Bolotin, S., Bohan, H., Dadar, A., & Biche-ool, K. (2021). SCHEDULING WORK UNDER INTEGRATED URBAN DEVELOPMENT USING THE METHOD OF UNCERTAIN RESOURCE COEFFICIENTS. Architecture and Engineering, 6(4), 34-41. https://doi.org/10.23968/2500-0055-2021-6-4-34-41
Citace podle Chicago (17th ed.)Bolotin, Sergey, Haitham Bohan, Aldyn-kys Dadar, a Khenzig Biche-ool. "SCHEDULING WORK UNDER INTEGRATED URBAN DEVELOPMENT USING THE METHOD OF UNCERTAIN RESOURCE COEFFICIENTS." Architecture and Engineering 6, no. 4 (2021): 34-41. https://doi.org/10.23968/2500-0055-2021-6-4-34-41.
Citace podle MLA (9th ed.)Bolotin, Sergey, et al. "SCHEDULING WORK UNDER INTEGRATED URBAN DEVELOPMENT USING THE METHOD OF UNCERTAIN RESOURCE COEFFICIENTS." Architecture and Engineering, vol. 6, no. 4, 2021, pp. 34-41, https://doi.org/10.23968/2500-0055-2021-6-4-34-41.