APA (7th ed.) Citation

Jin, R., Tong, W., Xu, Y., & Dong, J. (2025, May 17). Two-stage flexible flow shop scheduling in GPU systems. The Journal of the Operational Research Society, 1-12. https://doi.org/10.1080/01605682.2025.2504435

Chicago Style (17th ed.) Citation

Jin, Ruyan, Weitian Tong, Yao Xu, and Jianming Dong. "Two-stage Flexible Flow Shop Scheduling in GPU Systems." The Journal of the Operational Research Society 17 May. 2025: 1-12. https://doi.org/10.1080/01605682.2025.2504435.

MLA (9th ed.) Citation

Jin, Ruyan, et al. "Two-stage Flexible Flow Shop Scheduling in GPU Systems." The Journal of the Operational Research Society, 17 May. 2025, pp. 1-12, https://doi.org/10.1080/01605682.2025.2504435.

Warning: These citations may not always be 100% accurate.