zhou, Hu (b72) 2018; 30
Honkomp, Mockus, Reklaitis (b28) 1999; 23
Kolisch, Padman (b31) 2001; 29
Chakrabortty, Sarker, Essam (b15) 2018
Kreter, Rieck, Zimmermann (b35) 2016; 251
Rihm, Trautmann, Zimmermann (b54) 2018; 30
Tormos, Lova (b62) 2001; 102
Kim, Park, Lee (b30) 2017; 49
Zhu, Bard, Yu (b74) 2006; 18
Ruiz, Stützle (b55) 2007; 177
Vieira, Herrmann, Lin (b65) 2003; 6
Hartmann (10.1016/j.cie.2020.106981_b27) 2000; 127
Chakrabortty (10.1016/j.cie.2020.106981_b10) 2020; 27
Vieira (10.1016/j.cie.2020.106981_b65) 2003; 6
Zhang (10.1016/j.cie.2020.106981_b71) 2016; 12
Li (10.1016/j.cie.2020.106981_b40) 1992; 56
Kreter (10.1016/j.cie.2020.106981_b35) 2016; 251
Naber (10.1016/j.cie.2020.106981_b46) 2017; 84
Artigues (10.1016/j.cie.2020.106981_b3) 2013; 25
Kolisch (10.1016/j.cie.2020.106981_b31) 2001; 29
Naber (10.1016/j.cie.2020.106981_b47) 2014; 239
Zhu (10.1016/j.cie.2020.106981_b73) 2005; 56
Chakrabortty (10.1016/j.cie.2020.106981_b15) 2018
Chakrabortty (10.1016/j.cie.2020.106981_b8) 2018
Bianco (10.1016/j.cie.2020.106981_b6) 2013; 25
Pinto (10.1016/j.cie.2020.106981_b49) 1996; 20
Kopanos (10.1016/j.cie.2020.106981_b34) 2014; 68
Chakrabortty (10.1016/j.cie.2020.106981_b11) 2020; 140
Floudas (10.1016/j.cie.2020.106981_b21) 2004; 28
Vanhoucke (10.1016/j.cie.2020.106981_b64) 2018; 5
10.1016/j.cie.2020.106981_b56
Sprecher (10.1016/j.cie.2020.106981_b57) 1998; 107
Chakrabortty (10.1016/j.cie.2020.106981_b12) 2019
Ponnambalam (10.1016/j.cie.2020.106981_b50) 2000; 16
Huercio (10.1016/j.cie.2020.106981_b29) 1995; 19
Rihm (10.1016/j.cie.2020.106981_b54) 2018; 30
Ma (10.1016/j.cie.2020.106981_b43) 2019; 131
Hartmann (10.1016/j.cie.2020.106981_b26) 1998; 32
Li (10.1016/j.cie.2020.106981_b39) 2008; 54
Artigues (10.1016/j.cie.2020.106981_b1) 2013
Gnägi (10.1016/j.cie.2020.106981_b24) 2018
Deblaere (10.1016/j.cie.2020.106981_b20) 2011; 38
Ruiz (10.1016/j.cie.2020.106981_b55) 2007; 177
Davari (10.1016/j.cie.2020.106981_b19) 2019; 57
Pritsker (10.1016/j.cie.2020.106981_b51) 1969; 16
Vooradi (10.1016/j.cie.2020.106981_b66) 2013; 52
Ozturk (10.1016/j.cie.2020.106981_b48) 2020
Kolisch (10.1016/j.cie.2020.106981_b32) 1995; 41
Lambrechts (10.1016/j.cie.2020.106981_b37) 2008; 11
Yan (10.1016/j.cie.2020.106981_b69) 2017
Chand (10.1016/j.cie.2020.106981_b17) 2019; 50
Gnägi (10.1016/j.cie.2020.106981_b22) 2018
Habibi (10.1016/j.cie.2020.106981_b25) 2018; 3
Zapata (10.1016/j.cie.2020.106981_b70) 2008; 54
Castro (10.1016/j.cie.2020.106981_b7) 2019; 278
Chakrabortty (10.1016/j.cie.2020.106981_b16) 2018
Artigues (10.1016/j.cie.2020.106981_b4) 2003; 149
Tomita (10.1016/j.cie.2020.106981_b61) 2007; 37
Chakrabortty (10.1016/j.cie.2020.106981_b13) 2015
Méndez (10.1016/j.cie.2020.106981_b44) 2001; 25
Mingozzi (10.1016/j.cie.2020.106981_b45) 1998; 44
Rahman (10.1016/j.cie.2020.106981_b53) 2019
Zhong (10.1016/j.cie.2020.106981_b72) 2018; 30
Tian (10.1016/j.cie.2020.106981_b60) 2019; 130
Ballestin (10.1016/j.cie.2020.106981_b5) 2009; 18
Chakrabortty (10.1016/j.cie.2020.106981_b14) 2017; 112
Zhu (10.1016/j.cie.2020.106981_b74) 2006; 18
Artigues (10.1016/j.cie.2020.106981_b2) 2015
Croteau (10.1016/j.cie.2020.106981_b18) 2018
Sprecher (10.1016/j.cie.2020.106981_b58) 1996; 96
Koné (10.1016/j.cie.2020.106981_b33) 2011; 38
Gnägi (10.1016/j.cie.2020.106981_b23) 2019; 129
Li (10.1016/j.cie.2020.106981_b42) 2013; 35
Uysal (10.1016/j.cie.2020.106981_b63) 2018; 5
Honkomp (10.1016/j.cie.2020.106981_b28) 1999; 23
Wang (10.1016/j.cie.2020.106981_b67) 2018; 38
Chakrabortty (10.1016/j.cie.2020.106981_b9) 2019
Tormos (10.1016/j.cie.2020.106981_b62) 2001; 102
Węglarz (10.1016/j.cie.2020.106981_b68) 2011; 208
Lenstra Jr (10.1016/j.cie.2020.106981_b38) 1983; 8
Talbot (10.1016/j.cie.2020.106981_b59) 1982; 28
Lamas (10.1016/j.cie.2020.106981_b36) 2016; 19
Li (10.1016/j.cie.2020.106981_b41) 2015; 246
Rahman (10.1016/j.cie.2020.106981_b52) 2020; 111
Kim (10.1016/j.cie.2020.106981_b30) 2017; 49
References_xml – start-page: 51
  year: 2020
  end-page: 56
  ident: b48
  article-title: Continuous time milp models for multi-mode resource constrained project scheduling problems
  publication-title: 2020 9th international conference on industrial technology and management (ICITM)
– volume: 3
  start-page: 55
  year: 2018
  end-page: 88
  ident: b25
  article-title: Resource-constrained project scheduling problem: review of past and recent developments
  publication-title: Journal of Project Management
– year: 2019
  ident: b53
  article-title: Scheduling automated transport vehicles for material distribution systems
  publication-title: Applied Soft Computing
– volume: 37
  start-page: 95
  year: 2007
  end-page: 111
  ident: b61
  article-title: An efficient branch-and-bound algorithm for finding a maximum clique with computational experiments
  publication-title: Journal of Global Optimization
– volume: 8
  start-page: 538
  year: 1983
  end-page: 548
  ident: b38
  article-title: Integer programming with a fixed number of variables
  publication-title: Mathematics of Operations Research
– volume: 246
  start-page: 20
  year: 2015
  end-page: 33
  ident: b41
