Exact and Hybrid Metaheuristic Algorithms to Solve Bi-Objective Permutation Flow Shop Scheduling Problem
In this paper, we consider 2-machine permutation flow shop scheduling problem with bi-objective of minimizing the makespan ( C max ) and maximum tardiness ( T max ). The aim is to minimize the two objective functions lexicographicaly, which is minimize maximum tardiness subject to that the makespan...
Uloženo v:
| Vydáno v: | Journal of physics. Conference series Ročník 1818; číslo 1; s. 12042 |
|---|---|
| Hlavní autor: | |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Bristol
IOP Publishing
01.03.2021
|
| Témata: | |
| ISSN: | 1742-6588, 1742-6596 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | In this paper, we consider 2-machine permutation flow shop scheduling problem with bi-objective of minimizing the makespan (
C
max
) and maximum tardiness (
T
max
). The aim is to minimize the two objective functions lexicographicaly, which is minimize maximum tardiness subject to that the makespan is optimal. We introduce a Branch and bound algorithm with two dominance conditions to find the optimal solution of the problem for job sequence with up to 14 jobs. For moderate and large sized problems we apply a simulated annealing algorithm to develop a metaheuristic algorithme based on the first level branch and bound and variable neighborhood search. To compare with the original algorithm, numerical experiments provided, the rusults shows the efficiency of the dominance conditions also the efficiency of proposed modification of the original metaheuristic algorithm. |
|---|---|
| Bibliografie: | ObjectType-Conference Proceeding-1 SourceType-Scholarly Journals-1 content type line 14 |
| ISSN: | 1742-6588 1742-6596 |
| DOI: | 10.1088/1742-6596/1818/1/012042 |