Strategic Long-Term Planning for Sublevel Caving: A Unified Mixed-Integer-Linear Programming Framework for Development, Ventilation, Production Scheduling, and Stockpile Management

In typical underground mine planning models, development activities and the downstream flow of materials are treated as distinct operations from ore extraction sequencing. Sublevel caving (SLC) includes development, stockpiling, and production, each occurring independently on different levels. To im...

Celý popis

Uložené v:
Podrobná bibliografia
Vydané v:Mining, metallurgy & exploration Ročník 42; číslo 3; s. 1741 - 1757
Hlavní autori: Khazaei, Soroush, Mousavi, Amin, Pourrahimian, Yashar
Médium: Journal Article
Jazyk:English
Vydavateľské údaje: Cham Springer International Publishing 01.06.2025
Predmet:
ISSN:2524-3462, 2524-3470
On-line prístup:Získať plný text
Tagy: Pridať tag
Žiadne tagy, Buďte prvý, kto otaguje tento záznam!
Abstract In typical underground mine planning models, development activities and the downstream flow of materials are treated as distinct operations from ore extraction sequencing. Sublevel caving (SLC) includes development, stockpiling, and production, each occurring independently on different levels. To improve planning efficiency, it is crucial to integrate these simultaneous activities into a holistic model. However, most studies on SLC scheduling primarily focus on ore extraction sequencing, often neglecting the interplay between different activities. This study addresses the gap by introducing an integrated mixed-integer linear programming (MILP) framework, implemented in Python using PuLP and CPLEX, to optimize production, development, and control material flow between the mine, plant, and stockpile. The model aims to maximize net present value (NPV) while accounting for key operational constraints, including development activities, mining and processing capacities, continuous mining, limits on active and newly added mining units (MUs), grade control, sequencing precedences, and stockpile management. It schedules MUs across production areas and levels and optimizes material flow by prioritizing direct transfer from the mine to the plant to avoid rehandling costs while ensuring the plant’s average head grade remains within limits. The proposed framework was verified through an optimization process and applied to a real-world SLC iron mine with 367 MUs over 23 periods, demonstrating the practicality of the integrated model. By accounting for mining direction and all SLC constraints, including operational limitations, the model achieved an NPV of 1.94 B$.
AbstractList In typical underground mine planning models, development activities and the downstream flow of materials are treated as distinct operations from ore extraction sequencing. Sublevel caving (SLC) includes development, stockpiling, and production, each occurring independently on different levels. To improve planning efficiency, it is crucial to integrate these simultaneous activities into a holistic model. However, most studies on SLC scheduling primarily focus on ore extraction sequencing, often neglecting the interplay between different activities. This study addresses the gap by introducing an integrated mixed-integer linear programming (MILP) framework, implemented in Python using PuLP and CPLEX, to optimize production, development, and control material flow between the mine, plant, and stockpile. The model aims to maximize net present value (NPV) while accounting for key operational constraints, including development activities, mining and processing capacities, continuous mining, limits on active and newly added mining units (MUs), grade control, sequencing precedences, and stockpile management. It schedules MUs across production areas and levels and optimizes material flow by prioritizing direct transfer from the mine to the plant to avoid rehandling costs while ensuring the plant’s average head grade remains within limits. The proposed framework was verified through an optimization process and applied to a real-world SLC iron mine with 367 MUs over 23 periods, demonstrating the practicality of the integrated model. By accounting for mining direction and all SLC constraints, including operational limitations, the model achieved an NPV of 1.94 B$.
