Park, I., Lee, K., & Pinedo, M. (2025, September). A flow shop scheduling problem with machine-dependent speeds: An ensemble approach with worst-case analysis. European journal of operational research. https://doi.org/10.1016/j.ejor.2025.09.018
Chicago-Zitierstil (17. Ausg.)Park, Insoo, Kangbok Lee, und Michael Pinedo. "A Flow Shop Scheduling Problem with Machine-dependent Speeds: An Ensemble Approach with Worst-case Analysis." European Journal of Operational Research Sep. 2025. https://doi.org/10.1016/j.ejor.2025.09.018.
MLA-Zitierstil (9. Ausg.)Park, Insoo, et al. "A Flow Shop Scheduling Problem with Machine-dependent Speeds: An Ensemble Approach with Worst-case Analysis." European Journal of Operational Research, Sep. 2025, https://doi.org/10.1016/j.ejor.2025.09.018.