Coordinated order scheduling and outsourcing on dedicated parallel machines

In this paper we investigate two order scheduling problems with bundled operations on m dedicated parallel machines when outsourcing is allowed. In the first problem, the objective is to minimize the makespan of the accepted jobs (orders) subject to the constraint that the total rejection (outsourci...

Celý popis

Uloženo v:
Podrobná bibliografie
Vydáno v:European journal of operational research
Hlavní autoři: Ou, Jinwen, Li, Weidong, Zhong, Xueling
Médium: Journal Article
Jazyk:angličtina
Vydáno: Elsevier B.V 01.09.2025
Témata:
ISSN:0377-2217
On-line přístup:Získat plný text
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Abstract In this paper we investigate two order scheduling problems with bundled operations on m dedicated parallel machines when outsourcing is allowed. In the first problem, the objective is to minimize the makespan of the accepted jobs (orders) subject to the constraint that the total rejection (outsourcing) cost is no more than a budget. In the second problem, the objective is to minimize the makespan of accepted jobs plus the total rejection cost of rejected jobs. We show that the first problem cannot be approximated within a factor less than 2 in polynomial time, unless P = NP. For each of the two problems when m is fixed, we present a quasi-linear-time FPTAS (fully polynomial time approximation scheme). For the second problem when m=2, we develop a faster FPTAS by an interesting problem transformation and advanced rounding method. •Coordinated order scheduling and outsourcing on dedicated machines in parallel.•No polynomial-time (2-ϵ)-approximation algorithm for the bounded problem.•Quasi-linear-time FPTASes when the number of machines is fixed.•Faster FPTAS for the unbounded problem with two machines.•Interesting problem transformation and advanced rounding method.
AbstractList In this paper we investigate two order scheduling problems with bundled operations on m dedicated parallel machines when outsourcing is allowed. In the first problem, the objective is to minimize the makespan of the accepted jobs (orders) subject to the constraint that the total rejection (outsourcing) cost is no more than a budget. In the second problem, the objective is to minimize the makespan of accepted jobs plus the total rejection cost of rejected jobs. We show that the first problem cannot be approximated within a factor less than 2 in polynomial time, unless P = NP. For each of the two problems when m is fixed, we present a quasi-linear-time FPTAS (fully polynomial time approximation scheme). For the second problem when m=2, we develop a faster FPTAS by an interesting problem transformation and advanced rounding method. •Coordinated order scheduling and outsourcing on dedicated machines in parallel.•No polynomial-time (2-ϵ)-approximation algorithm for the bounded problem.•Quasi-linear-time FPTASes when the number of machines is fixed.•Faster FPTAS for the unbounded problem with two machines.•Interesting problem transformation and advanced rounding method.
Author Zhong, Xueling
