APA (7th ed.) Citation

Liu, L., Gu, H., & Xi, Y. (2007). Robust and stable scheduling of a single machine with random machine breakdowns. International journal of advanced manufacturing technology, 31(7-8), 645-654. https://doi.org/10.1007/s00170-005-0237-0

Chicago Style (17th ed.) Citation

Liu, Lin, Han-yu Gu, and Yu-geng Xi. "Robust and Stable Scheduling of a Single Machine with Random Machine Breakdowns." International Journal of Advanced Manufacturing Technology 31, no. 7-8 (2007): 645-654. https://doi.org/10.1007/s00170-005-0237-0.

MLA (9th ed.) Citation

Liu, Lin, et al. "Robust and Stable Scheduling of a Single Machine with Random Machine Breakdowns." International Journal of Advanced Manufacturing Technology, vol. 31, no. 7-8, 2007, pp. 645-654, https://doi.org/10.1007/s00170-005-0237-0.

Warning: These citations may not always be 100% accurate.