Complexity of Cyclic Job Shop Scheduling Problems for Identical Jobs with No-Wait Constraints
We consider the cyclic job shop problem with no-wait constraints which consists in minimizing the cycle time. We assume that a single product is produced on a few machines. A job is processed by performing a given set of operations in a predetermined sequence. Each operation can be performed on exac...
Uloženo v:
| Vydáno v: | Journal of applied and industrial mathematics Ročník 13; číslo 4; s. 706 - 716 |
|---|---|
| Hlavní autoři: | , |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Moscow
Pleiades Publishing
01.10.2019
Springer Nature B.V |
| Témata: | |
| ISSN: | 1990-4789, 1990-4797 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Abstract | We consider the cyclic job shop problem with no-wait constraints which consists in minimizing the cycle time. We assume that a single product is produced on a few machines. A job is processed by performing a given set of operations in a predetermined sequence. Each operation can be performed on exactly one machine. We consider the problem of minimization the cycle time with no-wait constraints between some pairs of sequential operations and investigate the complexity of the problem and some of its subproblems. In general, the problem is proved to be strongly NP-hard. In the case when the job is processed without downtime between operations, polynomial solvability is proved and the two algorithms are proposed. Also we develop an algorithm for the general case which is pseudopolynomial if the number of admissible downtime is fixed. The case of a single no-wait constraint is polynomially solvable. The problem with two no-wait constraints becomes NP-hard. We found effectively solvable cases and propose the corresponding algorithms. |
|---|---|
| AbstractList | We consider the cyclic job shop problem with no-wait constraints which consists in minimizing the cycle time. We assume that a single product is produced on a few machines. A job is processed by performing a given set of operations in a predetermined sequence. Each operation can be performed on exactly one machine. We consider the problem of minimization the cycle time with no-wait constraints between some pairs of sequential operations and investigate the complexity of the problem and some of its subproblems. In general, the problem is proved to be strongly NP-hard. In the case when the job is processed without downtime between operations, polynomial solvability is proved and the two algorithms are proposed. Also we develop an algorithm for the general case which is pseudopolynomial if the number of admissible downtime is fixed. The case of a single no-wait constraint is polynomially solvable. The problem with two no-wait constraints becomes NP-hard. We found effectively solvable cases and propose the corresponding algorithms. |