Li, Weidong
Ou, Jinwen
Author_xml – sequence: 1
  givenname: Jinwen
  orcidid: 0000-0002-7419-3808
  surname: Ou
  fullname: Ou, Jinwen
  email: toujinwen@jnu.edu.cn
  organization: School of Management, Jinan University, Guangzhou, 510632, People’s Republic of China
– sequence: 2
  givenname: Weidong
  surname: Li
  fullname: Li, Weidong
  email: weidong@ynu.edu.cn
  organization: School of Mathematics and Statistics, Yunnan University, Kunming 650504, People’s Republic of China
– sequence: 3
  givenname: Xueling
  orcidid: 0000-0002-5702-5837
  surname: Zhong
  fullname: Zhong, Xueling
  email: tzhongxl@gduf.edu.cn
  organization: School of Computer Science, Guangdong University of Finance, Guangzhou 510521, People’s Republic of China
BookMark eNp9kMlOwzAQQH0oEm3hBzjlBxK8xonEBUVsohIXOFuOPaaOUruyUyT-noRy5jSL5s2M3gatQgyA0A3BFcGkvh0qGGKqKKaiwk2FmVihNWZSlpQSeYk2OQ8YYyKIWKPXLsZkfdAT2GLOIBXZ7MGeRh8-Cx3m5mnK8ZTMUsdQWLDe_E4fddLjCGNx0GbvA-QrdOH0mOH6L27Rx-PDe_dc7t6eXrr7XWlI3Uwloy2uec9FQzn0Qoum5bWWxrYSS244s5owJnrpDNjeAMEtZcRZajl3jjm2RfS816SYcwKnjskfdPpWBKtFgRrUokAtChRu1Kxghu7OEMyffXlIKhsPYT7hE5hJ2ej_w38A6TBqHA
Cites_doi 10.1007/s00291-015-0409-8
10.1007/s10878-023-01032-7
10.1016/j.ejor.2025.01.034
10.1137/S0895480196300522
10.1016/0167-6377(93)90041-E
10.1007/s10288-016-0303-5
10.1007/s10288-016-0339-6
10.1016/j.ejor.2021.11.043
10.1007/s10951-020-00657-4
10.1007/s10878-020-00649-2
10.1016/j.ejor.2010.09.042
10.1016/0377-2217(93)90347-P
10.1007/s11590-023-02073-x
10.1145/3618260.3649730
10.1016/j.ejor.2014.09.028
10.1016/S0377-2217(99)00261-1
10.1016/j.ejor.2017.04.036
10.1016/j.tcs.2015.10.007
10.1007/s40305-022-00430-8
10.1007/s10288-017-0356-0
10.1016/j.ejor.2008.10.006
10.1016/j.tcs.2010.02.006
10.1007/s10951-012-0303-z
10.1016/S0377-2217(00)00229-0
10.1287/opre.43.2.346
10.1080/00207160.2019.1711373
10.1016/j.ejor.2018.04.033
10.1145/3577530.3577568
10.1007/s00453-016-0116-0
ContentType Journal Article
Copyright 2025 Elsevier B.V.
Copyright_xml – notice: 2025 Elsevier B.V.
DBID AAYXX
CITATION
DOI 10.1016/j.ejor.2025.08.035
DatabaseName CrossRef
DatabaseTitle CrossRef
DatabaseTitleList
DeliveryMethod fulltext_linktorsrc
Discipline Engineering
Computer Science
Business
ExternalDocumentID 10_1016_j_ejor_2025_08_035
S0377221725006733
GroupedDBID --K
--M
-~X
.DC
.~1
0R~
1B1
1OL
1RT
1~.
1~5
29G
4.4
41~
457
4G.
5GY
5VS
6OB
7-5
71M
8P~
9JN
9JO
AAAKF
AAAKG
AABNK
AAEDT
AAEDW
AAIKJ
AAKOC
AALRI
AAOAW
AAQFI
AAQXK
AARIN
AATTM
AAXKI
AAXUO
AAYFN
AAYWO
ABAOU
ABBOA
ABFNM
ABFRF
ABJNI
ABMAC
ABUCO
ABWVN
ABXDB
ACDAQ
ACGFO
ACGFS
ACIWK
ACLOT
ACNCT
ACNNM
ACRLP
ACRPL
ACVFH
ACZNC
ADBBV
ADCNI
ADEZE
ADGUI
ADIYS
ADJOM
ADMUD
ADNMO
ADXHL
AEBSH
AEFWE
AEIPS
AEKER
AENEX
AEUPX
AFFNX
AFJKZ
AFPUW
AFTJW
AGHFR
AGQPQ
AGUBO
AGYEJ
AHHHB
AHZHX
AI.
AIALX
AIEXJ
AIGII
AIGVJ
AIIUN
AIKHN
AITUG
AKBMS
AKRWK
AKYEP
ALMA_UNASSIGNED_HOLDINGS
AMRAJ
ANKPU
AOUOD
APLSM
APXCP
ARUGR
ASPBG
AVWKF
AXJTR
AZFZN
BKOJK
BKOMP
BLXMC
CS3
DU5
EBS
EFJIC
EFKBS
EFLBG
EJD
EO8
EO9
EP2
EP3
F5P
FDB
FEDTE
FGOYB
FIRID
FNPLU
FYGXN
G-Q
GBLVA
GBOLZ
HAMUX
HVGLF
HZ~
IHE
J1W
KOM
LY1
M41
MHUIS
MO0
MS~
N9A
O-L
O9-
OAUVE
OZT
P-8
P-9
P2P
PC.
