Citace podle APA (7th ed.)

Zou, X., & Zhang, L. (2024, December 2). Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs. Engineering, construction, and architectural management. https://doi.org/10.1108/ECAM-09-2023-0910

Citace podle Chicago (17th ed.)

Zou, Xin, a Lihui Zhang. "Fuzzy Repetitive Scheduling for Construction Projects Considering Risk Preferences and Time-cost Tradeoffs." Engineering, Construction, and Architectural Management 2 Dec. 2024. https://doi.org/10.1108/ECAM-09-2023-0910.

Citace podle MLA (9th ed.)

Zou, Xin, a Lihui Zhang. "Fuzzy Repetitive Scheduling for Construction Projects Considering Risk Preferences and Time-cost Tradeoffs." Engineering, Construction, and Architectural Management, 2 Dec. 2024, https://doi.org/10.1108/ECAM-09-2023-0910.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..