| Author | Romanova, A. A. Servakh, V. V. |
| Author_xml | – sequence: 1 givenname: A. A. surname: Romanova fullname: Romanova, A. A. email: anna.a.~r@bk.ru organization: Dostoevsky Omsk State University – sequence: 2 givenname: V. V. surname: Servakh fullname: Servakh, V. V. email: svv_usa@rambler.ru organization: Omsk Branch of Sobolev Institute of Mathematics |
| BookMark | eNp9kF1LwzAUhoNMcM79AO8CXlfz0SbNpRQ_JkOFKV5JSdN0i3RJTTJ0_96WiYKiV-97Du9zzuEcgpF1VgNwjNEpxjQ9W2AhUMpzgXtBmLI9MB5aScoFH335XByAaQimQhQTRhkjY_BcuHXX6ncTt9A1sNiq1ih44yq4WLkOLtRK15vW2CW8965q9TrAxnk4q7WNRsl2iAb4ZuIK3rrkSZoIC2dD9NLYGI7AfiPboKefOgGPlxcPxXUyv7uaFefzRBGKWVKTDFc5721OFBNZ2ldSUcFYLRtKEJY8bwiu0izVCFWMIZprQanEDZNZo-gEnOzmdt69bnSI5YvbeNuvLAnNkKBpxnmf4ruU8i4Er5tSmSijcXY4ty0xKod3lr_e2ZP4B9l5s5Z--y9Ddkzos3ap_fdNf0MfK_qGHw |
| CitedBy_id | crossref_primary_10_1016_j_isatra_2022_05_031 |
| Cites_doi | 10.1002/jos.95 10.1016/0377-2217(94)90332-8 10.1287/moor.17.4.842 10.1002/jos.92 10.1002/jos.100 10.1007/s10951-005-1639-4 10.1080/00207540110047711 10.1002/jos.72 10.1016/0895-7177(94)90210-0 |
| ContentType | Journal Article |
| Copyright | Pleiades Publishing, Ltd. 2019 2019© Pleiades Publishing, Ltd. 2019 |
| Copyright_xml | – notice: Pleiades Publishing, Ltd. 2019 – notice: 2019© Pleiades Publishing, Ltd. 2019 |
| DBID | AAYXX CITATION 7TB 8FD FR3 JQ2 KR7 |
| DOI | 10.1134/S1990478919040136 |
| DatabaseName | CrossRef Mechanical & Transportation Engineering Abstracts Technology Research Database Engineering Research Database ProQuest Computer Science Collection Civil Engineering Abstracts |
| DatabaseTitle | CrossRef Civil Engineering Abstracts Engineering Research Database Technology Research Database Mechanical & Transportation Engineering Abstracts ProQuest Computer Science Collection |
| DatabaseTitleList | Civil Engineering Abstracts |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Mathematics |
| EISSN | 1990-4797 |
| EndPage | 716 |
| ExternalDocumentID | 10_1134_S1990478919040136 |
| GroupedDBID | -5D -5G -BR -EM -Y2 -~C .VR 06D 0R~ 0VY 1N0 29J 2J2 2JN 2JY 2KG 2KM 2LR 2VQ 2~H 30V 3V. 4.4 408 40D 40E 5GY 5VS 6NX 7WY 88I 8FE 8FG 8FL 8TC 95- 95. 95~ 96X AAAVM AABHQ AACDK AAHNG AAIAL AAJBT AAJKR AANZL AARHV AARTL AASML AATNV AATVU AAUYE AAWCG AAYIU AAYQN AAYTO AAYZH ABAKF ABDZT ABECU ABFTD ABFTV ABHQN ABJCF ABJNI ABJOX ABKCH ABMNI ABMQK ABNWP ABQBU ABSXP ABTEG ABTHY ABTKH ABTMW ABULA ABUWG ABWNU ABXPI ACAOD ACBXY ACDTI ACGFS ACGOD ACHSB ACHXU ACIWK ACKNC ACMDZ ACMLO ACOKC ACOMO ACPIV ACSNA ACZOJ ADHHG ADINQ ADKNI ADKPE ADRFC ADTPH ADURQ ADYFF ADZKW AEBTG AEFQL AEGAL AEGNC AEJHL AEJRE AEMSY AEOHA AEPYU AETLH AEVLU AEXYK AFBBN AFGCZ AFKRA AFLOW AFQWF AFWTZ AFZKB AGAYW AGDGC AGJBK AGMZJ AGQMX AGRTI AGWIL AGWZB AGYKE AHAVH AHBYD AHKAY AHSBF AHYZX AIAKS AIGIU AIIXL AILAN AITGF AJBLW AJRNO ALMA_UNASSIGNED_HOLDINGS ALWAN AMKLP AMXSW AMYLF AMYQR AOCGG ARAPS ARMRJ AXYYD AZQEC B-. BA0 BAPOH BDATZ BENPR BEZIV BGLVJ BGNMA BPHCQ CAG CCPQU COF CS3 CSCUP DDRTE DNIVK DPUIP DWQXO EBLON EBS EIOEI EJD FERAY FFXSO FIGPU FINBP FNLPD FRNLG FRRFC FSGXE FWDCC GGCAI GGRSB GJIRD GNUQQ GNWQR GQ6 GQ7 GROUPED_ABI_INFORM_COMPLETE H13 HCIFZ HF~ HG6 HLICF HMJXF HRMNR HZ~ IJ- IKXTQ IWAJR IXD I~X I~Z J-C J9A JBSCW JZLTJ K60 K6V K6~ K7- KOV L6V LLZTM M0C M0N M2P M4Y M7S MA- NPVJJ NQJWS NU0 O9- O93 O9J P2P P62 P9R PF0 PQBIZ PQBZA PQQKQ PROAC PT4 PTHSS Q2X QOS R89 R9I ROL RSV S16 S1Z S27 S3B SAP SDH SHX SISQX SJYHP SMT SNE SNPRN SNX SOHCF SOJ SPISZ SRMVM SSLCW STPWE SZN T13 TSG TUC UG4 UOJIU UTJUX UZXMN VC2 VFIZW W48 WK8 XU3 YLTOR ZMTXR ~A9 AAPKM AAYXX ABDBE ABFSG ABRTQ ACSTC AEZWR AFDZB AFFHD AFHIU AFOHR AHPBZ AHWEU AIXLP ATHPR CITATION PHGZM PHGZT PQGLB 7TB 8FD FR3 JQ2 KR7 |
| ID | FETCH-LOGICAL-c2316-d251b8731682c69541b8ac3966daf3201a78f21b454e00b66038e933a1f6a5fc3 |
| IEDL.DBID | RSV |
| ISSN | 1990-4789 |
| IngestDate | Wed Sep 17 23:59:45 EDT 2025 Tue Nov 18 22:34:52 EST 2025 Sat Nov 29 06:27:34 EST 2025 Fri Feb 21 02:32:10 EST 2025 |
| IsPeerReviewed | true |
| IsScholarly | true |
| Issue | 4 |
| Keywords | pseudopolynomial algorithm cyclic job shop computational complexity theory scheduling theory polynomial algorithm identical jobs |
| Language | English |
| LinkModel | DirectLink |
| MergedId | FETCHMERGED-LOGICAL-c2316-d251b8731682c69541b8ac3966daf3201a78f21b454e00b66038e933a1f6a5fc3 |
| Notes | ObjectType-Article-1 SourceType-Scholarly Journals-1 ObjectType-Feature-2 content type line 14 |
| PQID | 2350934577 |
| PQPubID | 54414 |
| PageCount | 11 |
| ParticipantIDs | proquest_journals_2350934577 crossref_citationtrail_10_1134_S1990478919040136 crossref_primary_10_1134_S1990478919040136 springer_journals_10_1134_S1990478919040136 |
| PublicationCentury | 2000 |
| PublicationDate | 20191000 |
| PublicationDateYYYYMMDD | 2019-10-01 |
| PublicationDate_xml | – month: 10 year: 2019 text: 20191000 |
| PublicationDecade | 2010 |
| PublicationPlace | Moscow |
| PublicationPlace_xml | – name: Moscow – name: Dordrecht |
| PublicationTitle | Journal of applied and industrial mathematics |
| PublicationTitleAbbrev | J. Appl. Ind. Math |
| PublicationYear | 2019 |
| Publisher | Pleiades Publishing Springer Nature B.V |
| Publisher_xml | – name: Pleiades Publishing – name: Springer Nature B.V |
| References | Hanen (CR4) 1994; 71 Boudoukh, Penn, Weiss (CR9) 2001; 4 Middendorf, Timkovsky (CR6) 2002; 5 Romanova, Servakh (CR2) 2008; 15 Garey, Johnson (CR11) 1979 Kats, Levner (CR12) 2002; 5 Brucker, Kampmeyer (CR10) 2005; 8 Bobrova, Romanova, Servakh (CR1) 2013; 20 Tanaev (CR14) 1964; 7 Aldakhilallah, Ramesh (CR8) 2001; 39 McCormick, Rao (CR5) 1994; 20 Aizenshtat (CR13) 1963; 7 Roundy (CR7) 1995; 17 Hall, Lee, Posner (CR3) 2002; 5 A A Romanova (4701_CR2) 2008; 15 C Hanen (4701_CR4) 1994; 71 N G Hall (4701_CR3) 2002; 5 K A Aldakhilallah (4701_CR8) 2001; 39 P Brucker (4701_CR10) 2005; 8 S T McCormick (4701_CR5) 1994; 20 M R Garey (4701_CR11) 1979 E A Bobrova (4701_CR1) 2013; 20 R Roundy (4701_CR7) 1995; 17 V Kats (4701_CR12) 2002; 5 M Middendorf (4701_CR6) 2002; 5 T Boudoukh (4701_CR9) 2001; 4 V S Tanaev (4701_CR14) 1964; 7 V S Aizenshtat (4701_CR13) 1963; 7 |