PQQKQ
Q38
R2-
ROL
RPZ
RXW
SCC
SDF
SDG
SDP
SDS
SES
SEW
SPC
SPCBC
SSB
SSD
SSV
SSW
SSZ
T5K
TAE
TN5
U5U
VH1
WUQ
XPP
ZMT
~02
~G-
~HD
9DU
AAYXX
CITATION
ID FETCH-LOGICAL-c168t-329064b45824eb5a58946a7cd97074c43da1335b7fcedbce109231fd2d44ff3f3
ISSN 0377-2217
IngestDate Sat Nov 29 07:27:07 EST 2025
Sat Oct 11 16:52:09 EDT 2025
IsPeerReviewed true
IsScholarly true
Keywords Bundled operation
Dedicated machines
Approximation algorithm
FPTAS
Order scheduling
Language English
LinkModel OpenURL
MergedId FETCHMERGED-LOGICAL-c168t-329064b45824eb5a58946a7cd97074c43da1335b7fcedbce109231fd2d44ff3f3
ORCID 0000-0002-7419-3808
0000-0002-5702-5837
ParticipantIDs crossref_primary_10_1016_j_ejor_2025_08_035
elsevier_sciencedirect_doi_10_1016_j_ejor_2025_08_035
PublicationCentury 2000
PublicationDate 2025-9-00
PublicationDateYYYYMMDD 2025-09-01
PublicationDate_xml – month: 09
  year: 2025
  text: 2025-9-00
PublicationDecade 2020
PublicationTitle European journal of operational research
PublicationYear 2025
Publisher Elsevier B.V
Publisher_xml – name: Elsevier B.V
References Kellerer, Pferschy, Pisinger (b15) 2004
Megiddo, Tamir (b19) 1993; 13
(pp. 283–294).
Ou (b20) 2020; 23
Caprara, Kellerer, Pferschy, Pisinger (b6) 2000; 123
Chen, L., Lian, J. Y., Mao, Y. C., & Zhang, G. C. (2024). A nearly quadratic-time FPTAS for knapsack. In
Zhang, Lu, Yuan (b30) 2016; 38
Agnetis, Billaut, Pinedo, Shabtay (b1) 2025; 327
Dai, Li (b9) 2020; 97
Bansal, Oosterwijk, Vredeveld, Zwaan (b2) 2016; 76
Zhang, Lu, Yuan (b28) 2009; 198
Li, Cui (b16) 2018; 16
Garey, Johnson (b12) 1979
Wagneur, Sriskandarajah (b27) 1993; 71
Shabtay, Gaspar, Kaspi (b24) 2013; 16
Framinan, Perez-Gonzalez, Fernandez-Viagas (b10) 2019; 273
He, Leung, Lee, Pinedo (b13) 2016; 14
Hou, Zheng, Liu, Du, Gao (b14) 2024; 18
Ou, Zhong (b21) 2015; 241
Frederix (b11) 2001; 129
Sun, R. Q., & Deng, B. (2022). W-prize-collecting scheduling problem on a single machine. In
(pp. 237–242).
