Citace podle APA (7th ed.)

Whitlock, K., Abanda, F., Manjia, M., Pettang, C., & Nkeng, G. (2018). BIM for Construction Site Logistics Management. Journal of Engineering, Project, and Production Management, 8(1), 47-55. https://doi.org/10.32738/JEPPM.201801.0006

Citace podle Chicago (17th ed.)

Whitlock, K., F.H Abanda, M.B Manjia, C. Pettang, a G.E Nkeng. "BIM for Construction Site Logistics Management." Journal of Engineering, Project, and Production Management 8, no. 1 (2018): 47-55. https://doi.org/10.32738/JEPPM.201801.0006.

Citace podle MLA (9th ed.)

Whitlock, K., et al. "BIM for Construction Site Logistics Management." Journal of Engineering, Project, and Production Management, vol. 8, no. 1, 2018, pp. 47-55, https://doi.org/10.32738/JEPPM.201801.0006.

Upozornění: Tyto citace jsou generovány automaticky. Nemusí být zcela správně podle citačních pravidel..