Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs
Saved in:
| Published in: | Engineering, construction, and architectural management |
|---|---|
| Main Authors: | , |
| Format: | Journal Article |
| Language: | English |
| Published: |
02.12.2024
|
| ISSN: | 0969-9988, 1365-232X |
| Online Access: | Get full text |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| Author | Zhang, Lihui Zou, Xin |
|---|---|
| Author_xml | – sequence: 1 givenname: Xin surname: Zou fullname: Zou, Xin – sequence: 2 givenname: Lihui surname: Zhang fullname: Zhang, Lihui |
| BookMark | eNotkMFKAzEYhINUsK0-gLe8QPTPptlNjqW0KlS8KHgLu8kfTW03JUmF9untqqeBmWEYvgkZ9bFHQm453HEO6n65mD8z0KyCSpyVwwUZc1FLVonqfUTGoGvNtFbqikxy3gBwNZNiTDarw-l0pAn3WEIJ30iz_UR32Ib-g_qYqI19LulgS4g93ae4QVvyrxscpqGVQv46J-gxYW8x07Z3tIQdMhtzoSW1DqP3-Zpc-nab8eZfp-RttXxdPLL1y8PTYr5mluumsMY5VFrMvIYOpAWEFji4WqFUunN85nnVSK0l8kYq31mQtRSOt9jVvtFKTAn_27Up5nz-ZfYp7Np0NBzMAMsMsAxoM8AyAyzxAxT9Yfo |
| Cites_doi | 10.3390/buildings11120658 10.1061/(asce)co.1943-7862.0000862 10.1080/15623599.2018.1505027 10.1108/ecam-08-2022-0703 10.1016/j.ejor.2010.05.046 10.1080/01446193.2019.1606924 10.1061/(asce)co.1943-7862.0001911 10.1061/(asce)co.1943-7862.0001107 10.1007/s12351-019-00544-7 10.1061/(asce)co.1943-7862.0001164 10.1061/(asce)co.1943-7862.0002072 10.1016/j.ijproman.2005.03.003 10.1109/TEM.2024.3394852 10.1080/15623599.2023.2276650 10.1016/j.ejor.2011.02.002 10.1061/(asce)co.1943-7862.0001595 10.1108/ecam-05-2018-0217 10.3846/jcem.2023.17568 10.1287/mnsc.6.1.73 10.1016/j.aej.2021.06.058 10.1061/(asce)cp.1943-5487.0000745 10.1007/s10951-007-0031-y 10.1080/15623599.2021.1975078 10.1111/mice.12166 10.1108/ecam-05-2014-0069 10.1016/j.autcon.2017.03.007 10.3233/ifs-130878 10.1061/(asce)me.1943-5479.0000426 10.1016/j.autcon.2024.105359 10.1016/j.autcon.2021.103601 10.1007/s12205-020-1429-8 10.3846/jcem.2022.16943 10.1016/j.autcon.2019.03.020 10.1016/j.autcon.2024.105428 10.3846/jcem.2019.9681 10.1061/9780784485231.022 10.1155/2017/7545980 10.1108/ecam-10-2020-0843 10.1139/cjce-2017-0020 10.1109/4235.996017 10.1108/ecam-12-2023-1217 10.1016/j.autcon.2021.104042 10.1139/cjce-2022-0029 10.1016/j.cie.2007.11.017 10.1061/(asce)co.1943-7862.0001161 10.1016/j.apm.2009.04.011 10.1016/j.autcon.2022.104266 10.1016/s0165-0114(96)00236-9 10.3390/buildings14072073 10.1016/j.ijpe.2007.02.003 10.1139/cjce-2014-0347 10.1016/j.autcon.2019.102990 10.1108/ecam-05-2020-0304 10.1061/(asce)co.1943-7862.0001996 10.1108/ecam-10-2019-0590 10.1007/s12205-019-0151-x 10.1111/mice.12038 10.1061/(asce)co.1943-7862.0000319 10.1061/(asce)co.1943-7862.0002348 10.1016/0165-0114(94)90211-9 10.1016/j.autcon.2009.04.006 10.1061/(asce)me.1943-5479.0000565 10.1061/(asce)co.1943-7862.0000320 10.1023/a:1022452626305 10.1109/mci.2017.2742868 10.1111/mice.12277 10.1111/mice.12356 10.1061/(asce)me.1943-5479.0000936 10.1061/jcemd4.coeng-14314 10.1016/j.ijpe.2019.107522 10.1016/j.ijpe.2004.04.002 10.1111/mice.12383 10.1016/j.ejor.2015.10.059 10.1108/ecam-08-2019-0458 |
| ContentType | Journal Article |
| DBID | AAYXX CITATION |
| DOI | 10.1108/ECAM-09-2023-0910 |
| DatabaseName | CrossRef |
| DatabaseTitle | CrossRef |
| DeliveryMethod | fulltext_linktorsrc |
| Discipline | Economics Engineering |
| EISSN | 1365-232X |
| ExternalDocumentID | 10_1108_ECAM_09_2023_0910 |
| GroupedDBID | .WX 0R~ 1OC 29G 3FY 3SW 4.4 5GY 5VS 70U 7WY 9E0 9F- AAGBP AAKOT AAMCF AAPSD AAUDR AAYXX ABEAN ABIJV ABJNI ABSDC ABXQL ABYQI ACGFS ACGOD ACIWK ADKAA ADOMW ADWNT AEBZA AEDOK AEMMR AETHF AFNZV AGTVX AHMHQ AIAFM AILOG AJEBP ALMA_UNASSIGNED_HOLDINGS AODMV ASMFL ATGMP BENPR CITATION CS3 DU5 EBU ECCUG FNNZZ GEC GEI GMM GMN GMX GQ. H13 HCIFZ HZ~ I-F IJT J1Y JI- JL0 K6~ KBGRL L7B M42 O9- P2P RIG TEM TET TGG TMD TMF TMK TMT Z11 Z12 Z21 ZYZAG |
| ID | FETCH-LOGICAL-c197t-7dde8934f90b05c0e0a010d68e589bd14f1275995e1758fbc05653d1aeb6f7983 |
| IEDL.DBID | TMT |
| ISICitedReferencesCount | 0 |