Chen, Li (b7) 2020; 40
Li, Li, Zhang, Chen (b17) 2015; 607
Boysen, Schulze, Scholl (b4) 2022; 301
Zheng, Gao, Liu, Hou (b31) 2024; 12
Slotnick (b25) 2011; 212
Potts, Sevastjanov, Strusevich, Van Wassenhove, Zwaneveld (b23) 1995; 43
Ou, Zhong (b22) 2017; 262
Bartal, Leonardi, Marchetti-Spaccamela, Sgall, Stougie (b3) 2000; 13
Zhong, Ou (b32) 2017; 15
Liu, Xiao, Li, Zhu, Ma (b18) 2023; 45
Zhang, Lu, Yuan (b29) 2010; 411
Cacchiani, Iori, Locatelli, Martello (b5) 2022; 143
Cacchiani (10.1016/j.ejor.2025.08.035_b5) 2022; 143
Kellerer (10.1016/j.ejor.2025.08.035_b15) 2004
He (10.1016/j.ejor.2025.08.035_b13) 2016; 14
Garey (10.1016/j.ejor.2025.08.035_b12) 1979
Liu (10.1016/j.ejor.2025.08.035_b18) 2023; 45
10.1016/j.ejor.2025.08.035_b26
Zhang (10.1016/j.ejor.2025.08.035_b30) 2016; 38
Ou (10.1016/j.ejor.2025.08.035_b20) 2020; 23
Li (10.1016/j.ejor.2025.08.035_b17) 2015; 607
Ou (10.1016/j.ejor.2025.08.035_b21) 2015; 241
Slotnick (10.1016/j.ejor.2025.08.035_b25) 2011; 212
Zhang (10.1016/j.ejor.2025.08.035_b29) 2010; 411
10.1016/j.ejor.2025.08.035_b8
Megiddo (10.1016/j.ejor.2025.08.035_b19) 1993; 13
Ou (10.1016/j.ejor.2025.08.035_b22) 2017; 262
Zhong (10.1016/j.ejor.2025.08.035_b32) 2017; 15
Bansal (10.1016/j.ejor.2025.08.035_b2) 2016; 76
Chen (10.1016/j.ejor.2025.08.035_b7) 2020; 40
Zhang (10.1016/j.ejor.2025.08.035_b28) 2009; 198
Agnetis (10.1016/j.ejor.2025.08.035_b1) 2025; 327
Boysen (10.1016/j.ejor.2025.08.035_b4) 2022; 301
Framinan (10.1016/j.ejor.2025.08.035_b10) 2019; 273
Zheng (10.1016/j.ejor.2025.08.035_b31) 2024; 12
Frederix (10.1016/j.ejor.2025.08.035_b11) 2001; 129
Bartal (10.1016/j.ejor.2025.08.035_b3) 2000; 13
Dai (10.1016/j.ejor.2025.08.035_b9) 2020; 97
Li (10.1016/j.ejor.2025.08.035_b16) 2018; 16
Shabtay (10.1016/j.ejor.2025.08.035_b24) 2013; 16
Caprara (10.1016/j.ejor.2025.08.035_b6) 2000; 123
Potts (10.1016/j.ejor.2025.08.035_b23) 1995; 43
Wagneur (10.1016/j.ejor.2025.08.035_b27) 1993; 71
Hou (10.1016/j.ejor.2025.08.035_b14) 2024; 18
References_xml – volume: 15
  start-page: 387
  year: 2017
  end-page: 406
  ident: b32
  article-title: Improved approximation algorithms for parallel machine scheduling with release dates and rejection
  publication-title: 4OR. A Quarterly Journal of Operations Research
– volume: 76
  start-page: 1077
  year: 2016
  end-page: 1096
  ident: b2
  article-title: Approximating vector scheduling: Almost matching upper and lower bounds
  publication-title: Algorithmica
– reference: Chen, L., Lian, J. Y., Mao, Y. C., & Zhang, G. C. (2024). A nearly quadratic-time FPTAS for knapsack. In
– volume: 97
  start-page: 2507
  year: 2020
  end-page: 2515
  ident: b9
  article-title: Vector scheduling with rejection on two machines
  publication-title: International Journal of Computer Mathematics
– volume: 607
  start-page: 181
  year: 2015
  end-page: 192
  ident: b17
  article-title: Penalty cost constrained identical parallel machine scheduling problem
  publication-title: Theoretical Computer Science
– reference: Sun, R. Q., & Deng, B. (2022). W-prize-collecting scheduling problem on a single machine. In
– volume: 273
  start-page: 401
  year: 2019
  end-page: 417
  ident: b10
  article-title: Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures
  publication-title: European Journal of Operational Research
– volume: 241
  start-page: 653
  year: 2015
  end-page: 661
  ident: b21
  article-title: An improved heuristic for parallel machine scheduling with rejection
  publication-title: European Journal of Operational Research
– reference: (pp. 283–294).