Author Pourrahimian, Yashar
Mousavi, Amin
Khazaei, Soroush
Author_xml – sequence: 1
  givenname: Soroush
  orcidid: 0000-0003-4311-5927
  surname: Khazaei
  fullname: Khazaei, Soroush
  email: skhazaei@ualberta.ca
  organization: School of Mining and Petroleum Engineering, University of Alberta
– sequence: 2
  givenname: Amin
  orcidid: 0000-0002-5436-696X
  surname: Mousavi
  fullname: Mousavi, Amin
  organization: Faculty of Engineering, Tarbiat Modarres University
– sequence: 3
  givenname: Yashar
  orcidid: 0000-0002-3230-9593
  surname: Pourrahimian
  fullname: Pourrahimian, Yashar
  organization: School of Mining and Petroleum Engineering, University of Alberta
BookMark eNp9kMlOwzAURS0EElN_gJU_oAYPGdmhMkqpqJSWbeTEL8GQ2JWTAv0vPhCnRSzZ-F3ZPldP5xQdGmsAoQtGLxml8VUf8CBihPKQUMZFSLYH6ISHPCAiiOnhX474MZr0vS5pwBmjcSBO0Hc-ODlAoyucWdOQJbgOL1ppjDYNrq3D-aZs4QNaPJMf_u4a3-CV0bUGhef6CxR5Mp4HRzJtQDq8cLZxsutG_t4H-LTufdd0O9bYdQdmmOIXf-pWDtqa6cioTTVmnFevoDatp6dYGoXzwVbva90CnksjGxjpc3RUy7aHye88Q6v7u-XskWTPD0-zm4xUPGYDCagoFYQiBSh5xOpEyDRK0zKBKAZI_FMUpnEkkjJRFYSBYolMqRBURZRXaS3OEN_3Vs72vYO6WDvdSbctGC1G9cVefeHVFzv1xdZDYg_1_rPxYoo3u3HG7_kf9QNzcYz0
Cites_doi 10.1023/A:1024835022186
10.1287/inte.2014.0737
10.1007/978-3-662-65481-1_2
10.1016/j.resourpol.2020.101700
10.1016/j.resourpol.2023.103885
10.1080/25726668.2020.1775432
10.3390/mining1020012
10.1016/j.resourpol.2022.102918
10.1016/j.ejor.2016.12.014
10.1016/j.cor.2019.02.001
10.1080/13895260500258661
10.1007/s11081-012-9186-2
10.1080/25726668.2023.2182285
10.1007/s42461-023-00903-1
10.1007/978-3-030-27045-2
10.1287/inte.1030.0059
10.1007/s42461-023-00843-w
10.1007/s42461-021-00483-y
10.1016/j.resourpol.2020.101586
10.1016/j.ijmst.2014.05.006
10.1016/j.ejor.2010.12.008
10.1016/j.jpowsour.2020.227948
10.1179/037178410X12633834652411
10.1080/25726668.2018.1563742
10.1201/9780203747124-36
10.1016/j.resourpol.2021.102016
10.1016/j.ejor.2005.09.008
10.1007/s11771-014-2190-2
10.1016/j.resourpol.2020.101809
ContentType Journal Article
Copyright Society for Mining, Metallurgy & Exploration Inc. 2025 Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
Copyright_xml – notice: Society for Mining, Metallurgy & Exploration Inc. 2025 Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.
DBID AAYXX
CITATION
DOI 10.1007/s42461-025-01235-y
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
EISSN 2524-3470
EndPage 1757
ExternalDocumentID 10_1007_s42461_025_01235_y
GrantInformation_xml – fundername: Natural Sciences and Engineering Research Council of Canada
  grantid: RGPIN 202203276
  funderid: http://dx.doi.org/10.13039/501100000038
GroupedDBID 0R~
406
7RQ
7WY
883
88I
8AF
8FE
8FG
8FL
8FW
AACDK
AAEWM
AAHNG
AAJBT
AASML
AATNV
AAUYE
ABAKF
ABBRH
ABDBE
ABECU
ABFTV
ABJCF
ABKCH
ABMQK
ABTEG
ABTKH
ABTMW
ABUWG
ABXPI
ACAOD
ACDTI
ACHSB
ACMLO
ACOKC
ACPIV
ACZOJ
ADKNI
ADTPH
ADURQ
ADYFF
AEFQL
AEJRE
AEMSY
AESKC
AFDZB
AFKRA
AFOHR
AFQWF
AGDGC
AGJBK
AGMZJ
AGQEE
AHPBZ
AIGIU
AILAN
AITGF
AJZVZ
ALMA_UNASSIGNED_HOLDINGS
AMKLP
AMXSW
AMYLF
ATHPR
AXYYD
AYFIA
AZQEC
BENPR
BEZIV
BGLVJ
BGNMA
BPHCQ
CCPQU
CSCUP
D1I
DPUIP
DWQXO
EBLON
EBS
EJD
FIGPU
FINBP
FNLPD
FRNLG
FSGXE
GGCAI
GNUQQ
HCIFZ
IKXTQ
IWAJR
JZLTJ
K60
K6~
KB.
