Complexity analysis and approximation algorithms for the single-machine scheduling problem with workload-dependent maintenance activities
This paper considers the single-machine scheduling problem with workload-dependent maintenance activities of variable length. The time needed to perform a maintenance activity is a function of the total processing time of the jobs that are processed between the starting time of this activity and the...
Gespeichert in:
| Veröffentlicht in: | Journal of scheduling Jg. 28; H. 4; S. 391 - 406 |
|---|---|
| Hauptverfasser: | , , |
| Format: | Journal Article |
| Sprache: | Englisch |
| Veröffentlicht: |
New York
Springer US
01.08.2025
Springer Nature B.V |
| Schlagworte: | |
| ISSN: | 1094-6136, 1099-1425 |
| Online-Zugang: | Volltext |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
| Zusammenfassung: | This paper considers the single-machine scheduling problem with workload-dependent maintenance activities of variable length. The time needed to perform a maintenance activity is a function of the total processing time of the jobs that are processed between the starting time of this activity and the end of the last previous activity. In the case where the function is concave, we study the computational complexity of the three problems with the goal of minimizing the makespan, the total completion time, and the total weighted completion time, respectively. In addition, we propose a 2-approximation algorithm for the first problem and a 2.5-approximation algorithm for the second problem. |
|---|---|
| Bibliographie: | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| ISSN: | 1094-6136 1099-1425 |
| DOI: | 10.1007/s10951-025-00842-3 |