| ISICitedReferencesURI | http://www.webofscience.com/api/gateway?GWVersion=2&SrcApp=Summon&SrcAuth=ProQuest&DestLinkType=CitingArticles&DestApp=WOS_CPL&KeyUT=001366640000001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| ISSN | 0969-9988 |
| IngestDate | Sat Nov 29 02:09:44 EST 2025 |
| IsPeerReviewed | true |
| IsScholarly | true |
| Language | English |
| License | https://www.emerald.com/insight/site-policies |
| LinkModel | DirectLink |
| MergedId | FETCHMERGED-LOGICAL-c197t-7dde8934f90b05c0e0a010d68e589bd14f1275995e1758fbc05653d1aeb6f7983 |
| ParticipantIDs | crossref_primary_10_1108_ECAM_09_2023_0910 |
| PublicationCentury | 2000 |
| PublicationDate | 2024-12-02 |
| PublicationDateYYYYMMDD | 2024-12-02 |
| PublicationDate_xml | – month: 12 year: 2024 text: 2024-12-02 day: 02 |
| PublicationDecade | 2020 |
| PublicationTitle | Engineering, construction, and architectural management |
| PublicationYear | 2024 |
| References | (key2024113004264510300_ref001) 2024 (key2024113004264510300_ref007) 2013 (key2024113004264510300_ref051) 2022; 61 (key2024113004264510300_ref017) 2011; 137 (key2024113004264510300_ref025) 2021; 28 (key2024113004264510300_ref065) 2024; 162 (key2024113004264510300_ref050) 2023; 50 (key2024113004264510300_ref074) 2024 (key2024113004264510300_ref063) 2022; 28 (key2024113004264510300_ref078) 2022; 29 (key2024113004264510300_ref080) 2022 (key2024113004264510300_ref068) 2024; 150 (key2024113004264510300_ref021) 2017; 81 (key2024113004264510300_ref006) 2014; 26 (key2024113004264510300_ref061) 2017; 12 (key2024113004264510300_ref077) 2018; 34 (key2024113004264510300_ref018) 2021; 21 (key2024113004264510300_ref027) 2020; 223 (key2024113004264510300_ref058) 2018; 33 (key2024113004264510300_ref002) 2005; 96 (key2024113004264510300_ref056) 2017; 45 (key2024113004264510300_ref062) 2019; 145 (key2024113004264510300_ref016) 2002; 6 (key2024113004264510300_ref044) 2024; 164 (key2024113004264510300_ref037) 2016; 142 (key2024113004264510300_ref026) 2021; 23 (key2024113004264510300_ref035) 2024 (key2024113004264510300_ref071) 2005; 23 (key2024113004264510300_ref075) 2020; 109 (key2024113004264510300_ref076) 2024; 24 (key2024113004264510300_ref045) 2011; 137 (key2024113004264510300_ref052) 2015; 30 (key2024113004264510300_ref064) 2022; 139 (key2024113004264510300_ref008) 2016; 23 (key2024113004264510300_ref072) 2017; 2017 (key2024113004264510300_ref020) 2019; 105 (key2024113004264510300_ref013) 2008; 55 (key2024113004264510300_ref015) 2013; 28 (key2024113004264510300_ref036) 2006 (key2024113004264510300_ref019) 2018; 33 (key2024113004264510300_ref048) 2016; 142 (key2024113004264510300_ref060) 2018; 32 (key2024113004264510300_ref022) 2016; 142 (key2024113004264510300_ref066) 2019; 25 (key2024113004264510300_ref034) 2016; 32 (key2024113004264510300_ref070) 2016; 251 (key2024113004264510300_ref038) 2021; 67 (key2024113004264510300_ref032) 2019; 23 (key2024113004264510300_ref057) 2014; 140 (key2024113004264510300_ref079) 2024; 71 (key2024113004264510300_ref030) 2020; 146 (key2024113004264510300_ref040) 2010; 34 (key2024113004264510300_ref054) 2021; 28 (key2024113004264510300_ref039) 2021; 147 (key2024113004264510300_ref055) 2019; 26 (key2024113004264510300_ref053) 2005; 11 (key2024113004264510300_ref028) 2010; 207 (key2024113004264510300_ref049) 2016; 43 (key2024113004264510300_ref010) 2022; 148 (key2024113004264510300_ref047) 2020; 24 (key2024113004264510300_ref042) 1998; 94 (key2024113004264510300_ref023) 2018; 3 (key2024113004264510300_ref043) 2024; 14 (key2024113004264510300_ref011) 1959; 6 (key2024113004264510300_ref041) 2008; 111 (key2024113004264510300_ref009) 2003; 25 (key2024113004264510300_ref014) 2023; 29 (key2024113004264510300_ref046) 2021; 37 (key2024113004264510300_ref012) 2011; 212 (key2024113004264510300_ref069) 2007; 10 (key2024113004264510300_ref031) 2021; 124 (key2024113004264510300_ref003) 2021; 11 (key2024113004264510300_ref004) 2021; 147 (key2024113004264510300_ref005) 2020; 38 (key2024113004264510300_ref024) 1994; 67 (key2024113004264510300_ref029) 2022; 133 (key2024113004264510300_ref073) 2020; 27 (key2024113004264510300_ref059) 2018; 33 (key2024113004264510300_ref067) 2020; 22 (key2024113004264510300_ref033) 2009; 18 (key2024113004264510300_ref081) 2021; 9 |