| References_xml | – volume: 5 start-page: 135 issue: 2 year: 2002 end-page: 169 ident: CR6 article-title: On Scheduling Cycle Shops: Classification, Complexity, and Approximation publication-title: J. Scheduling doi: 10.1002/jos.95 – volume: 71 start-page: 82 year: 1994 end-page: 101 ident: CR4 article-title: Study of a NP-Hard Cyclic Scheduling Problem: the Recurrent Job-Shop publication-title: European J. Oper. Res. doi: 10.1016/0377-2217(94)90332-8 – volume: 17 start-page: 842 issue: 4 year: 1995 end-page: 865 ident: CR7 article-title: Cyclic Schedules for Job Shops with Identical Jobs publication-title: Math. Oper. Res. doi: 10.1287/moor.17.4.842 – volume: 20 start-page: 3 issue: 4 year: 2013 end-page: 14 ident: CR1 article-title: The Complexity of the Cyclic Job Shop Problem with Identical Jobs publication-title: Diskretn. Anal. Issled. Oper. – year: 1979 ident: CR11 publication-title: Computers and Intractability: A Guide to the Theory of NP-Completeness – volume: 5 start-page: 23 issue: 1 year: 2002 end-page: 41 ident: CR12 article-title: Cyclic Scheduling in a Robotic Production Line publication-title: J. Scheduling doi: 10.1002/jos.92 – volume: 7 start-page: 111 issue: 3 year: 1964 end-page: 114 ident: CR14 article-title: A Scheduling Problemfora Flowshop Line with a Single Operator publication-title: Inzh.-Fiz.Zh. – volume: 5 start-page: 307 issue: 4 year: 2002 end-page: 327 ident: CR3 article-title: The Complexity of Cyclic Shop Scheduling Problems publication-title: J. Scheduling doi: 10.1002/jos.100 – volume: 8 start-page: 303 year: 2005 end-page: 322 ident: CR10 article-title: Tabu Search Algorithms for Cyclic Machine Scheduling Problems publication-title: J. Scheduling doi: 10.1007/s10951-005-1639-4 – volume: 7 start-page: 224 issue: 4 year: 1963 end-page: 227 ident: CR13 article-title: Multi-Operator Cyclic Processes publication-title: Dokl. Nats. Akad. Nauk Belarus – volume: 15 start-page: 47 issue: 4 year: 2008 end-page: 60 ident: CR2 article-title: Optimization of Identical Jobs Production on the Base of Cyclic Schedules publication-title: Diskretn. Anal. Issled. Oper. – volume: 39 start-page: 2635 year: 2001 end-page: 2675 ident: CR8 article-title: Cyclic Scheduling Heuristics for a Reentrant Job Shop Manufacturing Environment publication-title: Internat. J. Production Research doi: 10.1080/00207540110047711 – volume: 4 start-page: 177 year: 2001 end-page: 199 ident: CR9 article-title: Scheduling Job Shops with Some Identical or Similar Jobs publication-title: J. Scheduling doi: 10.1002/jos.72 – volume: 20 start-page: 107 year: 1994 end-page: 122 ident: CR5 article-title: Some Complexity Results in Cyclic Scheduling publication-title: Math. Comput. Modelling doi: 10.1016/0895-7177(94)90210-0 – volume: 7 start-page: 111 issue: 3 year: 1964 ident: 4701_CR14 publication-title: Inzh.