Guo, Y., Luo, W., & Xu, D. (2026). Single two-stage openshop and parallel two-stage openshops scheduling with optional job rejection under makespan constraint. Computers & industrial engineering, 212, 111695. https://doi.org/10.1016/j.cie.2025.111695
Citácia podle Chicago (17th ed.)Guo, Yanjie, Wenchang Luo, a Dehua Xu. "Single Two-stage Openshop and Parallel Two-stage Openshops Scheduling with Optional Job Rejection Under Makespan Constraint." Computers & Industrial Engineering 212 (2026): 111695. https://doi.org/10.1016/j.cie.2025.111695.
Citácia podľa MLA (8th ed.)Guo, Yanjie, et al. "Single Two-stage Openshop and Parallel Two-stage Openshops Scheduling with Optional Job Rejection Under Makespan Constraint." Computers & Industrial Engineering, vol. 212, 2026, p. 111695, https://doi.org/10.1016/j.cie.2025.111695.