– volume: 212
  start-page: 1
  year: 2011
  end-page: 11
  ident: b25
  article-title: Order acceptance and scheduling: A taxonomy and review
  publication-title: European Journal of Operational Research
– volume: 43
  start-page: 346
  year: 1995
  end-page: 355
  ident: b23
  article-title: The two-stage assembly scheduling problem: Complexity and approximation
  publication-title: Operations Research
– volume: 123
  start-page: 333
  year: 2000
  end-page: 345
  ident: b6
  article-title: Approximation algorithms for knapsack problems with cardinality constraints
  publication-title: European Journal of Operational Research
– volume: 71
  start-page: 366
  year: 1993
  end-page: 378
  ident: b27
  article-title: Openshops with jobs overlap
  publication-title: European Journal of Operational Research
– volume: 12
  start-page: 495
  year: 2024
  end-page: 504
  ident: b31
  article-title: An approximation algorithm for the parallel-machine customer order scheduling with delivery time and submodular rejection penalties
  publication-title: Journal of the Operations Research Society of China
– volume: 262
  start-page: 904
  year: 2017
  end-page: 907
  ident: b22
  article-title: Bicriteria order acceptance and scheduling with consideration of fill rate
  publication-title: European Journal of Operational Research
– reference: (pp. 237–242).
– volume: 411
  start-page: 1877
  year: 2010
  end-page: 1882
  ident: b29
  article-title: Single-machine scheduling under the job rejection constraint
  publication-title: Theoretical Computer Science
– volume: 13
  start-page: 203
  year: 1993
  end-page: 211
  ident: b19
  article-title: Linear time algorithms for some separable quadratic programming problems
  publication-title: Operations Research Letters
– volume: 198
  start-page: 975
  year: 2009
  end-page: 978
  ident: b28
  article-title: Single machine scheduling with release dates and rejection
  publication-title: European Journal of Operational Research
– volume: 301
  start-page: 797
  year: 2022
  end-page: 814
  ident: b4
  article-title: Assembly line balancing: What happened in the last fifteen years?
  publication-title: European Journal of Operational Research
– volume: 38
  start-page: 519
  year: 2016
  end-page: 529
  ident: b30
  article-title: Two-machine open-shop scheduling with rejection to minimize the makespan
  publication-title: OR Spectrum
– volume: 16
  start-page: 95
  year: 2018
  end-page: 104
  ident: b16
  article-title: Vector scheduling with rejection on a single machine
  publication-title: 4OR. A Quarterly Journal of Operations Research
– volume: 23
  start-page: 525
  year: 2020
  end-page: 538
  ident: b20
  article-title: Near-linear-time approximation algorithms for scheduling a batch-processing machine with setups and job rejection
  publication-title: Journal of Scheduling
– volume: 14
  start-page: 41
  year: 2016
  end-page: 55
  ident: b13
  article-title: Improved algorithms for single machine scheduling with release dates and rejections
  publication-title: 4OR. A Quarterly Journal of Operations Research
– volume: 13
  start-page: 64
  year: 2000
  end-page: 78
  ident: b3
  article-title: Multi-processor scheduling with rejection
  publication-title: SIAM Journal on Discrete Mathematics
– volume: 45
  year: 2023
  ident: b18
  article-title: Algorithms for single machine scheduling problem with release dates and submodular penalties
  publication-title: Journal of Combinatorial Optimization
– volume: 16
  start-page: 3
  year: 2013
  end-page: 28
  ident: b24
  article-title: A survey on offline scheduling with rejection
  publication-title: Journal of Scheduling
– volume: 143
