Note on Program Uncertainty in the Dynamic Programming Problem
In this note we study the dynamic inventory problem for a follow-on provisioning in which the program length is subject to uncertainty with a known distribution. It is shown that under rather general cost conditions, the optimal policy is of the (S, s) type. This is true whether or not there exists...
Uloženo v:
| Vydáno v: | Econometrica Ročník 30; číslo 2; s. 336 - 342 |
|---|---|
| Hlavní autor: | |
| Médium: | Journal Article |
| Jazyk: | angličtina |
| Vydáno: |
Menasha, Wis
The Econometric Society
01.04.1962
George Banta Pub. Co. for the Econometric Society Blackwell Publishing Ltd |
| Témata: | |
| ISSN: | 0012-9682, 1468-0262 |
| On-line přístup: | Získat plný text |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
| Shrnutí: | In this note we study the dynamic inventory problem for a follow-on provisioning in which the program length is subject to uncertainty with a known distribution. It is shown that under rather general cost conditions, the optimal policy is of the (S, s) type. This is true whether or not there exists a time lag in delivery provided that excess demand is always backlogged. The case of an infinite program horizon is also briefly discussed. |
|---|---|
| Bibliografie: | ObjectType-Article-2 SourceType-Scholarly Journals-1 ObjectType-Feature-1 content type line 14 ObjectType-Article-1 |
| ISSN: | 0012-9682 1468-0262 |
| DOI: | 10.2307/1910222 |