  article-title: Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
  publication-title: European Journal of Operational Research
– year: 2018
  ident: b18
  article-title: An on-event based model for resource constrained scheduling of aircraft heavy maintenance tasks
– volume: 131
  start-page: 382
  year: 2019
  end-page: 390
  ident: b43
  article-title: A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments
  publication-title: Computers & Industrial Engineering
– volume: 12
  start-page: 565
  year: 2016
  end-page: 593
  ident: b71
  article-title: Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty
  publication-title: Journal of Industrial & Management Optimization
– volume: 25
  start-page: 175
  year: 2013
  end-page: 205
  ident: b3
  article-title: Robust optimization for resource-constrained project scheduling with uncertain activity durations
  publication-title: Flexible Services and Manufacturing Journal
– reference: Sadeh, N., Otsuka, S., & Schnelbach, R. (1993). Predictive and reactive scheduling with the micro-boss production scheduling and control system. In
– volume: 41
  start-page: 1693
  year: 1995
  end-page: 1703
  ident: b32
  article-title: Characterization and generation of a general class of resource-constrained project scheduling problems
  publication-title: Management Science
– volume: 208
  start-page: 177
  year: 2011
  end-page: 205
  ident: b68
  article-title: Project scheduling with finite or infinite number of activity processing modes–a survey
  publication-title: European Journal of Operational Research
– volume: 6
  start-page: 39
  year: 2003
  end-page: 62
  ident: b65
  article-title: Rescheduling manufacturing systems: a framework of strategies, policies, and methods
  publication-title: Journal of Scheduling
– volume: 111
  year: 2020
  ident: b52
  article-title: Memetic algorithm for solving resource constrained project scheduling problems
  publication-title: Automation in Construction
– volume: 251
  start-page: 387
  year: 2016
  end-page: 403
  ident: b35
  article-title: Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
  publication-title: European Journal of Operational Research
– volume: 54
  start-page: 2101
  year: 2008
  end-page: 2119
  ident: b70
  article-title: The multimode resource constrained multiproject scheduling problem: Alternative formulations
  publication-title: AIChE Journal
– volume: 112
  start-page: 537
  year: 2017
  end-page: 550
  ident: b14
  article-title: Resource constrained project scheduling with uncertain activity durations
  publication-title: Computers & Industrial Engineering
– start-page: 432
  year: 2018
  end-page: 436
  ident: b24
  article-title: A continuous-time unit-based milp formulation for the resource-constrained project scheduling problem
  publication-title: 2018 IEEE international conference on industrial engineering and engineering management (IEEM)
– volume: 102
  start-page: 65
  year: 2001
  end-page: 81
  ident: b62
  article-title: A competitive heuristic solution technique for resource-constrained project scheduling
  publication-title: Annals of Operations Research
– volume: 5
  start-page: 133
  year: 2018
  end-page: 149
  ident: b64
  article-title: Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges
  publication-title: Frontiers of Engineering Management
– volume: 20
  start-page: S1197
  year: 1996
  end-page: S1202
  ident: b49
  article-title: A continuous time milp model for short term scheduling of batch plants with pre-ordering constraints
  publication-title: Computers & Chemical Engineering
– volume: 19
  start-page: 409
  year: 2016
  end-page: 428
  ident: b36
  article-title: A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
  publication-title: Journal of Scheduling
– volume: 140
  year: 2020
  ident: b11
  article-title: Efficient priority rules for project scheduling under dynamic environments: A heuristic approach
  publication-title: Computers & Industrial Engineering
– start-page: 1
  year: 2019
  end-page: 15
  ident: b9
  article-title: A risk assessment framework for scheduling projects with resource and duration uncertainties
  publication-title: IEEE Transactions on Engineering Management
– volume: 32
  start-page: 283
  year: 1998
  end-page: 297
  ident: b26
  article-title: Project scheduling with multiple modes: A comparison of exact algorithms
  publication-title: Networks: An International Journal
– volume: 35
  start-page: 431
  year: 2013
  end-page: 438
  ident: b42
  article-title: Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints
  publication-title: Automation in Construction
– volume: 38
  start-page: 3
  year: 2011
  end-page: 13
  ident: b33
  article-title: Event-based milp models for resource-constrained project scheduling problems
  publication-title: Computers & Operations Research
– volume: 38
  start-page: 54
  year: 2018
  end-page: 63
  ident: b67
  article-title: A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
  publication-title: Swarm and Evolutionary Computation
– volume: 25
  start-page: 6
  year: 2013
  end-page: 24
  ident: b6