| References_xml | – volume: 11 start-page: 658 issue: 12 year: 2021 ident: key2024113004264510300_ref003 article-title: Optimal planning of hotel renovation projects publication-title: Buildings doi: 10.3390/buildings11120658 – volume: 140 issue: 7 year: 2014 ident: key2024113004264510300_ref057 article-title: Two-stage scheduling model for resource leveling of linear projects publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0000862 – volume: 21 start-page: 41 issue: 1 year: 2021 ident: key2024113004264510300_ref018 article-title: Simultaneous multi-criteria optimization for scheduling linear infrastructure projects publication-title: International Journal of Construction Management doi: 10.1080/15623599.2018.1505027 – year: 2024 ident: key2024113004264510300_ref074 article-title: Resource-constrained repetitive project scheduling with soft logic publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-08-2022-0703 – volume: 207 start-page: 633 issue: 2 year: 2010 ident: key2024113004264510300_ref028 article-title: Robust scheduling and robustness measures for the discrete time/cost trade-off problem publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2010.05.046 – volume: 38 start-page: 715 issue: 8 year: 2020 ident: key2024113004264510300_ref005 article-title: Resource optimisation in line of balance scheduling publication-title: Construction Management and Economics doi: 10.1080/01446193.2019.1606924 – volume: 146 issue: 10 year: 2020 ident: key2024113004264510300_ref030 article-title: Enhanced repetitive-scheduling computation and visualization publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0001911 – volume: 142 issue: 5 year: 2016 ident: key2024113004264510300_ref037 article-title: Repetitive scheduling method: requirements, modeling, and implementation publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0001107 – volume: 22 start-page: 1 year: 2020 ident: key2024113004264510300_ref067 article-title: Optimizing non-unit repetitive project resource and scheduling by evolutionary algorithms publication-title: Operational Research doi: 10.1007/s12351-019-00544-7 – volume: 142 issue: 10 year: 2016 ident: key2024113004264510300_ref022 article-title: Exact time-cost tradeoff analysis in concurrency-based scheduling publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0001164 – volume: 147 issue: 7 year: 2021 ident: key2024113004264510300_ref004 article-title: Multiobjective optimization model for planning repetitive construction projects publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0002072 – volume: 23 start-page: 546 issue: 7 year: 2005 ident: key2024113004264510300_ref071 article-title: Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding publication-title: International Journal of Project Management doi: 10.1016/j.ijproman.2005.03.003 – volume: 71 start-page: 8267 year: 2024 ident: key2024113004264510300_ref079 article-title: Reactive scheduling for repetitive projects based on integrated crew interruption and soft logic strategies publication-title: IEEE Transactions on Engineering Management doi: 10.1109/TEM.2024.3394852 – volume: 24 start-page: 1271 issue: 12 year: 2024 ident: key2024113004264510300_ref076 article-title: Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy publication-title: International Journal of Construction Management doi: 10.1080/15623599.2023.2276650 – volume: 212 start-page: 386 issue: 2 year: 2011 ident: key2024113004264510300_ref012 article-title: Time-cost trade-off analysis of project networks in fuzzy environments publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2011.02.002 – volume: 145 issue: 2 year: 2019 ident: key2024113004264510300_ref062 article-title: Delay risk