-Fiz.Zh. – volume: 20 start-page: 3 issue: 4 year: 2013 ident: 4701_CR1 publication-title: Diskretn. Anal. Issled. Oper. – volume: 5 start-page: 307 issue: 4 year: 2002 ident: 4701_CR3 publication-title: J. Scheduling doi: 10.1002/jos.100 – volume: 20 start-page: 107 year: 1994 ident: 4701_CR5 publication-title: Math. Comput. Modelling doi: 10.1016/0895-7177(94)90210-0 – volume: 5 start-page: 23 issue: 1 year: 2002 ident: 4701_CR12 publication-title: J. Scheduling doi: 10.1002/jos.92 – volume: 39 start-page: 2635 year: 2001 ident: 4701_CR8 publication-title: Internat. J. Production Research doi: 10.1080/00207540110047711 – volume: 8 start-page: 303 year: 2005 ident: 4701_CR10 publication-title: J. Scheduling doi: 10.1007/s10951-005-1639-4 – volume: 7 start-page: 224 issue: 4 year: 1963 ident: 4701_CR13 publication-title: Dokl. Nats. Akad. Nauk Belarus – volume: 5 start-page: 135 issue: 2 year: 2002 ident: 4701_CR6 publication-title: J. Scheduling doi: 10.1002/jos.95 – volume: 4 start-page: 177 year: 2001 ident: 4701_CR9 publication-title: J. Scheduling doi: 10.1002/jos.72 – volume: 15 start-page: 47 issue: 4 year: 2008 ident: 4701_CR2 publication-title: Diskretn. Anal. Issled. Oper. – volume: 17 start-page: 842 issue: 4 year: 1995 ident: 4701_CR7 publication-title: Math. Oper. Res. doi: 10.1287/moor.17.4.842 – volume-title: Computers and Intractability: A Guide to the Theory of NP-Completeness year: 1979 ident: 4701_CR11 – volume: 71 start-page: 82 year: 1994 ident: 4701_CR4 publication-title: European J. Oper. Res. doi: 10.1016/0377-2217(94)90332-8 |
| SSID | ssib031263662 ssj0000327814 |
| Score | 2.1066165 |
| Snippet | We consider the cyclic job shop problem with no-wait constraints which consists in minimizing the cycle time. We assume that a single product is produced on a... |
| SourceID | proquest crossref springer |
| SourceType | Aggregation Database Enrichment Source Index Database Publisher |
| StartPage | 706 |
| SubjectTerms | Algorithms Complexity Cycle time Downtime Job shop scheduling Job shops Mathematics Mathematics and Statistics Polynomials Production scheduling |
| Title | Complexity of Cyclic Job Shop Scheduling Problems for Identical Jobs with No-Wait Constraints |
| URI | https://link.springer.com/article/10.1134/S1990478919040136 https://www.proquest.com/docview/2350934577 |