  article-title: A new formulation for the project scheduling problem under limited resources
  publication-title: Flexible Services and Manufacturing Journal
– volume: 29
  start-page: 249
  year: 2001
  end-page: 272
  ident: b31
  article-title: An integrated survey of deterministic project scheduling
  publication-title: Omega
– volume: 16
  start-page: 341
  year: 2000
  end-page: 352
  ident: b50
  article-title: A multi-objective genetic algorithm for solving assembly line balancing problem
  publication-title: International Journal of Advanced Manufacturing Technology
– start-page: 227
  year: 2018
  end-page: 242
  ident: b15
  article-title: A comparative study of different integer linear programming approaches for resource-constrained project scheduling problems
  publication-title: Data and decision sciences in action
– volume: 11
  start-page: 121
  year: 2008
  end-page: 136
  ident: b37
  article-title: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
  publication-title: Journal of Scheduling
– volume: 28
  start-page: 2109
  year: 2004
  end-page: 2129
  ident: b21
  article-title: Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
  publication-title: Computers & Chemical Engineering
– volume: 49
  start-page: 1719
  year: 2017
  end-page: 1732
  ident: b30
  article-title: Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups
  publication-title: Engineering Optimization
– volume: 84
  start-page: 33
  year: 2017
  end-page: 45
  ident: b46
  article-title: Resource-constrained project scheduling with flexible resource profiles in continuous time
  publication-title: Computers & Operations Research
– volume: 56
  start-page: 370
  year: 1992
  end-page: 379
  ident: b40
  article-title: An iterative scheduling technique for resource-constrained project scheduling
  publication-title: European Journal of Operational Research
– start-page: 452
  year: 2018
  end-page: 456
  ident: b22
  article-title: A continuous-time milp formulation for the multi-mode resource-constrained project scheduling problem
  publication-title: 2018 IEEE international conference on industrial engineering and engineering management (IEEM)
– start-page: 1
  year: 2018
  end-page: 35
  ident: b16
  article-title: Single mode resource constrained project scheduling with unreliable resources
  publication-title: Operational Research
– volume: 57
  start-page: 1265
  year: 2019
  end-page: 1282
  ident: b19
  article-title: A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem
  publication-title: International Journal of Productions Research
– volume: 27
  start-page: 138
  year: 2020
  end-page: 167
  ident: b10
  article-title: Multi-mode resource-constrained project scheduling using modified variable neighborhood search heuristic
  publication-title: International Transactions in Operational Research
– year: 2017
  ident: b69
  article-title: An integrated simulation-genetic algorithm for the stochastic multi-mode resource constrained project scheduling problem
  publication-title: DEStech Transactions on Computer Science and Engineering
– start-page: 375
  year: 2015
  end-page: 386
  ident: b13
  article-title: Event based approaches for solving multi-mode resource constraints project scheduling problem
  publication-title: IFIP international conference on computer information systems and industrial management
– volume: 50
  year: 2019
  ident: b17
  article-title: Evolving rollout-justification based heuristics for resource constrained project scheduling problems
  publication-title: Swarm and Evolutionary Computation
– volume: 5
  start-page: 39
  year: 2018
  end-page: 49
  ident: b63
  article-title: Resource constrained project scheduling with stochastic resources
  publication-title: Journal of Applied Research on Industrial Engineering
– year: 2013
  ident: b1
  article-title: Resource-constrained project scheduling: models, algorithms, extensions and applications
– volume: 129
  start-page: 346
  year: 2019
  end-page: 353
  ident: b23
  article-title: Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem
  publication-title: Computers & Industrial Engineering
– volume: 177
  start-page: 2033
  year: 2007
  end-page: 2049
  ident: b55
  article-title: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
  publication-title: European Journal of Operational Research
– volume: 18
  start-page: 377
  year: 2006
  end-page: 390
  ident: b74
  article-title: A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
  publication-title: INFORMS Journal on Computing
– volume: 278
  start-page: 563
  year: 2019
  end-page: 577
  ident: b7
  article-title: Discrete and continuous-time formulations for dealing with break periods: Preemptive and non-preemptive scheduling
  publication-title: European Journal of Operational Research
– volume: 68
  start-page: 96
  year: 2014
  end-page: 106
  ident: b34
  article-title: New continuous-time and discrete-time mathematical formulations for resource-constrained project scheduling problems
  publication-title: Computers & Chemical Engineering
– volume: 96
  start-page: 205
  year: 1996
  end-page: 216
