APA (7th ed.) Citation

Wu, Y., Zeng, S., Li, B., & Yu, Y. (2024). A bi-objective approach for the multi-skilled worker assignment of a hybrid assembly line-seru production system. R.A.I.R.O. Recherche opérationnelle, 58(2), 1187-1206. https://doi.org/10.1051/ro/2024022

Chicago Style (17th ed.) Citation

Wu, Yinghui, Shaoyu Zeng, Bingbing Li, and Yang Yu. "A Bi-objective Approach for the Multi-skilled Worker Assignment of a Hybrid Assembly Line-seru Production System." R.A.I.R.O. Recherche Opérationnelle 58, no. 2 (2024): 1187-1206. https://doi.org/10.1051/ro/2024022.

MLA (9th ed.) Citation

Wu, Yinghui, et al. "A Bi-objective Approach for the Multi-skilled Worker Assignment of a Hybrid Assembly Line-seru Production System." R.A.I.R.O. Recherche Opérationnelle, vol. 58, no. 2, 2024, pp. 1187-1206, https://doi.org/10.1051/ro/2024022.

Warning: These citations may not always be 100% accurate.