Citáce podľa APA (7th ed.)

Yu, R., Oron, D., & Lin, B. M. T. (2025, August 8). Single-machine and flow-shop scheduling with supporting tasks in a nested structure. Journal of scheduling. https://doi.org/10.1007/s10951-025-00855-y

Citácia podle Chicago (17th ed.)

Yu, Renjie, Daniel Oron, a Bertrand M. T. Lin. "Single-machine and Flow-shop Scheduling with Supporting Tasks in a Nested Structure." Journal of Scheduling 8 Aug. 2025. https://doi.org/10.1007/s10951-025-00855-y.

Citácia podľa MLA (8th ed.)

Yu, Renjie, et al. "Single-machine and Flow-shop Scheduling with Supporting Tasks in a Nested Structure." Journal of Scheduling, 8 Aug. 2025, https://doi.org/10.1007/s10951-025-00855-y.

Upozornenie: Tieto citáce sú generované automaticky. Nemusia byť úplne správne podľa citačných pravidiel..