  ident: b58
  article-title: Psplib—a project scheduling problem library
  publication-title: European Journal of Operational Research
– volume: 18
  start-page: 459
  year: 2009
  end-page: 474
  ident: b5
  article-title: Resource-constrained project scheduling for timely project completion with stochastic activity durations
  publication-title: Production and Operations Management
– volume: 25
  start-page: 701
  year: 2001
  end-page: 711
  ident: b44
  article-title: An milp continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
  publication-title: Computers & Chemical Engineering
– volume: 38
  start-page: 63
  year: 2011
  end-page: 74
  ident: b20
  article-title: Reactive scheduling in the multi-mode rcpsp
  publication-title: Computers & Operations Research
– start-page: 1
  year: 2019
  end-page: 6
  ident: b12
  article-title: An uncertainty tolerant approach for stochastic resource constrained project scheduling problems
  publication-title: 2019 IEEE technology & engineering management conference (TEMSCON)
– start-page: 17
  year: 2015
  end-page: 41
  ident: b2
  article-title: Mixed-integer linear programming formulations
  publication-title: Handbook on project management and scheduling, Vol. 1
– volume: 149
  start-page: 249
  year: 2003
  end-page: 267
  ident: b4
  article-title: Insertion techniques for static and dynamic resource-constrained project scheduling
  publication-title: European Journal of Operational Research
– volume: 54
  start-page: 2610
  year: 2008
  end-page: 2623
  ident: b39
  article-title: Reactive scheduling using parametric programming
  publication-title: AIChE Journal
– volume: 44
  start-page: 714
  year: 1998
  end-page: 729
  ident: b45
  article-title: An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
  publication-title: Management Science
– volume: 23
  start-page: 595
  year: 1999
  end-page: 609
  ident: b28
  article-title: A framework for schedule evaluation with processing uncertainty
  publication-title: Computers & Chemical Engineering
– volume: 19
  start-page: 609
  year: 1995
  end-page: 614
  ident: b29
  article-title: Incorporating on-line scheduling strategies in integrated batch production control
  publication-title: Computers & Chemical Engineering
– volume: 127
  start-page: 394
  year: 2000
  end-page: 407
  ident: b27
  article-title: Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
  publication-title: European Journal of Operational Research
– reference: .
– volume: 130
  start-page: 317
  year: 2019
  end-page: 326
  ident: b60
  article-title: A hybrid multi-objective eda for robust resource constraint project scheduling with uncertainty
  publication-title: Computers & Industrial Engineering
– volume: 30
  start-page: 293
  year: 2018
  end-page: 305
  ident: b72
  article-title: Uncertainty analysis and resource allocation in construction project management
  publication-title: Engineering Management Journal
– start-page: 656
  year: 2018
  end-page: 660
  ident: b8
  article-title: Robust project scheduling with unreliable resources: A variable neighbourhood search based heuristic approach
  publication-title: 2018 IEEE international conference on industrial engineering and engineering management (IEEM)
– volume: 239
  start-page: 335
  year: 2014
  end-page: 348
  ident: b47
  article-title: Mip models for resource-constrained project scheduling with flexible resource profiles
  publication-title: European Journal of Operational Research
– volume: 16
  start-page: 93
  year: 1969
  end-page: 108
  ident: b51
  article-title: Multiproject scheduling with limited resources: A zero–one programming approach
  publication-title: Management Science
– volume: 107
  start-page: 431
  year: 1998
  end-page: 450
  ident: b57
  article-title: Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
  publication-title: European Journal of Operational Research
– volume: 30
  start-page: 609
  year: 2018
  end-page: 639
  ident: b54
  article-title: Mip formulations for an application of project scheduling in human resource management
  publication-title: Flexible Services and Manufacturing Journal
– volume: 52
  start-page: 12 950
  year: 2013
  end-page: 12 972
  ident: b66
  article-title: Rigorous unit-specific event-based model for short-term scheduling of batch plants using conditional sequencing and unit-wait times
  publication-title: Industrial and Engineering Chemistry Research
– volume: 28
  start-page: 1197
  year: 1982
  end-page: 1210
  ident: b59
  article-title: Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
  publication-title: Management Science
– volume: 56
  start-page: 365
  year: 2005
  end-page: 381
  ident: b73
  article-title: Disruption management for resource-constrained project scheduling
  publication-title: The Journal of the Operational Research Society
– start-page: 227
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b15
  article-title: A comparative study of different integer linear programming approaches for resource-constrained project scheduling problems
– start-page: 51
  year: 2020
