Babu, R., & Gupta, V. K. (2023). Analysis of Bus Vulnerability Conducted Using a Synchronized Phasor Measurement Unit in Order to Achieve the Maximum Observability. TESEA, transactions on energy systems and engineering applications, 4(2), 1-23. https://doi.org/10.32397/tesea.vol4.n2.523
Citace podle Chicago (17th ed.)Babu, Rohit, a Vikash Kumar Gupta. "Analysis of Bus Vulnerability Conducted Using a Synchronized Phasor Measurement Unit in Order to Achieve the Maximum Observability." TESEA, Transactions on Energy Systems and Engineering Applications 4, no. 2 (2023): 1-23. https://doi.org/10.32397/tesea.vol4.n2.523.
Citace podle MLA (9th ed.)Babu, Rohit, a Vikash Kumar Gupta. "Analysis of Bus Vulnerability Conducted Using a Synchronized Phasor Measurement Unit in Order to Achieve the Maximum Observability." TESEA, Transactions on Energy Systems and Engineering Applications, vol. 4, no. 2, 2023, pp. 1-23, https://doi.org/10.32397/tesea.vol4.n2.523.