Zou, X., & Zhang, L. (2024, December 2). Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs. Engineering, construction, and architectural management. https://doi.org/10.1108/ECAM-09-2023-0910
Chicago Style (17th ed.) CitationZou, Xin, and Lihui Zhang. "Fuzzy Repetitive Scheduling for Construction Projects Considering Risk Preferences and Time-cost Tradeoffs." Engineering, Construction, and Architectural Management 2 Dec. 2024. https://doi.org/10.1108/ECAM-09-2023-0910.
MLA (9th ed.) CitationZou, Xin, and Lihui Zhang. "Fuzzy Repetitive Scheduling for Construction Projects Considering Risk Preferences and Time-cost Tradeoffs." Engineering, Construction, and Architectural Management, 2 Dec. 2024, https://doi.org/10.1108/ECAM-09-2023-0910.