assessment of repetitive construction projects using Line-of-Balance scheduling and Monte Carlo Simulation publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0001595 – volume: 67 start-page: 287 issue: 4 year: 2021 ident: key2024113004264510300_ref038 article-title: Proactive scheduling of repetitive construction processes to reduce crews idle times and delays publication-title: Archives of Civil Engineering – volume: 26 start-page: 1294 issue: 7 year: 2019 ident: key2024113004264510300_ref055 article-title: Multi-objective optimization for repetitive scheduling under uncertainty publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-05-2018-0217 – volume: 29 start-page: 93 issue: 2 year: 2023 ident: key2024113004264510300_ref014 article-title: Resource leveling in repetitive construction projects with interruptions: an integrated approach publication-title: Journal of Civil Engineering and Management doi: 10.3846/jcem.2023.17568 – volume: 6 start-page: 73 issue: 1 year: 1959 ident: key2024113004264510300_ref011 article-title: Chance-constrained programming publication-title: Management Science doi: 10.1287/mnsc.6.1.73 – volume: 61 start-page: 1499 issue: 2 year: 2022 ident: key2024113004264510300_ref051 article-title: Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm publication-title: Alexandria Engineering Journal doi: 10.1016/j.aej.2021.06.058 – volume: 32 issue: 3 year: 2018 ident: key2024113004264510300_ref060 article-title: Space-time repetitive project scheduling considering location and congestion publication-title: Journal of Computing in Civil Engineering doi: 10.1061/(asce)cp.1943-5487.0000745 – volume: 10 start-page: 311 issue: 4-5 year: 2007 ident: key2024113004264510300_ref069 article-title: The discrete time/cost trade-off problem: extensions and heuristic algorithms publication-title: Journal of Scheduling doi: 10.1007/s10951-007-0031-y – volume: 23 start-page: 1447 issue: 9 year: 2021 ident: key2024113004264510300_ref026 article-title: Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost publication-title: International Journal of Construction Management doi: 10.1080/15623599.2021.1975078 – volume: 30 start-page: 872 issue: 11 year: 2015 ident: key2024113004264510300_ref052 article-title: The fuzzy project scheduling problem with minimal generalized precedence relations publication-title: Computer-Aided Civil and Infrastructure Engineering doi: 10.1111/mice.12166 – volume: 23 start-page: 782 issue: 6 year: 2016 ident: key2024113004264510300_ref008 article-title: Optimized scheduling and buffering of repetitive construction projects under uncertainty publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-05-2014-0069 – volume: 81 start-page: 411 year: 2017 ident: key2024113004264510300_ref021 article-title: Optimal crew routing for linear repetitive projects using graph theory publication-title: Automation in Construction doi: 10.1016/j.autcon.2017.03.007 – volume: 26 start-page: 2001 issue: 4 year: 2014 ident: key2024113004264510300_ref006 article-title: Resource-constrained project scheduling problem with multiple execution modes and fuzzy/crisp activity durations publication-title: Journal of Intelligent and Fuzzy Systems doi: 10.3233/ifs-130878 – volume: 32 issue: 4 year: 2016 ident: key2024113004264510300_ref034 article-title: Genetic algorithm–based method for the deadline problem in repetitive construction projects considering soft logic publication-title: Journal of Management in Engineering doi: 10.1061/(asce)me.1943-5479.0000426 – volume: 162 issue: 1 year: 2024 ident: key2024113004264510300_ref065 article-title: Customized particle swarm optimization for harmonizing multi-section construction projects publication-title: Automation in Construction doi: 10.1016/j.autcon.2024.105359 – volume: 124 year: 2021 ident: key2024113004264510300_ref031 article-title: Tetris-inspired approach for generating tightly-packed repetitive schedules publication-title: Automation in Construction doi: 10.1016/j.autcon.2021.103601 – volume: 24 start-page: 1671 issue: 6 year: 2020 ident: key2024113004264510300_ref047 article-title: A fixed start scheduling approach for repetitive construction projects publication-title: KSCE Journal of Civil Engineering doi: 10.1007/s12205-020-1429-8 – volume: 28 start-page: 422 issue: 6 year: 2022 ident: key2024113004264510300_ref063 article-title: Scheduling repetitive construction projects: structured literature review publication-title: Journal of Civil Engineering and Management doi: 10.3846/jcem.2022.16943 – volume: 105 year: 2019 ident: key2024113004264510300_ref020 article-title: Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects publication-title: Automation in Construction doi: 10.1016/j.autcon.2019.03.020 – volume: 164 year: 2024 ident: key2024113004264510300_ref044 article-title: A non-unit repetitive construction project scheduling with uncertainties publication-title: Automation in Construction doi: 10.1016/j.autcon.2024.105428 – volume: 25 start-page: 322 issue: 4 year: 2019 ident: key2024113004264510300_ref066 article-title: Multi-objective symbiotic organisms optimization for making time-cost tradeoffs in repetitive project scheduling problem publication-title: Journal of Civil Engineering and Management doi: 10.3846/jcem.2019.9681 – start-page: 180 year: 2024 ident: key2024113004264510300_ref001 article-title: Optimization of stochastic repetitive construction projects: minimizing duration uncertainties doi: 10.1061/9780784485231.022 – volume: 2017 start-page: 1 year: 2017 ident: key2024113004264510300_ref072 article-title: Resource leveling based on backward controlling activity in line of balance publication-title: Mathematical Problems in Engineering doi: 10.1155/2017/7545980 – volume: 29 start-page: 669 issue: 2 year: 2022 ident: key2024113004264510300_ref078 article-title: Time-cost optimization in repetitive project scheduling with limited resources publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-10-2020-0843 – volume: 45 start-page: 30 issue: 1 year: 2017 ident: key2024113004264510300_ref056 article-title: Integration of linear scheduling method and the critical chain project management publication-title: Canadian Journal of Civil Engineering doi: 10.1139/cjce-2017-0020 – volume: 6 start-page: 182 issue: 2 year: 2002 ident: key2024113004264510300_ref016 article-title: A fast and elitist multiobjective genetic algorithm: NSGA-II publication-title: IEEE Transactions on Evolutionary Computation doi: 10.1109/4235.996017 – year: 2024 ident: key2024113004264510300_ref035 article-title: Schedule-cost optimization in high-rise buildings considering uncertainty publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-12-2023-1217 – volume: 133 year: 2022 ident: key2024113004264510300_ref029 article-title: Schedule optimization for scattered repetitive projects publication-title: Automation in Construction doi: 10.1016/j.autcon.2021.104042 – volume: 50 start-page: 172 issue: 3 year: 2023 ident: key2024113004264510300_ref050 article-title: Enhanced repetitive scheduling formulation for meeting deadlines and resource constraints in linear and scattered projects publication-title: Canadian Journal of Civil Engineering doi: 10.1139/cjce-2022-0029 – volume: 55 start-page: 183 issue: 1 year: 2008 ident: key2024113004264510300_ref013 article-title: A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling publication-title: Computers and Industrial Engineering doi: 10.1016/j.cie.2007.11.017 – volume: 9 start-page: 73 issue: 2 year: 2021 ident: key2024113004264510300_ref081 article-title: Modelling the uncertainty of cost and time in highway projects publication-title: Infrastructure Asset Management – volume: 142 issue: 10 year: 2016 ident: key2024113004264510300_ref048 article-title: Construction cost and duration uncertainty model: application to high-speed rail line project publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0001161 – volume: 34 start-page: 301 issue: 2 year: 2010 ident: key2024113004264510300_ref040 article-title: Fuzzy project scheduling problem and its hybrid intelligent algorithm publication-title: Applied Mathematical Modelling doi: 10.1016/j.apm.2009.04.011 – volume: 139 year: 2022 ident: key2024113004264510300_ref064 article-title: Harmonizing construction processes in repetitive construction projects with multiple buildings publication-title: Automation in Construction doi: 10.1016/j.autcon.2022.104266 – volume: 94 start-page: 227 issue: 2 year: 1998 ident: key2024113004264510300_ref042 article-title: Chance constrained programming with fuzzy parameters publication-title: Fuzzy Sets and Systems doi: 10.1016/s0165-0114(96)00236-9 – volume: 14 start-page: 2073 issue: 7 year: 2024 ident: key2024113004264510300_ref043 article-title: A constraint programming approach for discrete time–cost tradeoff problems in a time-constrained activity network publication-title: Buildings doi: 10.3390/buildings14072073 – start-page: 311 year: 2022 ident: key2024113004264510300_ref080 article-title: Global and local risk factors causing correlation between activities in fuzzy linear schedules publication-title: Construction Research Congress 2022 – volume: 111 start-page: 493 issue: 2 year: 2008 ident: key2024113004264510300_ref041 article-title: A tabu search procedure for developing robust predictive project schedules publication-title: International Journal of Production Economics doi: 10.1016/j.ijpe.2007.02.003 – volume: 43 start-page: 949 issue: 11 year: 2016 ident: key2024113004264510300_ref049 article-title: Accelerating repetitive construction projects: with uncertainty and contractors’ judgment publication-title: Canadian Journal of Civil Engineering doi: 10.1139/cjce-2014-0347 – volume: 109 year: 2020 ident: key2024113004264510300_ref075 article-title: A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic publication-title: Automation in Construction doi: 10.1016/j.autcon.2019.102990 – volume: 28 start-page: 1615 issue: 6 year: 2021 ident: key2024113004264510300_ref025 article-title: Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-05-2020-0304 – volume: 147 issue: 3 year: 2021 ident: key2024113004264510300_ref039 article-title: Fuzzy linear and repetitive scheduling for construction projects publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0001996 – volume: 28 start-page: 1517 issue: 6 year: 2021 ident: key2024113004264510300_ref054 article-title: Optimized crew selection for scheduling of repetitive projects publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-10-2019-0590 – volume: 23 start-page: 3265 issue: 8 year: 2019 ident: key2024113004264510300_ref032 article-title: Resource-constrained time-cost tradeoff for repetitive construction projects publication-title: KSCE Journal of Civil Engineering doi: 10.1007/s12205-019-0151-x – volume: 28 start-page: 679 issue: 9 year: 2013 ident: key2024113004264510300_ref015 article-title: Resource leveling in line-of-balance scheduling publication-title: Computer-Aided Civil and Infrastructure Engineering doi: 10.1111/mice.12038 – start-page: 1731 year: 2006 ident: key2024113004264510300_ref036 article-title: Sequence step algorithm for continuous resource utilization in probabilistic repetitive projects – volume: 137 start-page: 561 issue: 7 year: 2011 ident: key2024113004264510300_ref045 article-title: Fuzzy repetitive scheduling method for projects with repeating activities publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0000319 – volume: 148 issue: 9 year: 2022 ident: key2024113004264510300_ref010 article-title: Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0002348 – volume: 67 start-page: 101 issue: 1 year: 1994 ident: key2024113004264510300_ref024 article-title: Fuzzy project scheduling system for software development publication-title: Fuzzy Sets and Systems doi: 10.1016/0165-0114(94)90211-9 – volume: 