Fuzzy flexible resource constrained project scheduling based on genetic algorithm

Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that...

Full description

Saved in:
Bibliographic Details
Published in:Transactions of Tianjin University Vol. 20; no. 6; pp. 469 - 474
Main Authors: Zha, Hong, Zhang, Lianying
Format: Journal Article
Language:English
Published: Heidelberg Tianjin University 01.12.2014
Subjects:
ISSN:1006-4982, 1995-8196
Online Access:Get full text
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Both fuzzy temporal constraint and flexible resource constraint are considered in project scheduling. In order to obtain an optimal schedule, we propose a genetic algorithm integrated with concepts on fuzzy set theory as well as specialized coding and decoding mechanism. An example demonstrates that the proposed approach can assist the project managers to obtain the optimal schedule effectively and make the correct decision on skill training before a project begins.
ISSN:1006-4982
1995-8196
DOI:10.1007/s12209-014-2248-0