  year: 2022
  ident: b5
  article-title: Knapsack problems – An overview of recent advances. Part II: Multiple, multidimensional, and quadratic knapsack problems
  publication-title: Computers & Operations Research
– volume: 40
  start-page: 1044
  year: 2020
  end-page: 1064
  ident: b7
  article-title: Minimizing maximum delivery completion time for order scheduling with rejection
  publication-title: Journal of Combinatorial Optimization
– volume: 129
  start-page: 317
  year: 2001
  end-page: 325
  ident: b11
  article-title: An extended enterprise planning methodology for the discrete manufacturing industry
  publication-title: European Journal of Operational Research
– year: 2004
  ident: b15
  article-title: Knapsack problems
– volume: 18
  start-page: 1747
  year: 2024
  end-page: 1754
  ident: b14
  article-title: Improved approximation algorithm for the parallel machine customer order scheduling with delivery time and submodular rejection penalties
  publication-title: Optimization Letters
– volume: 327
  start-page: 367
  year: 2025
  end-page: 393
  ident: b1
  article-title: Fifty years of research in scheduling – Theory and applications
  publication-title: European Journal of Operational Research
– year: 1979
  ident: b12
  article-title: Computers and intractability: a guide to the theory of NP-completeness
– volume: 38
  start-page: 519
  year: 2016
  ident: 10.1016/j.ejor.2025.08.035_b30
  article-title: Two-machine open-shop scheduling with rejection to minimize the makespan
  publication-title: OR Spectrum
  doi: 10.1007/s00291-015-0409-8
– volume: 143
  year: 2022
  ident: 10.1016/j.ejor.2025.08.035_b5
  article-title: Knapsack problems – An overview of recent advances. Part II: Multiple, multidimensional, and quadratic knapsack problems
  publication-title: Computers & Operations Research
– volume: 45
  year: 2023
  ident: 10.1016/j.ejor.2025.08.035_b18
  article-title: Algorithms for single machine scheduling problem with release dates and submodular penalties
  publication-title: Journal of Combinatorial Optimization
  doi: 10.1007/s10878-023-01032-7
– year: 2004
  ident: 10.1016/j.ejor.2025.08.035_b15
– volume: 327
  start-page: 367
  issue: 2
  year: 2025
  ident: 10.1016/j.ejor.2025.08.035_b1
  article-title: Fifty years of research in scheduling – Theory and applications
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2025.01.034
– volume: 13
  start-page: 64
  issue: 1
  year: 2000
  ident: 10.1016/j.ejor.2025.08.035_b3
  article-title: Multi-processor scheduling with rejection
  publication-title: SIAM Journal on Discrete Mathematics
  doi: 10.1137/S0895480196300522
– volume: 13
  start-page: 203
  issue: 4
  year: 1993
  ident: 10.1016/j.ejor.2025.08.035_b19
  article-title: Linear time algorithms for some separable quadratic programming problems
  publication-title: Operations Research Letters
  doi: 10.1016/0167-6377(93)90041-E
– volume: 14
  start-page: 41
  year: 2016
  ident: 10.1016/j.ejor.2025.08.035_b13
  article-title: Improved algorithms for single machine scheduling with release dates and rejections
  publication-title: 4OR. A Quarterly Journal of Operations Research
  doi: 10.1007/s10288-016-0303-5
– volume: 15
  start-page: 387
  year: 2017
  ident: 10.1016/j.ejor.2025.08.035_b32
  article-title: Improved approximation algorithms for parallel machine scheduling with release dates and rejection
  publication-title: 4OR. A Quarterly Journal of Operations Research
  doi: 10.1007/s10288-016-0339-6
– volume: 301
  start-page: 797
  issue: 3
  year: 2022
  ident: 10.1016/j.ejor.2025.08.035_b4
  article-title: Assembly line balancing: What happened in the last fifteen years?