18 start-page: 942 issue: 7 year: 2009 ident: key2024113004264510300_ref033 article-title: Resource-constrained scheduling for continuous repetitive projects with time-based production units publication-title: Automation in Construction doi: 10.1016/j.autcon.2009.04.006 – volume: 34 issue: 1 year: 2018 ident: key2024113004264510300_ref077 article-title: Modeling and solving the deadline satisfaction problem in line-of-balance scheduling publication-title: Journal of Management in Engineering doi: 10.1061/(asce)me.1943-5479.0000565 – volume: 3 start-page: 183 year: 2018 ident: key2024113004264510300_ref023 article-title: Resource-constrained project scheduling problem: review of past and recent developments publication-title: Journal of Project Management – volume: 137 start-page: 574 issue: 8 year: 2011 ident: key2024113004264510300_ref017 article-title: Linear scheduling model with varying production rates publication-title: Journal of Construction Engineering and Management doi: 10.1061/(asce)co.1943-7862.0000320 – volume: 25 start-page: 263 issue: 3 year: 2003 ident: key2024113004264510300_ref009 article-title: An electromagnetism-like mechanism for global optimization publication-title: Journal of Global Optimization doi: 10.1023/a:1022452626305 – volume: 12 start-page: 73 issue: 4 year: 2017 ident: key2024113004264510300_ref061 article-title: PlatEMO: a MATLAB platform for evolutionary multi-objective optimization publication-title: IEEE Computational Intelligence Magazine doi: 10.1109/mci.2017.2742868 – volume: 33 start-page: 124 issue: 2 year: 2018 ident: key2024113004264510300_ref059 article-title: Scheduling optimization of linear schedule with constraint programming publication-title: Computer-Aided Civil and Infrastructure Engineering doi: 10.1111/mice.12277 – volume: 33 start-page: 655 issue: 8 year: 2018 ident: key2024113004264510300_ref019 article-title: The multimode resource-constrained project scheduling problem for repetitive activities in construction projects publication-title: Computer-Aided Civil and Infrastructure Engineering doi: 10.1111/mice.12356 – volume: 37 issue: 4 year: 2021 ident: key2024113004264510300_ref046 article-title: Linear optimization model to minimize total cost of repetitive construction projects and identify order of units publication-title: Journal of Management in Engineering doi: 10.1061/(asce)me.1943-5479.0000936 – volume: 150 issue: 5 year: 2024 ident: key2024113004264510300_ref068 article-title: Augmented time-cost trade-off optimization using particle swarm optimization publication-title: Journal of Construction Engineering and Management doi: 10.1061/jcemd4.coeng-14314 – volume: 223 year: 2020 ident: key2024113004264510300_ref027 article-title: A classification and review of approaches and methods for modeling uncertainty in projects publication-title: International Journal of Production Economics doi: 10.1016/j.ijpe.2019.107522 – volume: 11 start-page: 150 year: 2005 ident: key2024113004264510300_ref053 article-title: Survey on multiobjective evolutionary and real coded genetic algorithms publication-title: Complexity International – volume: 96 start-page: 175 issue: 2 year: 2005 ident: key2024113004264510300_ref002 article-title: A bi-objective model for robust resource-constrained project scheduling publication-title: International Journal of Production Economics doi: 10.1016/j.ijpe.2004.04.002 – year: 2013 ident: key2024113004264510300_ref007 article-title: Fuzzy dynamic programming for optimized scheduling of repetitive construction projects – volume: 33 start-page: 864 issue: 10 year: 2018 ident: key2024113004264510300_ref058 article-title: Resource leveling based on line of balance and constraint programming publication-title: Computer-Aided Civil and Infrastructure Engineering doi: 10.1111/mice.12383 – volume: 251 start-page: 22 issue: 1 year: 2016 ident: key2024113004264510300_ref070 article-title: Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP publication-title: European Journal of Operational Research doi: 10.1016/j.ejor.2015.10.059 – volume: 27 start-page: 3095 issue: 10 year: 2020 ident: key2024113004264510300_ref073 article-title: Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty publication-title: Engineering Construction and Architectural Management doi: 10.1108/ecam-08-2019-0458 |
