Zhang, W., Shi, J., Zhang, S., & Chen, M. (2023). Scenario-Based Robust Remanufacturing Scheduling Problem Using Improved Biogeography-Based Optimization Algorithm. IEEE transactions on systems, man, and cybernetics. Systems, 53(6), 1-14. https://doi.org/10.1109/TSMC.2022.3225443
Citace podle Chicago (17th ed.)Zhang, Wenyu, Jiaxuan Shi, Shuai Zhang, a Mengjiao Chen. "Scenario-Based Robust Remanufacturing Scheduling Problem Using Improved Biogeography-Based Optimization Algorithm." IEEE Transactions on Systems, Man, and Cybernetics. Systems 53, no. 6 (2023): 1-14. https://doi.org/10.1109/TSMC.2022.3225443.
Citace podle MLA (9th ed.)Zhang, Wenyu, et al. "Scenario-Based Robust Remanufacturing Scheduling Problem Using Improved Biogeography-Based Optimization Algorithm." IEEE Transactions on Systems, Man, and Cybernetics. Systems, vol. 53, no. 6, 2023, pp. 1-14, https://doi.org/10.1109/TSMC.2022.3225443.