KOV
LLZTM
M0F
M2P
M2Q
M4Y
NPVJJ
NQJWS
NU0
PDBOC
PHGZM
PHGZT
PMFND
PQBIZ
PQBZA
PQQKQ
PROAC
PT4
ROL
RSV
S0X
SCLPG
SCV
SJYHP
SNE
SNPRN
SOHCF
SOJ
SRMVM
SSLCW
STPWE
TSG
UOJIU
UTJUX
VEKWB
VFIZW
ZMTXR
AAYXX
ABRTQ
AEUYN
AFFHD
BHPHI
BKSAR
CITATION
M0C
PCBAR
PQGLB
ID FETCH-LOGICAL-c271t-403bde539eeb261f83a9699b8e67ee8de56597638b8dce54d18a90330d602c9f3
IEDL.DBID RSV
ISICitedReferencesCount 0
ISICitedReferencesURI http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=001489289500001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
ISSN 2524-3462
IngestDate Sat Nov 29 07:50:33 EST 2025
Thu Jun 12 01:45:10 EDT 2025
IsPeerReviewed true
IsScholarly true
Issue 3
Keywords Long-term mine planning
GEMS PCSLC
Mixed-integer-linear-programming
Sublevel caving
Language English
LinkModel DirectLink
MergedId FETCHMERGED-LOGICAL-c271t-403bde539eeb261f83a9699b8e67ee8de56597638b8dce54d18a90330d602c9f3
ORCID 0000-0003-4311-5927
0000-0002-3230-9593
0000-0002-5436-696X
PageCount 17
ParticipantIDs crossref_primary_10_1007_s42461_025_01235_y
springer_journals_10_1007_s42461_025_01235_y
PublicationCentury 2000
PublicationDate 20250600
2025-06-00
PublicationDateYYYYMMDD 2025-06-01
PublicationDate_xml – month: 6
  year: 2025
  text: 20250600
PublicationDecade 2020
PublicationPlace Cham
PublicationPlace_xml – name: Cham
PublicationSubtitle An Official International Peer-reviewed Journal of the Society
PublicationTitle Mining, metallurgy & exploration
PublicationTitleAbbrev Mining, Metallurgy & Exploration
PublicationYear 2025
Publisher Springer International Publishing
Publisher_xml – name: Springer International Publishing
References AAK Danish (1235_CR7) 2021; 71
1235_CR6
1235_CR5
M Asad (1235_CR27) 2005; 19
S Esmailzadeh (1235_CR14) 2023; 85
1235_CR3
G Shekhar (1235_CR4) 2020; 129
S Khazaei (1235_CR24) 2021; 1
M Kuchta (1235_CR23) 2003; 55
1235_CR22
AM Morad (1235_CR35) 2014; 21
AM Newman (1235_CR21) 2011; 211
J Everett (1235_CR9) 2010; 119
AM Newman (1235_CR20) 2007; 176
SA MirHassani (1235_CR10) 2019
F Sotoudeh (1235_CR15) 2023; 40
R Noriega (1235_CR11) 2020; 65
ML Smith (1235_CR30) 2014; 44
EJA Appianing (1235_CR34) 2023; 132
M Kuchta (1235_CR19) 2004; 34
ML Smith (1235_CR25) 1999; 92
L Caccetta (1235_CR26) 2003; 27
AS Khaboushan (1235_CR1) 2020; 68
1235_CR17
1235_CR16
1235_CR18
Y Feng (1235_CR8) 2020; 454
1235_CR13
1235_CR36
1235_CR31
E Moreno (1235_CR32) 2017; 260
M Rezakhah (1235_CR33) 2020; 115
B Koushavand (1235_CR29) 2014; 24
F Sotoudeh (1235_CR12) 2020; 68
F Khodayari (1235_CR2) 2019; 128
S Ramazan (1235_CR28) 2013; 14
References_xml – volume: 27
  start-page: 349
  year: 2003
  ident: 1235_CR26