| SSID | ssj0018453 |
| Score | 2.347856 |
| SourceID | crossref |
| SourceType | Index Database |
| Title | Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs |
| WOSCitedRecordID | wos001366640000001&url=https%3A%2F%2Fcvtisr.summon.serialssolutions.com%2F%23%21%2Fsearch%3Fho%3Df%26include.ft.matches%3Dt%26l%3Dnull%26q%3D |
| hasFullText | 1 |
| inHoldings | 1 |
| isFullTextHit | |
| isPrint | |
| journalDatabaseRights | – providerCode: PRVMCB databaseName: Emerald Management 120 customDbUrl: eissn: 1365-232X dateEnd: 99991231 omitProxy: false ssIdentifier: ssj0018453 issn: 0969-9988 databaseCode: TMT dateStart: 20030101 isFulltext: true titleUrlDefault: https://www.emerald.com/insight providerName: Emerald – providerCode: PRVPQU databaseName: ABI/INFORM Collection customDbUrl: eissn: 1365-232X dateEnd: 20241209 omitProxy: false ssIdentifier: ssj0018453 issn: 0969-9988 databaseCode: 7WY dateStart: 20030701 isFulltext: true titleUrlDefault: https://www.proquest.com/abicomplete providerName: ProQuest – providerCode: PRVPQU databaseName: ABI/INFORM Global customDbUrl: eissn: 1365-232X dateEnd: 20241209 omitProxy: false ssIdentifier: ssj0018453 issn: 0969-9988 databaseCode: M0C dateStart: 20030701 isFulltext: true titleUrlDefault: https://search.proquest.com/abiglobal providerName: ProQuest – providerCode: PRVPQU databaseName: Engineering Database customDbUrl: eissn: 1365-232X dateEnd: 20241209 omitProxy: false ssIdentifier: ssj0018453 issn: 0969-9988 databaseCode: M7S dateStart: 20030701 isFulltext: true titleUrlDefault: http://search.proquest.com providerName: ProQuest – providerCode: PRVPQU databaseName: ProQuest Central customDbUrl: eissn: 1365-232X dateEnd: 20241209 omitProxy: false ssIdentifier: ssj0018453 issn: 0969-9988 databaseCode: BENPR dateStart: 20030701 isFulltext: true titleUrlDefault: https://www.proquest.com/central providerName: ProQuest – providerCode: PRVPQU databaseName: Science Database (ProQuest) customDbUrl: eissn: 1365-232X dateEnd: 20241209 omitProxy: false ssIdentifier: ssj0018453 issn: 0969-9988 databaseCode: M2P dateStart: 20030701 isFulltext: true titleUrlDefault: https://search.proquest.com/sciencejournals providerName: ProQuest |
| link | http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwrV1LS8NAEF5qEdSDj6r4LHvwJCzdNJtk91hKiwdbPVToLWSzG1Q0KU0U7K93Jo_agxfBW0iWEGY3M_PN4xtCboSwTuwJw_r9mDPhGM2k9iRDsq9EuBoQWTm15D6YTuV8rh5b5KHphSnLKqtwTKmnX9IcQWoPC7dBC68JB3B6zWg4mGDqHieAM7R7PQxZ956L97dSJ3P8UWeT2TqrIEXFSql8xQBmyDrL-eu7NuzUhsEZH_z7px6S_dr3pIPqsByRlk07ZKdpTc47ZG-DnfCYvI4_VqsvurQL7EQDrUgBCYNlwgZ2Cr4ujbMf-llah3Ty8i729uEqLFyHJw2ZbU6j1FAcZ8_iLC9osYyMzZIkPyFP49FseMfq0QwsdlRQsAC0Ing6IlFccy_mlkcA7IwvrSeVNo5IkDheKc-CeyITHYOf5bnGiaz2k0BJ95S00yy1Z4T6RgNkE9oznhVuwpURgAkB8EvQDm7gnpPbZiPCRcXAEZbIhcsQxRpyFaJYQxTrxV8WX5JduC5pG3n_irRBYvaabMefxUu-7JKtCR92ywP0DX2PzXM |
| linkProvider | Emerald |
| openUrl | ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Fuzzy+repetitive+scheduling+for+construction+projects+considering+risk+preferences+and+time-cost+tradeoffs&rft.jtitle=Engineering%2C+construction%2C+and+architectural+management&rft.au=Zou%2C+Xin&rft.au=Zhang%2C+Lihui&rft.date=2024-12-02&rft.issn=0969-9988&rft.eissn=1365-232X&rft_id=info:doi/10.1108%2FECAM-09-2023-0910&rft.externalDBID=n%2Fa&rft.externalDocID=10_1108_ECAM_09_2023_0910 |
| thumbnail_l | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0969-9988&client=summon |
| thumbnail_m | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0969-9988&client=summon |
| thumbnail_s | http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0969-9988&client=summon |