  ident: 10.1016/j.cie.2020.106981_b48
  article-title: Continuous time milp models for multi-mode resource constrained project scheduling problems
– volume: 5
  start-page: 39
  issue: 1
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b63
  article-title: Resource constrained project scheduling with stochastic resources
  publication-title: Journal of Applied Research on Industrial Engineering
– volume: 96
  start-page: 205
  year: 1996
  ident: 10.1016/j.cie.2020.106981_b58
  article-title: Psplib—a project scheduling problem library
  publication-title: European Journal of Operational Research
– volume: 18
  start-page: 459
  issue: 4
  year: 2009
  ident: 10.1016/j.cie.2020.106981_b5
  article-title: Resource-constrained project scheduling for timely project completion with stochastic activity durations
  publication-title: Production and Operations Management
  doi: 10.1111/j.1937-5956.2009.01023.x
– volume: 131
  start-page: 382
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b43
  article-title: A computational experiment to explore better robustness measures for project scheduling under two types of uncertain environments
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2019.04.014
– volume: 50
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b17
  article-title: Evolving rollout-justification based heuristics for resource constrained project scheduling problems
  publication-title: Swarm and Evolutionary Computation
  doi: 10.1016/j.swevo.2019.07.002
– volume: 27
  start-page: 138
  issue: 1
  year: 2020
  ident: 10.1016/j.cie.2020.106981_b10
  article-title: Multi-mode resource-constrained project scheduling using modified variable neighborhood search heuristic
  publication-title: International Transactions in Operational Research
  doi: 10.1111/itor.12644
– volume: 16
  start-page: 341
  issue: 5
  year: 2000
  ident: 10.1016/j.cie.2020.106981_b50
  article-title: A multi-objective genetic algorithm for solving assembly line balancing problem
  publication-title: International Journal of Advanced Manufacturing Technology
  doi: 10.1007/s001700050166
– volume: 84
  start-page: 33
  year: 2017
  ident: 10.1016/j.cie.2020.106981_b46
  article-title: Resource-constrained project scheduling with flexible resource profiles in continuous time
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2017.02.018
– volume: 140
  year: 2020
  ident: 10.1016/j.cie.2020.106981_b11
  article-title: Efficient priority rules for project scheduling under dynamic environments: A heuristic approach
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2020.106287
– volume: 107
  start-page: 431
  issue: 2
  year: 1998
  ident: 10.1016/j.cie.2020.106981_b57
  article-title: Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(97)00348-2
– volume: 38
  start-page: 54
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b67
  article-title: A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
  publication-title: Swarm and Evolutionary Computation
  doi: 10.1016/j.swevo.2017.06.001
– volume: 49
  start-page: 1719
  issue: 10
  year: 2017
  ident: 10.1016/j.cie.2020.106981_b30
  article-title: Iterated greedy algorithms to minimize the total family flow time for job-shop scheduling with job families and sequence-dependent set-ups
  publication-title: Engineering Optimization
  doi: 10.1080/0305215X.2016.1261247
– volume: 12
  start-page: 565
  issue: 2
  year: 2016
  ident: 10.1016/j.cie.2020.106981_b71
  article-title: Bi-level multiple mode resource-constrained project scheduling problems under hybrid uncertainty
  publication-title: Journal of Industrial & Management Optimization
  doi: 10.3934/jimo.2016.12.565
– volume: 30
  start-page: 609
  issue: 4
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b54
  article-title: Mip formulations for an application of project scheduling in human resource management
  publication-title: Flexible Services and Manufacturing Journal
  doi: 10.1007/s10696-016-9260-8
– volume: 278
  start-page: 563
  issue: 2
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b7
  article-title: Discrete and continuous-time formulations for dealing with break periods: Preemptive and non-preemptive scheduling
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2019.04.025
– volume: 20
  start-page: S1197
  year: 1996
  ident: 10.1016/j.cie.2020.106981_b49
  article-title: A continuous time milp model for short term scheduling of batch plants with pre-ordering constraints
  publication-title: Computers & Chemical Engineering
  doi: 10.1016/0098-1354(96)00207-4
– volume: 130
  start-page: 317
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b60
  article-title: A hybrid multi-objective eda for robust resource constraint project scheduling with uncertainty
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2019.02.039
– start-page: 1
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b16
  article-title: Single mode resource constrained project scheduling with unreliable resources
  publication-title: Operational Research
– volume: 68
  start-page: 96
  year: 2014
  ident: 10.1016/j.cie.2020.106981_b34
