Výsledky vyhľadávania - "multi-objective discrete artificial bee colony algorithm"

  • Zobrazené výsledky 1 - 6 z 6
Upresniť hľadanie
  1. 1

    Selective cooperative disassembly planning based on multi-objective discrete artificial bee colony algorithm Autor Ren, Yaping, Tian, Guangdong, Zhao, Fu, Yu, Daoyuan, Zhang, Chaoyong

    ISSN: 0952-1976, 1873-6769
    Vydavateľské údaje: Elsevier Ltd 01.09.2017
    “…Disassembly sequencing has significant effects on the performance of remanufacturing and recycling of used or discarded products. Studies on disassembly…”
    Získať plný text
    Journal Article
  2. 2
  3. 3

    Multi-Objective Multi-Picking-Robot Task Allocation: Mathematical Model and Discrete Artificial Bee Colony Algorithm Autor Dai, Lou-Lei, Pan, Quan-Ke, Miao, Zhong-Hua, Suganthan, Ponnuthurai Nagaratnam, Gao, Kai-Zhou

    ISSN: 1524-9050, 1558-0016
    Vydavateľské údaje: New York IEEE 01.06.2024
    “…With the advent of agriculture 4.0 era, the combination of agriculture and unmanned technology has promoted the development of intelligent agriculture…”
    Získať plný text
    Journal Article
  4. 4

    Energy Saving in Single-Machine Scheduling Management: An Improved Multi-Objective Model Based on Discrete Artificial Bee Colony Algorithm Autor Jia, Jing, Lu, Chao, Yin, Lvjiang

    ISSN: 2073-8994, 2073-8994
    Vydavateľské údaje: Basel MDPI AG 01.03.2022
    Vydané v Symmetry (Basel) (01.03.2022)
    “…Green manufacturing, which takes environmental effect and production benefit into consideration, has attracted increasing concern with the target of carbon…”
    Získať plný text
    Journal Article
  5. 5

    An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption Autor Yüksel, Damla, Taşgetiren, M. Fatih, Kandiller, Levent, Gao, Liang

    ISSN: 0360-8352, 1879-0550
    Vydavateľské údaje: Elsevier Ltd 01.07.2020
    Vydané v Computers & industrial engineering (01.07.2020)
    “…•Total tardiness & total energy consumption minimization are addressed for NWPFSP.•MILP and CP models are proposed for bi-objective NWPFSP.•3 metaheuristic…”
    Získať plný text
    Journal Article
  6. 6

    Decomposition-based multi-objective approach for a green hybrid flowshop rescheduling problem with consistent sublots Autor Wang, Weiwei, Zhang, Biao, Jiang, Xuchu, Jia, Baoxian, Sang, Hongyan, Meng, Leilei

    ISSN: 0020-7543, 1366-588X
    Vydavateľské údaje: London Taylor & Francis 01.11.2024
    “…Rescheduling in a hybrid flowshop holds significant importance in modern industries that face uncertain events. Moreover, real-world manufacturing scenarios…”
    Získať plný text
    Journal Article