Hooker, J. N. (2005). A Hybrid Method for the Planning and Scheduling. Constraints (Dordrecht), 10(4), 385-401. https://doi.org/10.1007/s10601-005-2812-2
Chicago Style (17th ed.) CitationHooker, J. N. "A Hybrid Method for the Planning and Scheduling." Constraints (Dordrecht) 10, no. 4 (2005): 385-401. https://doi.org/10.1007/s10601-005-2812-2.
MLA (9th ed.) CitationHooker, J. N. "A Hybrid Method for the Planning and Scheduling." Constraints (Dordrecht), vol. 10, no. 4, 2005, pp. 385-401, https://doi.org/10.1007/s10601-005-2812-2.
Warning: These citations may not always be 100% accurate.