Maximizing the weighted number of just‐in‐time jobs in a distributed flow‐shop scheduling system

We study a set of scheduling problems in a distributed flow‐shop scheduling system consisting of several flow‐shop production systems (factories) working in parallel. Our objective is to assign the jobs to the factories, and to devise a job schedule for each of the factories such that the weighted n...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Naval research logistics Jg. 70; H. 3; S. 274 - 283
1. Verfasser: Shabtay, Dvir
Format: Journal Article
Sprache:Englisch
Veröffentlicht: Hoboken, USA John Wiley & Sons, Inc 01.04.2023
Wiley Subscription Services, Inc
Schlagworte:
ISSN:0894-069X, 1520-6750
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:We study a set of scheduling problems in a distributed flow‐shop scheduling system consisting of several flow‐shop production systems (factories) working in parallel. Our objective is to assign the jobs to the factories, and to devise a job schedule for each of the factories such that the weighted number of jobs completed in just‐in‐time mode is maximized. We classify computational complexity of the problems, including the special cases of unit weights and job‐ or machine‐independent processing times.
Bibliographie:History
Accepted by Marc Posner, project management and scheduling.
ObjectType-Article-1
SourceType-Scholarly Journals-1
ObjectType-Feature-2
content type line 14
ISSN:0894-069X
1520-6750
DOI:10.1002/nav.22097