  article-title: New continuous-time and discrete-time mathematical formulations for resource-constrained project scheduling problems
  publication-title: Computers & Chemical Engineering
  doi: 10.1016/j.compchemeng.2014.05.009
– start-page: 375
  year: 2015
  ident: 10.1016/j.cie.2020.106981_b13
  article-title: Event based approaches for solving multi-mode resource constraints project scheduling problem
– volume: 177
  start-page: 2033
  issue: 3
  year: 2007
  ident: 10.1016/j.cie.2020.106981_b55
  article-title: A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2005.12.009
– year: 2013
  ident: 10.1016/j.cie.2020.106981_b1
– volume: 38
  start-page: 63
  issue: 1
  year: 2011
  ident: 10.1016/j.cie.2020.106981_b20
  article-title: Reactive scheduling in the multi-mode rcpsp
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2010.01.001
– volume: 111
  year: 2020
  ident: 10.1016/j.cie.2020.106981_b52
  article-title: Memetic algorithm for solving resource constrained project scheduling problems
  publication-title: Automation in Construction
  doi: 10.1016/j.autcon.2019.103052
– volume: 19
  start-page: 409
  issue: 4
  year: 2016
  ident: 10.1016/j.cie.2020.106981_b36
  article-title: A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-015-0423-3
– volume: 38
  start-page: 3
  issue: 1
  year: 2011
  ident: 10.1016/j.cie.2020.106981_b33
  article-title: Event-based milp models for resource-constrained project scheduling problems
  publication-title: Computers & Operations Research
  doi: 10.1016/j.cor.2009.12.011
– volume: 6
  start-page: 39
  issue: 1
  year: 2003
  ident: 10.1016/j.cie.2020.106981_b65
  article-title: Rescheduling manufacturing systems: a framework of strategies, policies, and methods
  publication-title: Journal of Scheduling
  doi: 10.1023/A:1022235519958
– volume: 56
  start-page: 370
  issue: 3
  year: 1992
  ident: 10.1016/j.cie.2020.106981_b40
  article-title: An iterative scheduling technique for resource-constrained project scheduling
  publication-title: European Journal of Operational Research
  doi: 10.1016/0377-2217(92)90320-9
– volume: 28
  start-page: 1197
  issue: 10
  year: 1982
  ident: 10.1016/j.cie.2020.106981_b59
  article-title: Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
  publication-title: Management Science
  doi: 10.1287/mnsc.28.10.1197
– volume: 25
  start-page: 175
  issue: 1–2
  year: 2013
  ident: 10.1016/j.cie.2020.106981_b3
  article-title: Robust optimization for resource-constrained project scheduling with uncertain activity durations
  publication-title: Flexible Services and Manufacturing Journal
  doi: 10.1007/s10696-012-9147-2
– volume: 37
  start-page: 95
  issue: 1
  year: 2007
  ident: 10.1016/j.cie.2020.106981_b61
  article-title: An efficient branch-and-bound algorithm for finding a maximum clique with computational experiments
  publication-title: Journal of Global Optimization
  doi: 10.1007/s10898-006-9039-7
– volume: 3
  start-page: 55
  issue: 2
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b25
  article-title: Resource-constrained project scheduling problem: review of past and recent developments
  publication-title: Journal of Project Management
  doi: 10.5267/j.jpm.2018.1.005
– volume: 54
  start-page: 2101
  issue: 8
  year: 2008
  ident: 10.1016/j.cie.2020.106981_b70
  article-title: The multimode resource constrained multiproject scheduling problem: Alternative formulations
  publication-title: AIChE Journal
  doi: 10.1002/aic.11522
– volume: 129
  start-page: 346
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b23
  article-title: Two continuous-time assignment-based models for the multi-mode resource-constrained project scheduling problem
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2019.01.033
– volume: 56
  start-page: 365
  issue: 4
  year: 2005
  ident: 10.1016/j.cie.2020.106981_b73
  article-title: Disruption management for resource-constrained project scheduling
  publication-title: The Journal of the Operational Research Society
  doi: 10.1057/palgrave.jors.2601860
– volume: 11
  start-page: 121
  issue: 2
  year: 2008
  ident: 10.1016/j.cie.2020.106981_b37
  article-title: Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-007-0021-0
– start-page: 452
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b22
  article-title: A continuous-time milp formulation for the multi-mode resource-constrained project scheduling problem
– volume: 32
  start-page: 283
  issue: 4
  year: 1998
  ident: 10.1016/j.cie.2020.106981_b26
  article-title: Project scheduling with multiple modes: A comparison of exact algorithms
  publication-title: Networks: An International Journal
  doi: 10.1002/(SICI)1097-0037(199812)32:4<283::AID-NET5>3.0.CO;2-I
– volume: 251
  start-page: 387
  issue: 2
  year: 2016
  ident: 10.1016/j.cie.2020.106981_b35
  article-title: Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2015.11.021
– volume: 41
  start-page: 1693
  issue: 10
  year: 1995
  ident: 10.1016/j.cie.2020.106981_b32
  article-title: Characterization and generation of a general class of resource-constrained project scheduling problems