  publication-title: In Journal ofGlobal Optimization
  doi: 10.1023/A:1024835022186
– ident: 1235_CR17
– volume: 44
  start-page: 176
  issue: 2
  year: 2014
  ident: 1235_CR30
  publication-title: Interfaces
  doi: 10.1287/inte.2014.0737
– ident: 1235_CR36
  doi: 10.1007/978-3-662-65481-1_2
– volume: 68
  start-page: 101700
  year: 2020
  ident: 1235_CR1
  publication-title: Resour Policy
  doi: 10.1016/j.resourpol.2020.101700
– volume: 85
  start-page: 103885
  year: 2023
  ident: 1235_CR14
  publication-title: Resour Policy
  doi: 10.1016/j.resourpol.2023.103885
– ident: 1235_CR3
– volume: 129
  start-page: 104
  issue: 2
  year: 2020
  ident: 1235_CR4
  publication-title: Min Technol
  doi: 10.1080/25726668.2020.1775432
– volume: 1
  start-page: 180
  issue: 2
  year: 2021
  ident: 1235_CR24
  publication-title: Mining
  doi: 10.3390/mining1020012
– ident: 1235_CR13
  doi: 10.1016/j.resourpol.2022.102918
– volume: 260
  start-page: 212
  issue: 1
  year: 2017
  ident: 1235_CR32
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2016.12.014
– volume: 115
  start-page: 104638
  year: 2020
  ident: 1235_CR33
  publication-title: Comput Oper Res
  doi: 10.1016/j.cor.2019.02.001
– volume: 19
  start-page: 176
  year: 2005
  ident: 1235_CR27
  publication-title: Int J Surf Min Reclam Environ
  doi: 10.1080/13895260500258661
– volume: 55
  start-page: 35
  issue: 4
  year: 2003
  ident: 1235_CR23
  publication-title: Mining Engineering
– volume: 14
  start-page: 361
  issue: 2
  year: 2013
  ident: 1235_CR28
  publication-title: Optim Eng
  doi: 10.1007/s11081-012-9186-2
– volume: 132
  start-page: 106
  issue: 2
  year: 2023
  ident: 1235_CR34
  publication-title: Min Technol
  doi: 10.1080/25726668.2023.2182285
– ident: 1235_CR16
– ident: 1235_CR5
  doi: 10.1007/s42461-023-00903-1
– volume-title: Methods and models in mathematical programming
  year: 2019
  ident: 1235_CR10
  doi: 10.1007/978-3-030-27045-2
– volume: 34
  start-page: 124
  issue: 2
  year: 2004
  ident: 1235_CR19
  publication-title: Interfaces
  doi: 10.1287/inte.1030.0059
– volume: 40
  start-page: 2255
  issue: 6
  year: 2023
  ident: 1235_CR15
  publication-title: Mining, Metallurgy Exploration
  doi: 10.1007/s42461-023-00843-w
– ident: 1235_CR6
  doi: 10.1007/s42461-021-00483-y
– volume: 65
  start-page: 101586
  year: 2020
  ident: 1235_CR11
  publication-title: Resour Policy
  doi: 10.1016/j.resourpol.2020.101586
– volume: 24
  start-page: 451
  issue: 4
  year: 2014
  ident: 1235_CR29
  publication-title: Int J Min Sci Technol
  doi: 10.1016/j.ijmst.2014.05.006
– ident: 1235_CR31
– volume: 211