| Volume | 13 |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVAVX databaseName: SpringerLink customDbUrl: eissn: 1990-4797 dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0000327814 issn: 1990-4789 databaseCode: RSV dateStart: 20070301 isFulltext: true titleUrlDefault: https://link.springer.com/search?facet-content-type=%22Journal%22 providerName: Springer Nature |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1JS8QwFA5uBz24i-NGDp6UYtuXJs1RxEEEh4FxmYuUNE11QKZiq-C_9yVtHVxBL4XSJIS817fkJd9HyL4ycQpSMS_MRO6xMA-8WOMDva0BBspIwxzZhOj14uFQ9pt73GV72r0tSTpLXfOOsKNBgIaTiViiC7NJAZ8ms5EFm7Ep-uC6VSIIQg68wcBz5hhCC-vkqsvS9-wITXXz21E_-qdJ0PmpTurcT3fpXxNfJotNtEmPa_VYIVNmvEoWLt6hWss1cmstgkXFrF5pkdOTV_0w0vS8SOngvnikAxRqZk-r39F-zT1TUoxzaX3BFwVsm5bUbufSXuHdqFFFLQmoo56oynVy1T29PDnzGs4FT2Okx70M4500dnRWoeYyYvimNGBSlKkcMFpQIs7DIGURM76fcu5DbCSACnKuolzDBpkZF2OzSaj2RYbWQGEvDFOEULGOtDQ84BkETEOH-O1KJ7oBJLeTe0hcYgIs-bJyHXLw3uWxRuP4rfFOK76k-THLJATUGWCREB1y2Ipr8vnHwbb-1HqbzONSyfrQ3w6ZqZ6ezS6Z0y_VqHzac_r6BhP_3Zc |
| linkProvider | Springer Nature |
| linkToHtml | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwnV1La9wwEB7STaHNIekjJdtsWh16ajG1PbJkHUNIyHNZ2G2bSzGyLLcLYR1iJ7D_viPZztI2LbQXg_FICI08841Gmg_gnbZpjkrzIC5kGfC4jILU0IO8rUWO2irLPdmEHI_Ty0s16e5x1_1p9z4l6S11yzvCP04jMpxcpopcmAsKxCNY545lx4Xo08_9IsIoFii6GnjeHGPsyjr57LIKA9dDl918sNef_dMKdP6SJ_Xu52jrvwb-DDY7tMn22-XxHNbs4gVsXNyXaq1fwldnEVxVzGbJqpIdLM3V3LDTKmfT79U1m5JSC3da_RubtNwzNSOcy9oLvqRgJ1ozt53LxlXwRc8b5khAPfVEU2_Dp6PD2cFx0HEuBIaQnggKwjt56umsYiNUwulNG6SgqNAlElrQMi3jKOcJt2GYCxFiahWijkqhk9LgKxgsqoXdAWZCWZA10NSKYIqUOjWJUVZEosCIGxxC2M90ZrqC5G5wV5kPTJBnv83cEN7fN7luq3H8TXjUqy_rfsw6i5EQEvJEyiF86NW1-vzHzl7_k_RbeHI8uzjPzk_GZ7vwlKZNtQcARzBobm7tHjw2d828vnnj1-4Pf1bgew |
| linkToPdf | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwpV3fT9swED5t3TRtD7CNoZUB88OeQFGTnGPHjxNQDdiqamXQFxQ5jjMqVU1FwiT-e875AdoGSNNeIkWxrcTn3H3nO98H8EnbOEWluRdmMvd4mAdebOhC1tYiR22V5TXZhByN4ulUjVue07LLdu9Cks2ZBlelaVENllnecpDwwSQgJcplrMicOQdBPIVnnBwZl9P1fXLaLSgMQoGirYdXq2YMXYmnOtKsfM-N0EY67x31d1t1B0D_iJnWpmi4-t8f8RpWWhTKPjfL5g08sYu38OrbbQnXcg3OnaZw1TKra1bkbO_azGeGHRUpm1wUSzYhYWcui_0nGzecNCUj_Muag78keNe0ZG6bl40K70zPKubIQWtKiqp8Bz-GByd7X7yWi8EzhACFlxEOSuOa5io0QkWc7rRBcpYynSOhCC3jPAxSHnHr-6kQPsZWIeogFzrKDa5Db1Es7HtgxpcZaQlNvQi-SKljExllRSAyDLjBPvjdrCemLVTuXm6e1A4L8uSvmevDzm2XZVOl47HGm50ok_aHLZMQCTkhj6Tsw24nurvHDw628U-tP8KL8f4w-Xo4Ov4AL2nWVJMXuAm96vLKbsFz86ualZfb9TK-AYaK6V8 |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Complexity+of+Cyclic+Job+Shop+Scheduling+Problems+for+Identical+Jobs+with+No-Wait+Constraints&rft.jtitle=Journal+of+applied+and+industrial+mathematics&rft.au=Romanova%2C+A.+A.&rft.au=Servakh%2C+V.+V.&rft.date=2019-10-01&rft.pub=Pleiades+Publishing&rft.issn=1990-4789&rft.eissn=1990-4797&rft.volume=13&rft.issue=4&rft.spage=706&rft.epage=716&rft_id=info:doi/10.1134%2FS1990478919040136&rft.externalDocID=10_1134_S1990478919040136 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=1990-4789&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=1990-4789&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=1990-4789&client=summon |