Citace podle APA (7th ed.)

Jin, C., Lu, L., & Min, J. (2022). A two-stage construction heuristic approach for vehicle routing problem with split deliveries and pickups: Case studies and performance comparison. Advances in production engineering & management, 17(1), 121-133. https://doi.org/10.14743/apem2022.1.425

Citace podle Chicago (17th ed.)

Jin, C., L.J Lu, a J.N Min. "A Two-stage Construction Heuristic Approach for Vehicle Routing Problem with Split Deliveries and Pickups: Case Studies and Performance Comparison." Advances in Production Engineering & Management 17, no. 1 (2022): 121-133. https://doi.org/10.14743/apem2022.1.425.

Citace podle MLA (9th ed.)

Jin, C., et al. "A Two-stage Construction Heuristic Approach for Vehicle Routing Problem with Split Deliveries and Pickups: Case Studies and Performance Comparison." Advances in Production Engineering & Management, vol. 17, no. 1, 2022, pp. 121-133, https://doi.org/10.14743/apem2022.1.425.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..