  start-page: 184
  year: 2011
  ident: 1235_CR21
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2010.12.008
– volume: 454
  start-page: 227948
  year: 2020
  ident: 1235_CR8
  publication-title: J Power Sources
  doi: 10.1016/j.jpowsour.2020.227948
– volume: 119
  start-page: 22
  issue: 1
  year: 2010
  ident: 1235_CR9
  publication-title: Min Technol
  doi: 10.1179/037178410X12633834652411
– volume: 128
  start-page: 65
  issue: 2
  year: 2019
  ident: 1235_CR2
  publication-title: Min Technol
  doi: 10.1080/25726668.2018.1563742
– ident: 1235_CR18
  doi: 10.1201/9780203747124-36
– volume: 71
  start-page: 102016
  year: 2021
  ident: 1235_CR7
  publication-title: Resour Policy
  doi: 10.1016/j.resourpol.2021.102016
– volume: 92
  start-page: 61
  issue: 1030
  year: 1999
  ident: 1235_CR25
  publication-title: CIM Bull
– volume: 176
  start-page: 1205
  issue: 2
  year: 2007
  ident: 1235_CR20
  publication-title: Eur J Oper Res
  doi: 10.1016/j.ejor.2005.09.008
– ident: 1235_CR22
– volume: 21
  start-page: 2372
  issue: 6
  year: 2014
  ident: 1235_CR35
  publication-title: J Central South Univ
  doi: 10.1007/s11771-014-2190-2
– volume: 68
  start-page: 101809
  year: 2020
  ident: 1235_CR12
  publication-title: Resour Policy
  doi: 10.1016/j.resourpol.2020.101809
SSID ssib042110743
ssj0002144478
Score 2.293051
Snippet In typical underground mine planning models, development activities and the downstream flow of materials are treated as distinct operations from ore extraction...
SourceID crossref
springer
SourceType Index Database
Publisher
StartPage 1741
SubjectTerms Engineering
Materials Engineering
Metallic Materials
Mineral Resources
Title Strategic Long-Term Planning for Sublevel Caving: A Unified Mixed-Integer-Linear Programming Framework for Development, Ventilation, Production Scheduling, and Stockpile Management
URI https://link.springer.com/article/10.1007/s42461-025-01235-y
Volume 42
WOSCitedRecordID wos001489289500001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVAVX
  databaseName: SpringerLink
  customDbUrl:
  eissn: 2524-3470
  dateEnd: 99991231
  omitProxy: false
  ssIdentifier: ssj0002144478
  issn: 2524-3462
  databaseCode: RSV
  dateStart: 20190101
  isFulltext: true
  titleUrlDefault: https://link.springer.com/search?facet-content-type=%22Journal%22
  providerName: Springer Nature