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2021.11.043
– volume: 23
  start-page: 525
  issue: 6
  year: 2020
  ident: 10.1016/j.ejor.2025.08.035_b20
  article-title: Near-linear-time approximation algorithms for scheduling a batch-processing machine with setups and job rejection
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-020-00657-4
– volume: 40
  start-page: 1044
  year: 2020
  ident: 10.1016/j.ejor.2025.08.035_b7
  article-title: Minimizing maximum delivery completion time for order scheduling with rejection
  publication-title: Journal of Combinatorial Optimization
  doi: 10.1007/s10878-020-00649-2
– volume: 212
  start-page: 1
  issue: 1
  year: 2011
  ident: 10.1016/j.ejor.2025.08.035_b25
  article-title: Order acceptance and scheduling: A taxonomy and review
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2010.09.042
– volume: 71
  start-page: 366
  issue: 3
  year: 1993
  ident: 10.1016/j.ejor.2025.08.035_b27
  article-title: Openshops with jobs overlap
  publication-title: European Journal of Operational Research
  doi: 10.1016/0377-2217(93)90347-P
– year: 1979
  ident: 10.1016/j.ejor.2025.08.035_b12
– volume: 18
  start-page: 1747
  year: 2024
  ident: 10.1016/j.ejor.2025.08.035_b14
  article-title: Improved approximation algorithm for the parallel machine customer order scheduling with delivery time and submodular rejection penalties
  publication-title: Optimization Letters
  doi: 10.1007/s11590-023-02073-x
– ident: 10.1016/j.ejor.2025.08.035_b8
  doi: 10.1145/3618260.3649730
– volume: 241
  start-page: 653
  year: 2015
  ident: 10.1016/j.ejor.2025.08.035_b21
  article-title: An improved heuristic for parallel machine scheduling with rejection
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2014.09.028
– volume: 123
  start-page: 333
  issue: 2
  year: 2000
  ident: 10.1016/j.ejor.2025.08.035_b6
  article-title: Approximation algorithms for knapsack problems with cardinality constraints
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(99)00261-1
– volume: 262
  start-page: 904
  year: 2017
  ident: 10.1016/j.ejor.2025.08.035_b22
  article-title: Bicriteria order acceptance and scheduling with consideration of fill rate
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2017.04.036
– volume: 607
  start-page: 181
  issue: 2
  year: 2015
  ident: 10.1016/j.ejor.2025.08.035_b17
  article-title: Penalty cost constrained identical parallel machine scheduling problem
  publication-title: Theoretical Computer Science
  doi: 10.1016/j.tcs.2015.10.007
– volume: 12
  start-page: 495
  year: 2024
  ident: 10.1016/j.ejor.2025.08.035_b31
  article-title: An approximation algorithm for the parallel-machine customer order scheduling with delivery time and submodular rejection penalties
  publication-title: Journal of the Operations Research Society of China
  doi: 10.1007/s40305-022-00430-8
– volume: 16
  start-page: 95
  year: 2018
  ident: 10.1016/j.ejor.2025.08.035_b16
  article-title: Vector scheduling with rejection on a single machine
  publication-title: 4OR. A Quarterly Journal of Operations Research
  doi: 10.1007/s10288-017-0356-0
– volume: 198
  start-page: 975
  year: 2009
  ident: 10.1016/j.ejor.2025.08.035_b28
  article-title: Single machine scheduling with release dates and rejection
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2008.10.006
– volume: 411
  start-page: 1877
  year: 2010
  ident: 10.1016/j.ejor.2025.08.035_b29
  article-title: Single-machine scheduling under the job rejection constraint
  publication-title: Theoretical Computer Science
  doi: 10.1016/j.tcs.2010.02.006
– volume: 16
  start-page: 3
  issue: 1
  year: 2013
  ident: 10.1016/j.ejor.2025.08.035_b24
  article-title: A survey on offline scheduling with rejection
  publication-title: Journal of Scheduling
  doi: 10.1007/s10951-012-0303-z
– volume: 129
  start-page: 317
  issue: 2
  year: 2001
  ident: 10.1016/j.ejor.2025.08.035_b11
  article-title: An extended enterprise planning methodology for the discrete manufacturing industry
  publication-title: European Journal of Operational Research
  doi: 10.1016/S0377-2217(00)00229-0
– volume: 43
  start-page: 346
  issue: 2
  year: 1995
  ident: 10.1016/j.ejor.2025.08.035_b23
  article-title: The two-stage assembly scheduling problem: Complexity and approximation
  publication-title: Operations Research
  doi: 10.1287/opre.43.2.346
– volume: 97
  start-page: 2507
  issue: 12
  year: 2020
  ident: 10.1016/j.ejor.2025.08.035_b9
  article-title: Vector scheduling with rejection on two machines
  publication-title: International Journal of Computer Mathematics
  doi: 10.1080/00207160.2019.1711373
– volume: 273
  start-page: 401
  issue: 2
  year: 2019
  ident: 10.1016/j.ejor.2025.08.035_b10
  article-title: Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures
  publication-title: European Journal of Operational Research
  doi: 10.1016/j.ejor.2018.04.033
– ident: 10.1016/j.ejor.2025.08.035_b26
  doi: 10.1145/3577530.3577568
– volume: 76
  start-page: 1077
  issue: 4
  year: 2016
  ident: 10.1016/j.ejor.2025.08.035_b2
  article-title: Approximating vector scheduling: Almost matching upper and lower bounds
  publication-title: Algorithmica
  doi: 10.1007/s00453-016-0116-0
SSID ssj0001515
Score 2.48491
Snippet In this paper we investigate two order scheduling problems with bundled operations on m dedicated parallel machines when outsourcing is allowed. In the first...