  publication-title: Management Science
  doi: 10.1287/mnsc.41.10.1693
– volume: 8
  start-page: 538
  issue: 4
  year: 1983
  ident: 10.1016/j.cie.2020.106981_b38
  article-title: Integer programming with a fixed number of variables
  publication-title: Mathematics of Operations Research
  doi: 10.1287/moor.8.4.538
– volume: 25
  start-page: 701
  issue: 4–6
  year: 2001
  ident: 10.1016/j.cie.2020.106981_b44
  article-title: An milp continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
  publication-title: Computers & Chemical Engineering
  doi: 10.1016/S0098-1354(01)00671-8
– volume: 54
  start-page: 2610
  issue: 10
  year: 2008
  ident: 10.1016/j.cie.2020.106981_b39
  article-title: Reactive scheduling using parametric programming
  publication-title: AIChE Journal
  doi: 10.1002/aic.11593
– volume: 208
  start-page: 177
  issue: 3
  year: 2011
  ident: 10.1016/j.cie.2020.106981_b68
  article-title: Project scheduling with finite or infinite number of activity processing modes–a survey
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2010.03.037
– volume: 52
  start-page: 12 950
  issue: 36
  year: 2013
  ident: 10.1016/j.cie.2020.106981_b66
  article-title: Rigorous unit-specific event-based model for short-term scheduling of batch plants using conditional sequencing and unit-wait times
  publication-title: Industrial and Engineering Chemistry Research
  doi: 10.1021/ie303294k
– volume: 25
  start-page: 6
  issue: 1–2
  year: 2013
  ident: 10.1016/j.cie.2020.106981_b6
  article-title: A new formulation for the project scheduling problem under limited resources
  publication-title: Flexible Services and Manufacturing Journal
  doi: 10.1007/s10696-011-9127-y
– volume: 16
  start-page: 93
  issue: 1
  year: 1969
  ident: 10.1016/j.cie.2020.106981_b51
  article-title: Multiproject scheduling with limited resources: A zero–one programming approach
  publication-title: Management Science
  doi: 10.1287/mnsc.16.1.93
– volume: 30
  start-page: 293
  issue: 4
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b72
  article-title: Uncertainty analysis and resource allocation in construction project management
  publication-title: Engineering Management Journal
  doi: 10.1080/10429247.2018.1492269
– volume: 19
  start-page: 609
  year: 1995
  ident: 10.1016/j.cie.2020.106981_b29
  article-title: Incorporating on-line scheduling strategies in integrated batch production control
  publication-title: Computers & Chemical Engineering
  doi: 10.1016/0098-1354(95)87102-0
– volume: 239
  start-page: 335
  issue: 2
  year: 2014
  ident: 10.1016/j.cie.2020.106981_b47
  article-title: Mip models for resource-constrained project scheduling with flexible resource profiles
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2014.05.036
– issue: cst
  year: 2017
  ident: 10.1016/j.cie.2020.106981_b69
  article-title: An integrated simulation-genetic algorithm for the stochastic multi-mode resource constrained project scheduling problem
  publication-title: DEStech Transactions on Computer Science and Engineering
– volume: 35
  start-page: 431
  year: 2013
  ident: 10.1016/j.cie.2020.106981_b42
  article-title: Ant colony optimization-based multi-mode scheduling under renewable and nonrenewable resource constraints
  publication-title: Automation in Construction
  doi: 10.1016/j.autcon.2013.05.030
– volume: 44
  start-page: 714
  issue: 5
  year: 1998
  ident: 10.1016/j.cie.2020.106981_b45
  article-title: An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
  publication-title: Management Science
  doi: 10.1287/mnsc.44.5.714
– start-page: 17
  year: 2015
  ident: 10.1016/j.cie.2020.106981_b2
  article-title: Mixed-integer linear programming formulations
– volume: 112
  start-page: 537
  year: 2017
  ident: 10.1016/j.cie.2020.106981_b14
  article-title: Resource constrained project scheduling with uncertain activity durations
  publication-title: Computers & Industrial Engineering
  doi: 10.1016/j.cie.2016.12.040
– start-page: 1
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b12
  article-title: An uncertainty tolerant approach for stochastic resource constrained project scheduling problems
– volume: 23
  start-page: 595
  issue: 4–5
  year: 1999
  ident: 10.1016/j.cie.2020.106981_b28
  article-title: A framework for schedule evaluation with processing uncertainty
  publication-title: Computers & Chemical Engineering
  doi: 10.1016/S0098-1354(98)00296-8
– year: 2019
  ident: 10.1016/j.cie.2020.106981_b53
  article-title: Scheduling automated transport vehicles for material distribution systems
  publication-title: Applied Soft Computing
  doi: 10.1016/j.asoc.2019.105552
– volume: 102
  start-page: 65
  issue: 1–4
  year: 2001
  ident: 10.1016/j.cie.2020.106981_b62
  article-title: A competitive heuristic solution technique for resource-constrained project scheduling
  publication-title: Annals of Operations Research
  doi: 10.1023/A:1010997814183
– volume: 246
  start-page: 20
  issue: 1
  year: 2015
  ident: 10.1016/j.cie.2020.106981_b41
  article-title: Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2015.04.015