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1NSwMxEA1aPejBb7F-kYM3G9jNZtPEWykWD1oKraW3ZZtkS0G3pV3F_i9_oJPsbm1BBD1vEhYmmcybvHmD0E2YJL4vtSEqpJww6ikSS0ApwggLiCQ1XLlmE_V2WwwGslMUhc1Ltnv5JOk89bLYjVnpM2Lbr7oCT7LYRFuhVZuxGL3bL3cRc5CmEJmy_tiKgjHnkmlIGQkYp0X1zM_Lrt9Q68-j7tZp7f_vfw_QXhFl4ka-LQ7RhkmP0O6K9uAx-ix1aRV-nKQj0gMXjcsWRhhCWQw-5cVSinAztlmHO9zAEKEmELPip_GH0cRmE21OEPAsnBfcyaler3Z-q-R8uZVWmEk13Lf8pJyBV7NzdK5fi7uwfbTlxY9qOE417mbgqqfgtPA3RecEPbfue80HUrRwIIrW_QzQaTDUJgykAQTP_UQEseRSDoXhdWMEfOKAaMAHDIVWJmTaF7H0gsDT3KNKJsEpqqST1JwhLBPlq5hx43uaScMkT8QQoslYS7g8hKmi29Js0TRX6oiWmszOFhHYInK2iBZVVCutFhWndv7L8PO_Db9AO9QZ3mZrLlElm72ZK7St3rPxfHbttusXRibm8Q
linkProvider Springer Nature
linkToHtml http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1bS8MwFA7eQH3wLt7Ng2820KZplvgm4pi4jcHm2FvpknQMtBNXRf-XP9CTtFUHIuhzk1A4J1_OSb7zHYTOojQNAqkNURHlhFFfkURCliKMsAmRpIYr12yi1m6LwUB2yqKwacV2r54kHVJ_FrsxK31GbPtVV-BJ3ubRIrNtdmyO3u1XXsRcSlOKTFk8tqJgzEEyjSgjIeO0rJ75ednZE2r2edSdOvX1__3vBloro0x8WbjFJpoz2RZa_aY9uI3eK11ahZuTbER6ANG4amGEIZTFgCn3llKErxJ763CBLzFEqCnErLg1fjWa2NtEeycI-SzsF9wpqF4Pdn694ny5lb4xkzzct_ykgoHn2Tm60K_FXXAfbXnxIw8nmcbdHKD6EUALf1F0dtBd_bp31SBlCweiaC3IITsNh9pEoTSQwfMgFWEiuZRDYXjNGAGfOGQ0gAFDoZWJmA5EIv0w9DX3qZJpuIsWsklm9hCWqQpUwrgJfM2kYZKnYgjRZKIlHB7C7KPzymzxY6HUEX9qMjtbxGCL2NkifttHXmW1uNy101-GH_xt-ClabvRazbh50749RCvUOYG9uTlCC_nTszlGS-olH0-fTpzrfgAhsunV
linkToPdf http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV1dS8MwFA06RfTBb3F-5sE3F2zTNEt8E3UozjGcjr2VLklF0DpcFfe__IHepO2cIIL43CQU7s3NPcm55yJ0ECaJ70ttiAopJ4x6isQSUIowwgIiSQ1XrtlEvdUSvZ5sT1TxO7Z7-SSZ1zRYlaY0Oxro5Ghc-MasDBqxrVhdsScZTaMZBkjGkrpuOt3So5iDN4XglI3NViCMufBMQ8pIwDgtKml-Xvb7afX9qdSdQI2l___7Mlossk98krvLCpoy6SpamNAkXEMfpV6tws3n9J7cQujGZWsjDCkuhljzaKlG-DS2txHH-ARD5ppALouvH96NJvaW0d4VAs6FfYTbOQXsyc5vlFwwt9IEY6mGu5a3lDPzanaOznVtcQfcSlu-_H0Nx6nGnQxC-ACCGf6i7qyju8b57ekFKVo7EEXrfgaoNehrEwbSALLnfiKCWHIp-8LwujECPnFAOhAb-kIrEzLti1h6QeBp7lElk2ADVdLn1GwiLBPlq5hx43uaScMkT0QfssxYSzhUhKmiw9KE0SBX8IjGWs3OFhHYInK2iEZVVCstGBW7efjL8K2_Dd9Hc-2zRtS8bF1to3nqfMBe6OygSvbyanbRrHrLHoYve86LPwEal_K5
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Strategic+Long-Term+Planning+for+Sublevel+Caving%3A+A+Unified+Mixed-Integer-Linear+Programming+Framework+for+Development%2C+Ventilation%2C+Production+Scheduling%2C+and+Stockpile+Management&rft.jtitle=Mining%2C+metallurgy+%26+exploration&rft.au=Khazaei%2C+Soroush&rft.au=Mousavi%2C+Amin&rft.au=Pourrahimian%2C+Yashar&rft.date=2025-06-01&rft.pub=Springer+International+Publishing&rft.issn=2524-3462&rft.eissn=2524-3470&rft.volume=42&rft.issue=3&rft.spage=1741&rft.epage=1757&rft_id=info:doi/10.1007%2Fs42461-025-01235-y&rft.externalDocID=10_1007_s42461_025_01235_y
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=2524-3462&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=2524-3462&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=2524-3462&client=summon