SourceID crossref
elsevier
SourceType Index Database
Publisher
SubjectTerms Approximation algorithm
Bundled operation
Dedicated machines
FPTAS
Order scheduling
Title Coordinated order scheduling and outsourcing on dedicated parallel machines
URI https://dx.doi.org/10.1016/j.ejor.2025.08.035
hasFullText 1
inHoldings 1
isFullTextHit
isPrint
journalDatabaseRights – providerCode: PRVESC
  databaseName: Elsevier SD Freedom Collection Journals 2021
  issn: 0377-2217
  databaseCode: AIEXJ
  dateStart: 19950105
  customDbUrl:
  isFulltext: true
  dateEnd: 99991231
  titleUrlDefault: https://www.sciencedirect.com
  omitProxy: false
  ssIdentifier: ssj0001515
  providerName: Elsevier
link http://cvtisr.summon.serialssolutions.com/2.0.0/link/0/eLvHCXMwtV1baxQxFD5oK6IPXlbFeiMPvi0jZpJMZh5LqXgpVbDivg0zucAu25my3dX-fE9us0NbRAVfwhJ2MpAvJF_OnO87AK8LJ5asGpbpktuMt1WZlQobKhlVLc2LMiB9JI-Py9ms-hILF577cgKy68qLi-rsv0KNfQi2k87-BdzDoNiBvxF0bBF2bP8I-IMe75PzrnFU0htrTvECiwfKMskR-83ah-x9vrPLhdVeB6enzgZ8uTTL6anPsIzZhdeF7SOFxY5VCiZG16Ahuvx54xfIvPu5FZsd-dSB72au-3hg-pB1zAqebbw2fhyHyMWQaBWDY1cEMkGUJWWW50GeeWW3DoGDxRuz6J01ay68m2qwL7nkgv3VjeQGQsrmauuwm7CbS1HhRra7_-Fw9nE4fh1D85-O4pujUiok9V1-0_VsZMQwTh7AvXg1IPsB0odww3QTuJ2UCRO4nypwkLghT-DuyE7yEXwaQU889GQLPUHoyQh60ndkgJ4k6EmC_jF8e3d4cvA-i8UyMkWLcp0x59vPW_cZlJtWNKKseNFIpSuJLFFxphvKmGilVUa3ytC3jtpbnWvOrWWWPYGdru_MUyCaK11wShX-lzNksFxYywXFy68VeWP2YJomrT4Lnih1ShZc1G6KazfFtatvysQeiDSvdWR1ga3VuAx-89yzf3zuOdzZLs8XsLNebcxLuKV-rOfnq1dxtfwCCX1zBA
linkProvider Elsevier
openUrl ctx_ver=Z39.88-2004&ctx_enc=info%3Aofi%2Fenc%3AUTF-8&rfr_id=info%3Asid%2Fsummon.serialssolutions.com&rft_val_fmt=info%3Aofi%2Ffmt%3Akev%3Amtx%3Ajournal&rft.genre=article&rft.atitle=Coordinated+order+scheduling+and+outsourcing+on+dedicated+parallel+machines&rft.jtitle=European+journal+of+operational+research&rft.au=Ou%2C+Jinwen&rft.au=Li%2C+Weidong&rft.au=Zhong%2C+Xueling&rft.date=2025-09-01&rft.pub=Elsevier+B.V&rft.issn=0377-2217&rft_id=info:doi/10.1016%2Fj.ejor.2025.08.035&rft.externalDocID=S0377221725006733
thumbnail_l http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/lc.gif&issn=0377-2217&client=summon
thumbnail_m http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/mc.gif&issn=0377-2217&client=summon
thumbnail_s http://covers-cdn.summon.serialssolutions.com/index.aspx?isbn=/sc.gif&issn=0377-2217&client=summon