– volume: 18
  start-page: 377
  issue: 3
  year: 2006
  ident: 10.1016/j.cie.2020.106981_b74
  article-title: A branch-and-cut procedure for the multimode resource-constrained project-scheduling problem
  publication-title: INFORMS Journal on Computing
  doi: 10.1287/ijoc.1040.0121
– volume: 57
  start-page: 1265
  issue: 4
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b19
  article-title: A novel branch-and-bound algorithm for the chance-constrained resource-constrained project scheduling problem
  publication-title: International Journal of Productions Research
  doi: 10.1080/00207543.2018.1504245
– volume: 127
  start-page: 394
  issue: 2
  year: 2000
  ident: 10.1016/j.cie.2020.106981_b27
  article-title: Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(99)00485-3
– volume: 5
  start-page: 133
  issue: 2
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b64
  article-title: Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges
  publication-title: Frontiers of Engineering Management
– ident: 10.1016/j.cie.2020.106981_b56
– volume: 149
  start-page: 249
  issue: 2
  year: 2003
  ident: 10.1016/j.cie.2020.106981_b4
  article-title: Insertion techniques for static and dynamic resource-constrained project scheduling
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(02)00758-0
– start-page: 432
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b24
  article-title: A continuous-time unit-based milp formulation for the resource-constrained project scheduling problem
– start-page: 656
  year: 2018
  ident: 10.1016/j.cie.2020.106981_b8
  article-title: Robust project scheduling with unreliable resources: A variable neighbourhood search based heuristic approach
– start-page: 1
  year: 2019
  ident: 10.1016/j.cie.2020.106981_b9
  article-title: A risk assessment framework for scheduling projects with resource and duration uncertainties
  publication-title: IEEE Transactions on Engineering Management
– volume: 29
  start-page: 249
  issue: 3
  year: 2001
  ident: 10.1016/j.cie.2020.106981_b31
  article-title: An integrated survey of deterministic project scheduling
  publication-title: Omega
  doi: 10.1016/S0305-0483(00)00046-3
– volume: 28
  start-page: 2109
  issue: 11
  year: 2004
  ident: 10.1016/j.cie.2020.106981_b21
  article-title: Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
  publication-title: Computers & Chemical Engineering
  doi: 10.1016/j.compchemeng.2004.05.002
– year: 2018
  ident: 10.1016/j.cie.2020.106981_b18
SSID ssj0004591
Score 2.4305031
Snippet The Resource Constrained Project Scheduling Problem (RCPSP) is a combinatorial optimization problem which is non-deterministic polynomial-time (NP)-hard in...
SourceID crossref
elsevier
SourceType Enrichment Source
Index Database
Publisher
StartPage 106981
SubjectTerms Disruptions
Enhanced iterated greedy
Event-based rescheduling
Meta-heuristic approach
Mixed integer linear programming
Resource Constrained Project Scheduling
Title An event-based reactive scheduling approach for the Resource Constrained Project Scheduling Problem with unreliable resources
URI https://dx.doi.org/10.1016/j.cie.2020.106981
Volume 151
WOSCitedRecordID wos000632959400050&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection Journals 2021
  customDbUrl:
  eissn: 1879-0550
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0004591
  issn: 0360-8352
  databaseCode: AIEXJ
  dateStart: 19950101
  isFulltext: true
  titleUrlDefault: https://www.sciencedirect.com
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1La9tAEF6M00N76CNtSZq07KGnmjWSVqvdPYqSkLYQQpuCb2IlrYmNUYwfITn0V_UPZvYlCfdBW-hFmMVjyZ7PM7OzM_Mh9FYqqcBLMUIFq0ga14qoNFKknCpwJ0ILXUeWbIKfn4vJRF4MBt9DL8zNgjeNuL2Vy_-qalgDZZvW2b9Qd_uhsACvQelwBbXD9Y8UnzcjO5WJGAdlelOUNWkj2MaCW7Hd52GQeFtjGJL4lr_TskZo20NgkjRmUGcQvHD0My57u4UHWMxs69XKy6_7sW4gjFhbeM06jhDdzUDcqS6AvYAjKfg8WwIsP427Y6grn6oF_N1tm9HpVtWd9QTnZi3WlTl6GuetmKl7dHnvZn59N7L15P08RxLv5DnaBpyu2sk1fUXEBJHOnTkbLrgkEXPzbFsj78ba_uAwXO5iPgZDOoa7mpVMOhKZnTncX8y9bLxqtlnMMCXvJZxJMUR7-YeTycfekHpH1BieLRym27LCnRv9PBzqhTiXT9FjvzfBucPUMzTQzT564vcp2HuB9T561Bti-Rx9yxvcAxwOgMMd4HAAHAbAYQAcDoDDPcBhDzjcAQ57wGEDONwBDreAe4G-np5cvj8jntSDVInkG0KrWpVUZnWsZVYmaqpoMo1jXmU605zXNU0rJWsmaRwrqVkldSJ1lJRMZ7EoNX2Jhs11ow8QZpkGT51ClKeylE9LoWohqEppRmFFsEMUhd-2qPzEe_ONFkUobZzDui6MOgqnjkP0rhVZunEvv3tzGhRW-HjVxaEFoOvXYq_-TewIPez-FsdouFlt9Wv0oLrZzNarNx6D98sMvuE
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=An+event-based+reactive+scheduling+approach+for+the+Resource+Constrained+Project+Scheduling+Problem+with+unreliable+resources&rft.jtitle=Computers+%26+industrial+engineering&rft.au=Chakrabortty%2C+Ripon+K.&rft.au=Rahman%2C+Humyun+Fuad&rft.au=Haque%2C+Khan+M.A.&rft.au=Paul%2C+Sanjoy+Kumar&rft.date=2021-01-01&rft.pub=Elsevier+Ltd&rft.issn=0360-8352&rft.eissn=1879-0550&rft.volume=151&rft_id=info:doi/10.1016%2Fj.cie.2020.106981&rft.externalDocID=S0360835220306513
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0360-8352&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0360-8352&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0360-8352&client=summon