Fuzzy flexible resource constrained project scheduling based on genetic algorithm
Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that...
Uloženo v:
| Vydáno v: | Transactions of Tianjin University Ročník 20; číslo 6; s. 469 - 474 |
|---|---|
| Hlavní autoři: | , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Heidelberg
Tianjin University
01.12.2014
|
| Témata: | |
| ISSN: | 1006-4982, 1995-8196 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that the proposed approach can assist the project managers to obtain the optimal schedule effectively and make the correct decision on skill training before a project begins. |
|---|---|
| ISSN: | 1006-4982 1995-8196 |
| DOI: | 10.1007/s12209-014-2248-0 |