APA (7th ed.) Citation

Yu, R., Oron, D., & Lin, B. M. T. (2025, August 8). Single-machine and flow-shop scheduling with supporting tasks in a nested structure. Journal of scheduling. https://doi.org/10.1007/s10951-025-00855-y

Chicago Style (17th ed.) Citation

Yu, Renjie, Daniel Oron, and Bertrand M. T. Lin. "Single-machine and Flow-shop Scheduling with Supporting Tasks in a Nested Structure." Journal of Scheduling 8 Aug. 2025. https://doi.org/10.1007/s10951-025-00855-y.

MLA (9th ed.) Citation

Yu, Renjie, et al. "Single-machine and Flow-shop Scheduling with Supporting Tasks in a Nested Structure." Journal of Scheduling, 8 Aug. 2025, https://doi.org/10.1007/s10951-025-00855-y.

Warning: These citations may not always be 100% accurate.